Each one in plain English, with the numbers worked through for a shareholder.
1 Apr 2020director officer appointment▲ Good
Robert Ierace appointed Chief Financial Officer and Company Secretary from 1 April 2020, with over 20 years' experience in resource and oil and gas companies. Mauro Piccini resigns as Company Secretary. Adds a dedicated finance role.
Update says preparations are underway for the pre-feasibility study, including lab and pilot plant testwork for battery-quality lithium hydroxide. An Australian virtual investor roadshow starts 17 March, replacing a planned in-person one 'due to recent global events'. No new results.
March 2020 corporate presentation restating the 13.95Mt LCE resource and the positive scoping study. Repeats known facts; no new results visible in the text provided.
Explains the capital structure change: scoping study milestone converted performance securities on 28 Feb 2020, but 480,000 shares lifting Dr Wedin above 20% voting power were issued in error, voided and reinstated. Ordinary shares now 47,450,002; MD's voting power rose from 14.40% to 20.16% before correction.
Shares suspended again at the company's request pending an announcement clarifying its capital structure, expected by 16 March 2020. Issued capital is shown as 53,670,002, up from 48,500,002 previously, with no explanation in this text.
Half-year report to 31 December 2019 for the company formerly called Koppar Resources. Text provided is truncated and shows only the directors' report overview, restating the 13.95Mt LCE resource and board changes; no financial figures visible.
ASX confirms the suspension will lift from the start of trading on 16 March 2020, following the capital structure clarification. Administrative; no new project information.
Q1 2020 corporate presentation summarising the scoping study and the 13.95Mt LCE Indicated and Inferred resource already announced. Repeats known facts; no new results.
Positive scoping study for a two-stage plan: Stage 1 lithium extraction and hydroxide plant at an operating geothermal plant (Insheim), Stage 2 ten new wells at the Ortenau licence. Offtake and financing talks begun; pre-feasibility study targeted for late 2020. Economic figures not visible in the text provided.
Shares suspended at the company's request pending the scoping study results, which it expects to announce by pre-market open on 19 February 2020. Market cap was about $12M at 25.5c. A short, planned pause before the long-flagged study.
Maiden Indicated resource at the Insheim licence of 722,000t LCE at 181mg/l Li, higher confidence from producing-well data. Combined Vulcan resource is now 13.95Mt LCE across 2 of 6 licences. Scoping study still on track for Q1 2020.
Dr Horst Kreuter, previously in-country geothermal principal, joins as executive director on €115,000 a year with a three-month notice period. Adds a board member ahead of Burke's year-end departure, partly addressing the board recruitment thread.
Lodgement of the company constitution adopted by special resolution on 19 November 2019. Administrative copy of a document already approved at the AGM; no new operational or financial information.
Maiden JORC Inferred resource for the Ortenau licence of 13.2Mt contained lithium carbonate equivalent at 181mg/l Li, 100mg/l cutoff. Delivers the resource flagged as imminent; company calls it Europe's largest. Covers one of five licence areas; scoping study now due Q1 2020.
December 2019 project update presentation repeating the 13.2Mt LCE resource just announced, the Pfalzwerke agreement and the 2023 production target. No new figures or results.
Shares also listed on the Frankfurt Stock Exchange under code 6KO, completing the dual listing evaluated earlier. The company says it was possible without a primary listing process or significant cost. Aims to widen investor reach and liquidity.
Brine sampling of Upper Rhine geothermal wells returned 104-215mg/l lithium (average 181mg/l), above expectation. Insheim, covered by the Pfalzwerke MoU, had the highest average. Results feed a maiden resource estimate expected imminently. Wells sampled lie mostly outside Vulcan's licences.
Vulcan signed an MoU with Pfalzwerke geofuture over the operating Insheim geothermal plant. Vulcan can earn up to 80% of the lithium rights by completing pre-feasibility and definitive feasibility studies, starting at 0% and funding a demonstration plant, without drilling its own geothermal well.
Non-executive director Bill Oliver resigned, to focus on other roles and let the company recruit a new director for its European focus. With Burke also leaving at year-end, the board is down to Wedin, Rezos and Burke.
Non-executive director Patrick Burke will resign effective 31 December 2019, to pursue other interests and let the board recruit a different skills mix for its European focus. Continues the board reshaping after the Vulcan deal.
Corporate presentation noting the company is proposed to be renamed Vulcan Energy Resources and that the scoping study is nearing completion. Repeats the 10.73-36.20Mt LCE Exploration Target and 2023 production aim; no new results.
Appendix 4G governance disclosure lodged with the annual report, pointing to the company's website governance policy. Administrative; no new operational or financial information.
Annual report for the year to 30 June 2019, confirming Rezos and Wedin appointed 4 September 2019 and Morgan's resignation. Visible text shows no financial figures, so cash and loss are not stated here.
Corporate governance statement current at 26 September 2019, saying the board does not use separate committees given its size. Administrative; no new operational or financial information.
Koppar completed the Vulcan Lithium Project acquisition on the 10 July terms. Francis Wedin became Managing Director and Gavin Rezos Chairman; Rebecca Morgan resigned. Issued capital is 48,500,002 shares. Scoping study targets end-2019; Norwegian target ranking continues.
Scoping study started at Vulcan, with engineering firm Hatch engaged to design an integrated geothermal and lithium extraction plant. Follows the 10.73-36.20Mt LCE Exploration Target. Study outcomes not yet reported.
August 2019 presentation on the Vulcan zero-carbon lithium project, repeating the 10.73-36.20Mt LCE Exploration Target (conceptual) and the Hatch-led scoping study already announced. Francis Wedin is described as proposed Managing Director. No new figures.