Each one in plain English, with the numbers worked through for a shareholder.
31 Mar 2025farm in farm out completion▲ GoodMajor
WEC earned a 51% interest in Specimen Hill after spending over $1M in 12 months, against a three-year allowance. It is proceeding to the second stage: a further $1M for another 25%. Early-stage project; no resource is defined.
25 Mar 2025capital raising announcement● NeutralMajor
The entitlement offer raised $3.83M before costs: 112,635,630 new shares at $0.034 were taken up, against a maximum of about 132.7M. A 20,019,604-share shortfall remains, which directors may place within 3 months. Shares issue 27 March.
What it means for a shareholder
113m new shares at A$0.034 to raise about A$3.8m. That's 13% dilution: every existing holder's slice gets 13% smaller. If you held A$1,000 of shares (29,412 at the issue price), your slice goes from 0.0038% to 0.00332% of the company. To keep it you'd need 4,277 more shares - about A$145 at the issue price.
Half-year report to 31 December 2024 (truncated). It describes BCB coal work with Proterra in South Africa and the copper-focused exploration portfolio, with the same four directors. Financial figures are not visible in the text provided. Routine.
Coronation drilling (six holes, 1,706 m, max depth 416.3 m) found rock types that host IOCG deposits elsewhere, but assays did not match the soil anomalies. Best copper was 296 ppm, 71 times background. Basement averaged about 37 m deep. Early copper-sulphide hints did not translate into significant assays.
Notice that offer documents for the 2-for-3 entitlement offer at $0.034 were sent to eligible shareholders on 6 March 2025, with acceptances made online via Automic. Administrative.
The 2-for-3 entitlement offer is now open and closes 5:00pm AEDT on 20 March 2025 unless extended. Offer documents have been despatched to eligible shareholders. Administrative.
Offer booklet for the 2-for-3 entitlement offer at $0.034 per share, closing 20 March 2025. It sets out the terms already announced the same day. Eligible holders can also apply for extra shares from any unclaimed entitlements. Administrative document.
26 Feb 2025capital raising announcement● NeutralMajor
WEC launched a 2-for-3 renounceable entitlement offer at $0.034 per share to raise up to $4.51M, not underwritten. Funds go to Specimen Hill, Tindal and Maranoa exploration, Coronation rehabilitation, working capital, and possibly repaying loans from Flannery's associated entity. Last May's raise was $0.04.
Notice to shareholders outside Australia and New Zealand that they cannot take part in the $0.034 entitlement offer. A nominee will sell their entitlements and pass on any net proceeds. Administrative.
All AGM resolutions passed by poll, including a special resolution amending the Constitution by adding a new Clause 2.9. The text provided does not say what Clause 2.9 covers. Administrative.
At the 2024 AGM the Chairman called the Bayan litigation's roughly $900,000 recovery 'very unsatisfactory' but final. The CEO said South Africa briquetting is moving to a phase 2 plant and MCC's wash plant auction is due December 2024. Copper exploration results are expected within six months.
Specimen Hill update: a helicopter magnetic survey covered 68.8 km² (27% of the project area). New 2024 rock chips returned up to 3.01% Cu and 3.8 g/t Au; historic samples showed over 20% Cu. Drill targets are still being defined. No drilling yet.
Annual report 2023/24: the EBITDA loss was $4.6M versus $3.5M, mainly from Bayan litigation and liquidation costs. Early Coronation drilling showed copper sulphides consistent with IOCG-style mineralisation. MCC still owes about US$1.74M and is in Chapter 7 bankruptcy; WEC received about $0.9M from the BCBCS liquidators.
Full-year accounts to 30 June 2024 (truncated). They describe BCB coal technology work with Proterra in South Africa and mineral exploration, with the same four directors and no dividend. Routine; headline figures are not visible in the text provided.
WEC has all approvals to drill the Coronation prospect at Robin Rise, South Australia, in the Olympic Dam corridor. 4-5 holes over about 5 weeks will test for IOCG-style copper-gold, with basement expected at 90-150 m. Results will follow; no result yet.
CEO presentation at the Noosa Mining Conference (text truncated). It describes five Australian copper-gold exploration projects using deep crustal geophysics, ionic geochemistry and machine learning, and lists the board. No new results visible in the available text.
31 May 2024capital raising announcement● NeutralMajor
The $0.04 entitlement offer raised $3.43M (85.7M shares), short of the up to $4.53M sought. 27.5M shares went unsubscribed; directors may place them within 3 months. Funds go to Specimen Hill, Robin Rise's Coronation prospect and Tindal exploration.
WEC settled with Bayan, ending all Singapore and Western Australian proceedings with mutual releases. This resolves the long-running KSC litigation. The $2M court-held security is released, and BCBC expects about $900,000 from the BCBCS liquidation.
Offer documents for the $0.04 entitlement offer were sent to eligible shareholders and the offer is now open, closing 5:00pm AEST on 29 May 2024 unless extended. Administrative.
Notice that shareholders outside Australia and New Zealand cannot take part in the $0.04 entitlement offer. A nominee will sell their entitlements and return any net proceeds. Administrative.
3 May 2024capital raising announcement● NeutralMajor
WEC launched a new 1-for-1 renounceable entitlement offer at $0.04 a share to raise up to $4.53M (up to 113.2M shares), not underwritten. Funds go to Specimen Hill, Robin Rise and Tindal exploration. The price is below November's $0.065 offer.
What it means for a shareholder
113m new shares at about A$0.040 to raise about A$4.5m. That's 13% dilution: every existing holder's slice gets 13% smaller. If you held A$1,000 of shares (24,989 at the issue price), your slice goes from 0.00323% to 0.00282% of the company. To keep it you'd need 3,652 more shares - about A$146 at the issue price.
Half-year report to 31 December 2023 (partly truncated). It restates the strategy: BCB coal briquetting with Proterra in South Africa, and copper-focused exploration at Tindal, Maranoa and Robin Rise. The South African pilot plant is due to be commissioned in March 2024. Routine.
WEC can earn 51% of the Specimen Hill copper-gold project near Biloela, Queensland, from Tectonic Gold's subsidiary by spending $1M within 3 years, then 76% with a further $1M. An option for the last 24% costs $2M, leaving a 3% royalty. Sampling shows promising copper.
19 Dec 2023capital raising announcement● NeutralMajor
The 1-for-1 entitlement offer at $0.065 raised $2.91M (44.83M shares), well short of the up to $4.45M sought. 23.58M shares went unsubscribed; directors may place them within 3 months. Proceeds fund the Bayan case and repay the remaining $0.5M Flannery-linked loan.
WEC moved its principal place of business to Newstead, Brisbane, effective 27 November 2023. Phone, fax and the Sydney registered office are unchanged. Administrative notice only.
Entitlement offer documents were sent to eligible shareholders and the offer is now open, closing 5:00pm AEDT on 15 December 2023 unless extended. Administrative.
AGM addresses: Chairman calls the Bayan outcome disappointing and says the BCBC Singapore liquidator holds claims of S$157M (WEC) and S$4.1M (Bayan). The CSIRO briquetting patents expire in 2024. US$1.74M is still owed from the Mountainside sale, with foreclosure possible. WEC is renting a briquette machine to the South Africa trial.