19 Dec 2017capital raising announcement▲ GoodMajor
Second tranche of the placement completed: 20.1M shares at $0.11 for $2.2M gross, after shareholder approval on 8 December. This completes the A$6.5M raise to fund the Malingunde PFS and DFS. Includes a routine 708A notice for 1,747,345 shares.
What it means for a shareholder
20.1m new shares at $0.110 to raise about $2.2m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
PFS progress update: 210 aircore holes (6,212m) completed, first assays expected early in the new year. Orelogy appointed for mining, ALS for scrubbing metallurgy, SLR for infrastructure, AECOM for social work; project engineer to be chosen by year end.
4 Dec 2017asset acquisition disposition▲ GoodMajor
Granted 229km2 of extra ground on EPL0372 along strike south-east of Malingunde, extending the Malingunde Trend by ~25km. After relinquishing non-prospective areas, the total ground package is now 2,740km2, down from ~3,788km2. Company says it holds ~80% of prospective area.
The 5,000m infill aircore program at Malingunde for the PFS mine plan is finished. One rig has moved to three other saprolite targets, including Thete and Chiziro, about 40km away. Assays are expected in Q1 2018. A second rig has started groundwater drilling.
November 2017 Perth conference presentation repeating Malingunde's resource, scoping study economics (US$29M capex, US$301/t opex) and the Vale/Mitsui transport MoU. No new results in the excerpt.
Pre-feasibility study for Malingunde has started, targeted for completion by mid-2018. Company says it is fully funded for PFS and DFS after the A$6.5M raise. A ~6,000m infill and regional drilling program starts shortly. Follows the June scoping study.
First tranche of the placement completed: 39.0M shares at A$0.11 raising A$4.3M. The second tranche of 20.1M shares (A$2.2M, including 2M for the Chairman) awaits shareholder approval. Completes the first part of the raising announced on 25 October.
What it means for a shareholder
39.0m new shares at A$0.110 to raise about A$4.3m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
25 Oct 2017capital raising announcement● NeutralMajor
Raising A$6.5M through a placement of 59.1M shares at A$0.11, a 15% discount, to fund Malingunde pre-feasibility and definitive feasibility studies. Tranche 1 is A$4.3M; tranche 2 (A$2.2M) needs shareholder approval. Also 12M advisor options at $0.18. Total dilution 15.2% for tranche 1 capacity.
What it means for a shareholder
59.1m new shares at A$0.110 to raise about A$6.5m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Non-binding MoU with Central East African Railways (Vale and Mitsui-linked) for rail and Nacala port services for up to 100,000tpa over up to 20 years. Backs the scoping study's ~US$65/t logistics cost. A binding agreement is targeted before 30 June 2018.
2017 annual report for the year to 30 June 2017. Restates the Malingunde saprolite resource (28.8Mt at 7.1% TGC) and the scoping study (44,000t a year, US$29M capex, US$301/t opex). Excerpt shows no new results; financial statements not visible in the text.
Appendix 4G governance checklist for the year to 30 June 2017, lodged with the annual report. Points to the corporate governance statement on the company website. No financial or project information.
Malawi Government, including the Minister of Mining, has offered support and resources to progress Malingunde to development after Sovereign presented the June scoping study. Release also notes the Nacala Logistics Corridor opened in August 2017. Supportive, but no permit or approval is announced.
New flotation test F23 with longer attritioning gave concentrates of about 98% carbon across all size fractions (98.2% overall by double loss-on-ignition). Finer flake than test F13, suited to battery markets. Lab-scale result supporting the dual-market strategy.
First spheroidisation tests on Malingunde concentrate produced spherical graphite meeting most Li-ion anode benchmarks, e.g. purity above 99.95%, though yield of 21-51% and some size-distribution results were outside or near the benchmark. Company plans more battery testing; traditional markets remain the primary focus.
Malingunde scoping study (±35% accuracy): about 44,000t a year of concentrate over a 17-year mine life, US$29M capex including 35% contingency, and US$301/t operating cost FOB Nacala. Payback under 2 years. Additional funding will likely be needed. Delivers the study flagged since 2016.
May 2017 London investor presentation repeating the maiden resource and metallurgy results. Shows 217.3M shares, A$21.7M market cap and about A$2.8M cash at 31 March 2017, down from ~A$3.7M at 31 December. Scoping study described as due shortly.
Maiden JORC resource for Malingunde: 28.8Mt at 7.1% TGC saprolite, including 8.9Mt at 9.9% TGC high-grade. Total 65.1Mt at 7.1% incl. saprock and fresh rock; 80% Indicated. Company calls it the largest reported saprolite graphite resource; the high-grade part will be the scoping study focus.
German laboratory tests on Malingunde concentrates gave expansion ratios of 480 ml/g for +300µm flake and 450 ml/g for +500µm flake. Company says this supports targeting traditional markets first. This is the German downstream work flagged for Q2 2017.
April 2017 Hong Kong conference presentation repeating Malingunde's low-cost saprolite case and the F18 flotation result (98.6%). Shows 217.3M shares, A$17.4M market cap and about A$3.7M cash at 31 December 2016. Resource and scoping study described as due shortly.
Latest Malingunde flotation test produced concentrate averaging 98.6% graphite, up from 95.3% on the same sample, with 71% above 149µm including 9% super-jumbo. Company compares it to Magnis's Nachu product. Lab-scale result feeding the scoping study.
Final aircore and diamond assays (93 aircore, 5 diamond holes) at Malingunde include 34m at 12.0% TGC. All 2016 drilling results are now reported. CSA Global has begun the maiden JORC resource, due within weeks; scoping study due late April 2017.
Interim financial report for the half year to 31 December 2016. The excerpt shown covers the directors' report, repeating Malingunde drilling and metallurgy results; financial figures are not in the text shown. Resource still targeted Q1 2017.
Flotation tests on Malingunde diamond core gave concentrates with 78% above 149µm, including 14% super-jumbo (+500µm) flake. Concentrate grade was 96.6% C(t). Company says larger flake could lift the price; no optimisation done yet and the work feeds the scoping study.
Second batch of aircore assays (65 holes) at Malingunde confirms consistent mineralisation and 20-30m thickness, e.g. 32m at 9.2% TGC and 24m at 11.9% TGC. Results are in for 87 of 180 holes; resource still on track for March.
February 2017 presentation at a Cape Town mining investment conference, repeating known Malingunde drilling and metallurgy results. Reiterates the maiden JORC resource for March and scoping study in H1 2017. No new results.
First assays from the 5,517m, 180-hole aircore program at Malingunde (22 holes) include 30m at 15.3% TGC and 31m at 10.8% TGC. Company calls them the thickest high-grade zones yet. Maiden JORC resource now targeted for March, scoping study early Q2 2017.
Final bench-scale flotation results on Malingunde saprolite improved concentrate grade from 97.3% to 98.2% C(t), with about 55% of concentrate in +149µm flake (up from ~49%). Eight tests were consistent. Builds on the September 2016 first test; still early lab work on a hand auger sample.
November 2016 presentation repeating known Malingunde results. Shows 217.3M shares, market capitalisation A$27.1M and cash of about A$4.3M at 31 October 2016. Aircore drilling is underway; resource and scoping study planned for 2017.
First Malingunde diamond assays confirm thick, high-grade saprolite: 15m at 19.7% TGC within 25m at 15.1%. Grades continue to 20-30m depth, matching the hand auger results. Aircore drilling of ~5,000m starts this week; first resource targeted Q1 2017.