31 July 2020quarterly activities report● Neutral
June quarter report restates the optimised Theta study, Digmin as preferred miner and the A$4.0m placement. Environmental authorisation is expected Q4 2020, with trial mining at the end of 2020 permit-dependent. The plant tender is ongoing. Cash figures not visible in extract.
31 July 2020security holder rights change● Neutral
400,000 unlisted options (expiring July 2022, $0.35 and $0.40) lapsed on 19 July 2020 because vesting hurdles weren't met. Shares on issue are 454,415,950, with 33.75m listed options and 27.87m unlisted options and performance rights. Administrative.
Geotechnical drilling and a geophysical survey have started at the Starter Theta pit, covering waste dump and pollution dam areas, with design engineering due by end-September. Trial mining is still planned for late 2020, and COVID lockdowns have not affected site works.
Digmin Group selected as preferred mining contractor for the Theta starter project, with costs said to remain in line with the May 2019 study. Trial mining is planned for end-2020 once the open-pit authorisation arrives, now expected Q4 2020 (earlier guidance: mid Q2). Plant tender result due Q3 2020.
17 July 2020capital raising announcement▲ GoodMajor
Oversubscribed placement of 16,667,084 shares at $0.24 (10.6% discount to 20-day VWAP) raising $4.0m before costs, led by Sanlam Private Wealth. Funds go to the Theta starter project, reserve-conversion drilling and working capital, ahead of project financing.
Theta's OTCQB shares (TGMGF) are now DTC-eligible, allowing electronic clearing and US online-broker trading. This resolves the application lodged on 2 April 2020 and is expected to broaden access and liquidity for US investors.
11 May 2020director officer appointment● NeutralMajor
Managing Director Robert Thomson, who has led the company since November 2016, will step down from executive duties on 5 August 2020 and stay on as a non-executive director. South African operations continue under CEO George Jenkins.
March quarter report restates the optimised study (US$31.4m capex, NPV5 US$85m), plant tender at 600ktpa with contractor selection expected H1 2020, and mill on site. MR83 amendment application is being updated for the optimised schedule. Cash figures not visible in extract.
Placement of 4,650,000 shares at $0.20 to raise $930,000, with free attaching options ($0.30 listed to Oct 2020; $0.40 unlisted to Apr 2022). Funds go to the Theta project, exploration and working capital. Formal talks with debt financiers on project finance have begun.
April 2020 investor presentation on the 5-year production plan and optimised starter pits. Visible text is disclaimers only; it appears to repeat the optimised study, with no new figures in the extract.
Notice of three investor webinars on 21 and 22 April 2020, hosted by the Chairman, to discuss the optimised mine schedule announced that morning. Administrative; no new information.
Optimised Theta open-pit schedule adds 40,000oz over the May 2019 study: 260koz to plant over 6.5 years, 600ktpa, capex US$31.4m (was US$34.3m), NPV5 US$85m (was US$50m), IRR 123% (was 65.1%), AISC US$855/oz, at US$1,500/oz gold.
Theta has lodged its application for DTC eligibility in the US, which would let US retail investors trade its OTCQB shares (TGMGF) through online brokers. Approval is expected in the current calendar quarter. This advances the open DTC thread.
The 2.5MW ball mill bought in October 2019 reached the Pilgrim's Rest site on 23 March 2020 after a six-day trip from Rustenburg. This delivers the long-lead item expected earlier; plant construction tenders are still due late Q2 2020.
Regional rock-chip sampling returned gold up to 84 g/t at Vaalhoek, 42 g/t at Rietfontein and 35 g/t at Elandsdrift; 88% of samples carried gold. Satellite data flagged four alteration zones (13.5 km). Early surface results only; drilling is future work.
Half-year to 31 December 2019: loss of US$2.699m versus US$1.896m a year earlier. Reviews ball mill purchase, 600ktpa study and MR83 open-pit submission. Balance sheet and cash not visible in extract.
Environmental assessment for amending MR83 from underground to open-pit has been submitted, with a decision expected mid Q2 2020. Draft mining contract matches feasibility costs (final expected H1 2020); plant construction tender issued at 600ktpa, to complete late Q2.
Consultant CSA Global's new geological model interprets the Bushveld Complex as the source of gold in the Eastern Transvaal fields. It will be used to prioritise exploration targets across the 620 km2 tenements. Core samples and regional data are being reprocessed; no new resource figures.
December quarter report: ball mill removed from Rustenburg, 600ktpa plant design done, draft mining contract prepared and power line design started. MR83 open-pit environmental submission due February 2020, with a decision expected mid Q2 2020. Cash figures not visible in extract.
February 2020 investor presentation in Cape Town describing a high-grade surface gold field in South Africa. Visible text is disclaimers only; no new information.
Independent study lifts planned plant throughput 20% to 600ktpa, using the 2.5MW ball mill bought in October 2019. Capital cost is US$24.98m, about 0.6% above the feasibility's US$24.84m. Mill is removed and due at site in February; EPC tender documents are ready.
2,000,000 unlisted options (1m at $0.25, 1m at $0.30) lapsed on 18 January 2020. Shares on issue stay at 437,006,585; unlisted options and performance rights fall to 26.2m. Housekeeping only.
427,970 unlisted options exercisable at $0.19 lapsed on 15 January 2020. Shares on issue are now 437,006,585; unlisted options and performance rights fall to 28.2m. Housekeeping only.
All seven resolutions passed at the 2019 AGM, including the remuneration report, election of Finn Behnken and Brett Tang, and re-election of Richie Yang. Routine meeting outcome.
November 2019 investor presentation on the 6Moz resource and low-capex open-pit start-up, with about 200koz of gold over five years. It repeats known feasibility results; no new figures in visible text.
Shares began trading on the US OTCQB market from 7 November 2019 (code TGMGF), with B.Riley FBR as market maker and Porter, LeVay & Rose as US investor relations. No new shares issued; ASX remains the primary listing.
67,070,707 shares leave voluntary escrow on 24 November 2019. 99.98m shares remain escrowed: 46.65m to 31 December 2019 and 53.33m to 31 December 2020. Administrative notice.