Each one in plain English, with the numbers worked through for a shareholder.
7 Jan 2026drilling result▲ Good
Anuiri and Jonction infill results, such as 51m @ 2.48g/t and 15.35m @ 5.39g/t, are consistent with the existing models and expected to give modest Anuiri growth. All infill assays are now in, and rigs focus on exploration.
Woulo Woulo infill drilling confirmed continuity, with 134m @ 1.07g/t, and Herman returned shallow high-grade, such as 8m @ 4.30g/t. A maiden Herman resource is planned in the update due by end 1Q CY2026; PFS still due 2Q CY2026.
Presentation for investor briefings in the week of 17 November, titled 'Rapidly Growing 4.1 Million Ounces'. The text provided is mostly disclaimers and shows no new results.
Afema resource rises to 4.06Moz (102.9Mt @ 1.2g/t), up more than 500koz from 3.55Moz five months earlier. Includes maiden Begnopan (260koz) and Toilesso (40koz) and Asupiri up to 1.02Moz. Next update due 1Q CY2026; PFS due 2Q CY2026.
Administrative notice: Turaco has reviewed and updated its Securities Trading Policy and lodged the revised policy as required by ASX Listing Rule 12.10. No new business information.
Five diamond holes at Adiopan confirm a significant new discovery, best 16m @ 5.03g/t and 25m @ 2.48g/t, following the August maiden holes. Asupiri infill also positive. An MRE update excluding Adiopan is due within weeks; PFS due 2Q CY2026.
Managing Director Justin Tremain sold 2.4M shares at 45.3c, under 10% of his fully diluted holding, and says he has no intention to sell more in the medium term. He retains 29.8M shares and incentive rights.
Half-year to 30 June 2025: net loss A$10.9M, cash A$75.9M (A$32.9M at end 2024). Net assets rose A$57.5M over the half, with over 40,000m drilled at Afema. Alan Campbell resigned 16 May.
Begnopan drilling returned up to 8m @ 6.36g/t over about 3km of strike, and metallurgy showed 89% gold extraction. A maiden Begnopan resource is planned for the Q4 2025 update to the 3.55Moz total. Five rigs are now drilling.
Drilling outside the 3.55Moz resource found new mineralisation at Adiopan, with results including 25m @ 2.66g/t and 21m @ 3.24g/t. Asupiri and Anuiri also extended, with 3m @ 16.32g/t at a new zone near Anuiri. Cash is over A$80M.
Presentation for the Diggers and Dealers forum, titled 'Rapidly Growing 3.6 Million Ounce Gold Camp'. The text provided is mostly disclaimers and shows no new results.
14 July 2025capital raising announcement▲ GoodMajor
The Share Purchase Plan closed having raised the A$4M target through about 9.1M shares at 44c, after about A$10M of applications were received and scaled back. This completes the June raising; cash is over A$85M.
What it means for a shareholder
9.1m new shares at $0.440 to raise about $4.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Scout drilling next to Woulo Woulo hit 4m @ 82.01g/t, including 1m @ 324.58g/t, an isolated hole with no drilling along strike. Baffia returned 14m @ 1.19g/t. A fourth rig is now drilling, and cash is over A$85M.
The Share Purchase Plan, which was due to close 11 July, is closing early on 9 July because applications exceeded the A$4M target. Applications will be scaled back.
3 July 2025asset acquisition disposition● NeutralMajor
Santa Fe Minerals announces agreements to buy Turaco's Eburnea project: Satama permit (100%) and Bouake North application (65%, rising to 80% on grant). Santa Fe is raising A$1.2M at 5c. Deal needs ASX and shareholder approval; Turaco's consideration is not in the text provided.
3 July 2025asset acquisition disposition● NeutralMajor
Turaco agrees to sell its Eburnea project to Santa Fe Minerals for 12M Santa Fe shares (about 11% post-raising, 12-month escrow) plus 4M performance rights tied to 0.5Moz and 1.0Moz resources. Completes the earlier Santa Fe announcement; needs approvals and a raising of at least A$1M.
Offer letter for the Share Purchase Plan: eligible Australian and New Zealand holders can buy A$2,500 to A$30,000 of shares at 44c, aiming for up to A$4M. Closes 11 July 2025; the board may scale back applications.
18 June 2025capital raising announcement▲ GoodMajor
Turaco raises about A$60M at 44c per share, a 9.3% discount, with bids well above the size sought. Pro forma cash is over A$83M, and a Share Purchase Plan of up to A$4M at the same price is planned. Funds go to drilling and feasibility work.
Drilling at Toilesso, 2km north of Jonction, returned e.g. 25m @ 1.75g/t and 6m @ 4.24g/t, and Jonction extension holes hit 7m @ 7.08g/t. An IP survey is being expanded; the company says these support short-term growth of the 3.55Moz resource.
May 2025 presentation titled 'Rapidly Growing 3.6 Million Ounce Gold Camp'. The text provided is mostly disclaimers and shows no new results beyond the 3.55Moz resource already announced.
Turaco retracts the '5-6Mtpa development' wording in its 3.55Moz resource release, because it could be read as a production target not disclosed in line with listing rules. A corrected version is attached; the resource figures are unchanged.
Afema resource rises over 40% to 3.55Moz (90.8Mt @ 1.2g/t) from 2.52Moz, including a maiden 820koz at Asupiri. A pre-feasibility study is to start, due H1 2026, and a further resource update is targeted by end of 2025.