Each one in plain English, with the numbers worked through for a shareholder.
24 Nov 2020resource reserve update● Neutral
Corvus filed the full technical report for the North Bullfrog preliminary economic assessment (gravity milling and heap leach processing), issued November 21, 2020 with an effective date of October 7, 2020. This is the companion to the Mother Lode report filed the day before; the filing text gives no economic results, which are inside the attached report. It repeats that SEC mining disclosure rules do not apply to the company until its fiscal year beginning May 31, 2021.
Corvus filed the full technical report for the Mother Lode PEA, titled as covering Biox mill and heap leach processing, issued November 21, 2020 with an effective date of October 7, 2020, matching the October 2020 PEA announcement. The filing text gives no economic results; they are inside the attached report. It also notes the company need not follow the SEC's new mining disclosure rules until its fiscal year beginning May 31, 2021.
Corvus announced results of a Preliminary Economic Assessment (PEA) for its Mother Lode project in Nevada. The filing gives no figures; they are only in the attached press release. Together with the North Bullfrog PEA filed the same day, it suggests the two projects are now assessed separately, but that is an inference.
Corvus announced results of a new Preliminary Economic Assessment (PEA) for its North Bullfrog project in Nevada. The filing gives no figures; they are only in the attached press release. This is a new study for North Bullfrog on its own, after the November 2018 PEA that combined it with Mother Lode.
Corvus reported what it calls positive assay results from the upper part of its first diamond core hole at the North Deep target at Mother Lode, a hole designed to test the link between an intrusion and the Mother Lode gold system at depth. The filing gives no numbers; they are only in the attached press release.
Corvus reported assay results from two reverse circulation drill holes in its ongoing Phase 4 Mother Lode resource expansion program in Nevada. The filing gives no grades or intervals; those are only in the attached press release.
Corvus reported assay results from two more holes in the Phase 4 Mother Lode resource expansion drill program in Nevada. The filing gives no results; the numbers are only in the attached press release.
Corvus reported initial assay results from its Phase 4 resource expansion drilling at the Mother Lode project in Nevada, continuing the expansion drilling already under way there. The filing gives no grades or lengths; those are only in the attached press release.
Corvus announced assay results from follow-up drill holes at the Cat Hill target, which it says defines a new vein/stockwork gold system on the North Bullfrog property in Nevada. The filing gives no grades or intervals; those are only in the attached press release.
Corvus issued a project update on mining optimization work for the district-wide production plan from its November 2018 PEA for North Bullfrog and Mother Lode. The filing gives no results or changed figures.
Corvus reported assay results from the final five holes of the Phase III resource expansion program at Mother Lode. The filing gives no figures, so the results are not described.
Corvus filed a new Preliminary Economic Assessment (issued November 1, 2018, effective September 18, 2018) that combines the North Bullfrog and Mother Lode projects into one plan. It builds on the earlier North Bullfrog-only PEA (2015, amended 2016). The filing text gives no economic figures, and the SEC notice warns that resources are uncertain and are not reserves.
Corvus reported assay results from the final eight holes of its 2017 Phase I drill program at Mother Lode, completing the reporting of that program. The filing gives no figures.
Corvus reported more assay results, from ten new drill holes at Mother Lode in southern Nevada. The filing gives no numbers, so the results themselves are not described.
Corvus reported further assay results from three new drill holes at its Mother Lode project in southern Nevada, the property acquired in June 2017. The filing gives no grades or intercepts, so the quality of the results is not stated.
Corvus announced updated mineral resource estimates for North Bullfrog that include all drill results through 2017. The filing itself only refers to the press release and gives no figures, so the size of any change cannot be stated.
Corvus filed an amended and restated version (dated May 18, 2016) of its North Bullfrog PEA technical report, with the same four authors and new consents from each. The portion provided does not say what was changed, so no change to the PEA results can be stated.
Corvus issued a press release saying it has filed the full technical report for the North Bullfrog PEA, and states there are no material differences from the June 16, 2015 news release. It restates the PEA headline numbers already known: post-tax NPV (5%) of US$246M at $1,200 gold (US$103M at $1,000), 38% IRR, initial capital of about US$175M, cash cost of US$635/oz and a 10-year life. The company repeats that the PEA is preliminary and may not be realized.
Corvus filed with the SEC the full technical report (dated June 16, 2015) behind its June 2015 North Bullfrog preliminary economic assessment, prepared by Scott Wilson, Stephen Batman, Herbert Osborne and William Pennstrom. It supports the PEA already announced in June; the portion provided here contains no new figures, and the filing repeats that inferred resources are highly uncertain and not reserves.
3 Aug 2015farm in farm out agreement● NeutralMajor
Corvus's Alaskan subsidiary sold the West Pogo project and Goodpaster database to Millrock Resources for US$120,000 in cash, keeping net smelter return royalties, and gave Millrock until September 1, 2015 to option the LMS project (US$775,000 over 5 years, with a retained 3% precious-metals royalty). The company calls these non-core and says the cash will fund exploration at North Bullfrog in Nevada, so it is moving away from the Alaskan assets it reported on in the 2014 LMS technical report. The LMS option is not yet exercised.
Corvus released a preliminary economic assessment (PEA) and updated resource estimate for its North Bullfrog project in Nevada, built around the newly discovered Yellowjacket deposit. At $1,200 gold the study shows a post-tax NPV (5%) of US$246 million, 38% IRR, initial capital of US$175 million and a 10-year mine life; the company states the PEA is preliminary and there is no certainty it will be realized. It also reports that 91% of the Yellowjacket mill resource is now Measured & Indicated, up from under 20% in 2014.
Corvus filed with the SEC a technical report on its LMS Gold Project in Alaska's Goodpaster Mining District, dated October 22, 2014 (effective August 1, 2014) and prepared by Ed Hunter and Gary Giroux. The 8-K is a disclosure filing that furnishes the report; the part of the report provided here does not include the resource figures, so no numbers can be stated.