Each one in plain English, with the numbers worked through for a shareholder.
10 July 2019investor presentation● Neutral
Presentation pitching Malawi as a potential new rutile province, covering the rutile market, the 125-hole re-assay and the 96% TiO2 metallurgy. It repeats previously released results, so there is nothing new.
First rutile metallurgy produced a 96.0% TiO2 product at a recovered grade of 1.16%, from a 180kg sample at Wofiira. The company says it compares well with Sierra Rutile's product and suggests a possible rutile province across its >4,000km2 ground. Follows the January rutile assays.
Half-year report to 31 December 2018 mainly recaps the PFS, DFS start, rutile re-assay results and the A$5.3M raising. Director placement shares are to go to a general meeting on 20 March 2019. Financial figures are not visible in the excerpt.
Share purchase plan completed: 15.37M shares at A$0.065 raised A$1M, 2.2 times oversubscribed with applications scaled back about 55%. Total raised with the placement is A$5.3M. Resolves the SPP thread.
What it means for a shareholder
15.4m new shares at A$0.065 to raise about A$1.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
First tranche of the A$4.3M placement completed: 59.7M shares at A$0.065 raised A$3.9M. A second tranche of 7.0M shares (A$0.5M) to directors needs shareholder approval. Continues the February raising.
What it means for a shareholder
59.7m new shares at A$0.065 to raise about A$3.9m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Share purchase plan offer letter: eligible holders can apply for up to A$14,950 of shares at A$0.065, an 18% discount to the last close, aiming to raise up to A$1M. Offer closes 20 February 2019 and is not underwritten. Continues the February placement.
Administrative notice that the company will offer shares under the share purchase plan without a prospectus, as required by ASIC rules. No new commercial information.
February 2019 Cape Town presentation repeating PFS figures (US$323/t opex, US$49M capex, US$201M NPV) and rutile results. Notes next steps: DFS, pilot plant, permitting and project finance. No new information.
1 Feb 2019capital raising announcement● NeutralMajor
Placement of 66.7M shares at A$0.065 raises A$4.3M, with up to A$1M more via a share purchase plan. Price is an 11% discount to 30-day VWAP. Funds go to the DFS and rutile work. Dilution is 17.7%, and the price is well below the 2017 placement at $0.11.
What it means for a shareholder
66.7m new shares at A$0.065 to raise about A$4.3m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Re-assay of 125 old hand-auger holes shows widespread near-surface rutile potential: 26 holes average 2.34% TiO2 and 96 holes 1.89%. Includes a ~7km by 1.5km zone at Malingunde. Builds on the 2018 rutile find; more testwork needed before any resource.
September 2018 roadshow deck on Malingunde, titled 'PFS imminent'. Repeats the known June resource and saprolite cost story; the excerpt shows no new results, so it adds nothing new for shareholders.
Appendix 4G and corporate governance statement for the year to 30 June 2018, lodged with the annual report. Administrative filing with no new operational or financial information.
Annual report for year to 30 June 2018, focused on Malingunde: June resource upgrade (45.7Mt at 7.2% TGC), flowsheet and purity results, PFS completion expected in coming weeks. Carpentaria JV continues, with Mount Isa Mines funding. Financial figures are not visible in the excerpt.
Bulk auger drilling began at Malingunde to extract ~100 tonnes of ore for a pilot plant. About 40 tonnes will go to SGS Lakefield to make ~3.5 tonnes of concentrate for potential offtake partners. Company says offtaker demand drove this; PFS results due in coming weeks.
Company reports rutile and leucoxene (titanium minerals) within the Malingunde graphite deposit, e.g. 25m at 1.45% TiO2 from surface. Early tests made 78-90% TiO2 concentrates from graphite tailings. Potential co-product revenue; proof-of-concept only, with graphite remaining the focus.
Test work produced 99.9995% purity graphite from Malingunde flake using a lower-temperature thermal process, with impurities under 5 ppm. Company calls it a step toward battery and other high-value markets. Spherical graphite results promised in coming weeks. Lab-scale only.
Updated Malingunde resource: 45.7Mt at 7.2% TGC (saprolite plus saprock), 81% Measured and Indicated, including a high-grade 14.5Mt at 9.7%. Up from the 2017 saprolite 28.8Mt; the high-grade tonnage rise comes mainly from adding saprock. It becomes the PFS focus.
Testwork validates a scrubber-based flowsheet at Malingunde, with ~89% weighted recovery and 96-98% TGC concentrates. A small pebble crusher could let harder saprock be added as plant feed beyond the 2017 scoping study. PFS now targeted for July; resource due early June.
Final 71 of 209 aircore holes at Malingunde confirm wide, high-grade graphite, e.g. 21m at 21.7% TGC and 26m at 17.2% TGC. One zone flattens and stays open to the west, a possible tonnage addition. Updated resource still due late Q2 2018.
Drilling found a new zone of high-grade saprolite graphite at Msinja, 1.5km south-east of Malingunde, over ~1km of strike and open to the south-east, e.g. 15m at 15.1% TGC. Also a new 1,896km2 licence EPL0492 was granted, lifting holdings to 3,993km2.
Half-year accounts to 31 December 2017. Directors' report restates the PFS start, drilling, the transport MoU and the A$6.5M placement. Financial figures are not visible in the excerpt.
Second batch of 68 infill holes shows wide, high-grade graphite, e.g. 18m at 19.3% TGC and 16m at 14.7% TGC, with up to ~200m surface width. 106 holes still pending; updated resource expected Q2 2018. Continues January's strong results.
PFS update: DRA Global chosen as project engineer, pit optimisations done, and scrubber and variability testwork under way. PFS stays on track for mid-2018. Sales trip found the highest value is in large and jumbo flake for industrial uses; battery qualification continues.
February 2018 company presentation repeating Malingunde's known resource (28.8Mt at 7.1% TGC), scoping study economics (US$29M capex, US$301/t opex) and transport MoU. Says resource update expected Q2 2018. No new information in the excerpt.
First 36 of 210 infill aircore holes at Malingunde returned high grades, e.g. 23m at 21.2% TGC and 36m at 11.1% TGC. Results feed an updated resource due early Q2 2018. Also raises the Managing Director's salary to $215,000 from 1 Jan 2018.