Each one in plain English, with the numbers worked through for a shareholder.
12 Oct 2009drilling result▲ Good
Savoyardy hole DD32 hit 1m at 8.07g/t on Section 4.5, giving high-grade results on three sections over 75m strike, about 200m from the resource. UD24 returned 1m at 9.61g/t and 0.9m at 11.3g/t. Two holes on Section 6.5 had no significant results.
More Savoyardy results: DD36 6m at 9.91g/t and DD43 3.5m at 9.77g/t on Section 6, shallow and about 200m along strike from the resource, plus underground UD23 2.3m at 19.7g/t. Supports a resource increase; remaining assays expected within two months.
Savoyardy hole DD40 hit 3m at 16.2g/t gold (about 1m true width), about 150m along strike from the resource, under 100m deep. A rock chip north of Rudny Stream assayed 11g/t. Nine-hole surface and seven-hole underground programs are complete; five more surface holes approved.
Second underground hole UD28 intersected 2.95m at 7.8g/t gold, 30m below the earlier UD48 intercept, again showing the resource continuing at depth. Five more surface holes approved for shallow mineralisation.
First 2009 Savoyardy underground hole UD48 hit 1.9m at 7.05g/t and 3.05m at 6.3g/t gold, 20m below the lowest level in the resource. The drilling extension is likely, with UD28 results pending.
Drilling began at Savoyardy to expand the 35,500oz inferred resource, as the planned July start. Two surface rigs test ground about 200m southwest of the resource, with a third underground rig starting within days. Production still targeted for 2010, subject to a late-2009 decision.
First Andash ore reserve: 540,000oz gold and 63,000t copper, prepared by Wardell Armstrong using US$525/oz gold. The resource, unchanged at about 680,000oz, converts to reserve at a high rate. Still under option, with due diligence under way and 2011 start-up targeted.
Maiden Savoyardy inferred resource: 35,500oz (160,000t at 6.76g/t gold, 3g/t cut-off, hand mining assumed). It confirms the drilling program that began in 2008. Resource remains open along strike; more drilling planned in 2009 and early production options will be examined.
First Kurgan results from the 2008 program: trench sampling best 3g/t gold over 3m and 2g/t over 3m, from two trenches about 300m apart. More soil sampling, trenching and then drilling are planned for 2009. Early-stage only.
Final Savoyardy underground sampling gave high grades, including 3.0m at 29.6g/t and 0.6m at 77.5g/t gold. These are the last data needed, with the first JORC resource due in about 10 days, as targeted for end 2008.
Savoyardy hole SVD_DD_22 hit 11.5m at 2.1g/t gold in a new structure 250m east of Rudny. 40 of 43 holes (4,080m) are done. First resource estimate is now expected December 2008.
Further Savoyardy assays include 1.0m at 21.4g/t and 7.0m at 6.3g/t gold, ending in mineralisation, from the first drilling south along the Rudny structure. Twenty-eight of 43 planned holes are complete. IP survey planned.
Kazakh consent obtained to release Khantau data: best intersection 154.5m at 44.1% Fe2O3, 0.6% Cu, 1g/t Au; mineralisation continuous over 400m, open along strike and down dip. 26 magnetic anomalies over 40km. Follows the 31 July MOU; results are the vendor's drilling, partly unverified.
More Savoyardy assays, best 0.5m at 34.2g/t gold and 5.7m at 5.9g/t. Eighteen holes (1,755m) of the 4,500m program are done, with ten holes still awaiting lab processing. Modest results compared with earlier intercepts.
First two 2008 underground Savoyardy holes returned 9.4m at 13.3g/t gold and 5.5m at 12.8g/t gold. Ten holes (915m) are drilled; more assays are due early July. A maiden JORC resource is still targeted for end of 2008.
Underground drilling at Savoyardy is due to start by end of April: 15 holes for 1,500m with two rigs, within a 4,500m 2008 program. A first JORC resource for Rudny is targeted by year end. Drilling at Akbel stopped because the moraine could not be penetrated; focus shifts to non-moraine anomalies from June.
Panax Geothermal exercised its option to enter the Kyrgyz geothermal joint venture after a six-month evaluation. It can earn 51% by spending A$5m over four years, and a further 10% for A$1m more. Resolves the September 2007 MOU.
Panax Geothermal committed to the Kyrgyz geothermal joint venture after its six-month evaluation, able to earn 51% by spending A$5m over four years, plus a further 10% for A$1m. Panax measured 78C at 700m depth at Inylchek (gradient over 100C/km). Repeats the 12 March release.
Best Savoyardy result to date: 15m at 14.2g/t gold from 21m in hole SVD_PD_07, including 2m at 43.9g/t, plus 6.5m at 7.9g/t in SVD_PD_11. The intercept is shallow, only 21m down the hole, extending the earlier high-grade results.
Further Savoyardy assays: best new intersection was 4.2m at 14.38g/t gold in hole SVD_PD_06. Surface drilling is suspended for winter and expected to resume April 2008, with underground drilling from a rehabilitated adit planned from March 2008.
More Savoyardy assays: best was 4.3m at 27.7g/t gold in hole SVD_PD_04, with three more holes partly reported. Two rigs continue the 23-hole, 1,500m program, aiming to finish before winter. Management says grades appear to increase with depth.
First Savoyardy hole SVD_PD_09 returned 14m at 15.1g/t gold, about 8m true thickness, roughly 20m below the Soviet adit. Part of a 23-hole program. Early confirmation of the Soviet-era high grades; other holes are still awaiting assay.
Diamond drilling has started at Savoyardy, a 1,500m program to outline a first JORC resource. It tests 300m of strike to about 90m depth, following Soviet-era workings that showed high-grade gold. Follows the August target; results are the next step.
Media release repeats the Savoyardy deal with Perseus to earn 70% for US$6m. Adds that an adit has explored only 500m of a 12km licence strike, and Majestic Gold reports over 1.4Moz across the Chinese border. Kentor aims for a JORC resource quickly.
Perseus announces a joint venture letting Kentor earn 70% of its Savoyardy gold licence in southern Kyrgyzstan by spending US$6m by March 2012. Kentor must spend US$500k by March 2008 to stay in. Effective after due diligence by 23 June 2007.
Kentor signs a Heads of Agreement to earn 70% of Perseus's Savoyardy gold licence by spending US$6m by March 2012, with US$500k minimum by March 2008. Soviet-era work found gold in trenches and adits; no significant drilling has been done. Adds an advanced gold project.
23 Apr 2007farm in farm out agreement● NeutralMajor
Heads of Agreement to earn up to 80% of five Northern Territory uranium licence applications (3,020 sq km) via a new subsidiary; Kentor starts at 55%, issuing 1m shares and A$100k at completion, and funding up to A$4m more. Conditional on a capital raising for which AGM approval is sought.
Akbel winter drilling is underway: AKB DD007 completed to 384m, reaching bedrock at 135m depth, and DD008 started at Ishak Kechuu. The RD1500 rig is on rail in Kazakhstan. No assay results yet.
New Akbel soil sampling found MMI gold anomalies (20-250ppb) along 20km of the Kumtor trend, some on the interpreted host black shale. The RD850 rig has restarted drilling; the RD1500 is still being moved in. Targets only, no drill results.
Diamond drilling restarted for 2006 at Uzunbulak, with two scout holes (350-450m total) testing porphyry copper-gold targets A and B. The rig then returns to Akbel to resume the Kumtor-style gold program.