21 Oct 2026drilling spud▲ GoodMajor
Drilling began at Kramer Hills, California: up to 22 diamond holes for 2,700m around a former open pit. Historic 1980s holes include 21.3m @ 7.9 g/t Au. Results will show whether a JORC resource can be established.
Bowdens DFS lifts Ore Reserves to 47.9Mt at 60.8 g/t Ag for 93.5Moz (up from 71.7Moz). Stage 1 is 29.9Mt for 65.4Moz over 16 years; initial capex rises to A$455M from A$331M; pre-tax NPV5% A$1.04bn at US$45/oz. Consent is still needed.
Calico North mapping returned rock-chip silver up to 1,960 g/t, with about 20% of 219 samples above 50 g/t Ag, and barite up to 44.8% Ba. Kramer Hills mapping and magnetics confirmed the target; drilling at Kramer is planned around mid-year. Surface sampling only, not drilling.
Tuena (EL9588) drilling of seven diamond holes for 1,705 m returned low-grade gold-base metal intercepts, e.g. 24.2m @ 0.25g/t Au at Elsienora and 11m @ 0.65g/t Au at Barite. The company says results warrant follow-up. This completes the Elsienora drilling begun March 2025.
Geo-metallurgical drilling at Bowdens returned the best intercept since the 1989 discovery: BD25007 hit 116m @ 245g/t Ag from 75m (28,378 gram metres), beating the 2003 hole (20,848). Results are from the ~2,000 m program started March 2025.
A ~2,000 m diamond program has started at Bowdens, mainly to collect samples for pilot-plant concentrate for offtake talks and tailings work. It also tests about 500 m of strike roughly 50 m below the reserve pit, which could extend the 71.7 Moz reserve if it succeeds.
Diamond drilling has started at Elsienora, next to Tuena, as flagged in January. About 1,700 m is planned across the Picker, Barite and Elsienora prospects, testing McPhillamys-style gold. Only historic results are quoted, e.g. 21 m @ 0.89 g/t Au.
Drilling is set to start at the Elsienora Project (EL9588, acquired in 2023, next to Tuena), with 2,000-3,000 m of diamond drilling planned. Targets include the Picker Prospect, a McPhillamys-style gold target. Historic results only, e.g. 29 m @ 1.53 g/t Au.
Bowdens Ore Reserve rose to 32.8 Mt at 68 g/t Ag for 71.7 Moz silver (up 7.5% on 2018; earlier 66 Moz figure superseded). Resource M&I silver slightly lower at 164 Moz, though grade higher at 35.7 g/t. Reserve uses a smaller mine footprint.
First-ever drilling at Bara Creek, a high-sulphidation epithermal target about 7 km from Bowdens, starts 14 October: eight diamond holes for 2,600 m, all approvals in place. A greenfield exploration test following the seismic work.
Infill drilling at Bowdens returned thicker, higher-grade intercepts, e.g. 70 m @ 68 g/t AgEq and 71 m @ 47 g/t AgEq. High-grade zones extend up to 80 m down and 130 m sideways from the planned pit base. Resource and reserve updates are now due Q3 2024.
First blast-hole bulk sampling at Bowdens (21 tonnes from three sites) for optimisation and ore-sorting work. High-grade zone averaged 171 g/t AgEq, 43% above the 120 g/t block model grade. Company says this suggests possible resource conservatism, though full reconciliation is not possible.
New Bowdens drilling, e.g. BD23028 22 m @ 185 g/t AgEq in the Southern Gold Zone, extends the deposit to over 1,100 m. The new intersections will feed an updated resource due early 2024. Extends earlier extension results.
Bowdens drilling shows mineralisation extending west, south and north, e.g. BD23013 162 m @ 44 g/t AgEq and BD23014 2 m @ 565 g/t. A 96 km regional seismic survey is complete, with interpretation due November 2023. Barabolar drilling shows a preserved hydrothermal system, not an economic discovery.
Hole BD22055 hit the highest-grade silver yet in the Aegean Zone: 6 m @ 1,251 g/t silver, including one metre at 6,264 g/t. It lies at the northern edge of the new resource, suggesting further extension. More assays are pending.
Bowdens open-pit resource upgraded to 200 Mt @ 62 g/t silver equivalent for 396 Moz, up 44% in ounces on the 2017 estimate (275 Moz). It includes 190,000 oz gold, a first for the open-pit resource. It will feed reserve conversion and optimisation of the feasibility study.
Southern Gold Zone grows to over 450 m strike and about 250 m width, still outside the planned pit. BD22046 returned 384 m @ 62 g/t silver equivalent and BD22044 167 m @ 73 g/t. An update of the open-pit resource has begun. Extends the January result.
Southern Gold Zone grows to 300 m strike, 200 m width and 15-85 m thickness, outside the planned pit. BD22042 hit 99 m @ 1.15 g/t gold equivalent; re-assays of old holes also show gold. Builds on the September BD22029 result.
Hole BD22029 returned Bowdens' best gold intercept yet: 131 m @ 0.49 g/t gold (0.92 g/t gold equivalent), including 32.6 m @ 1.37 g/t gold. It defines a new Southern Gold Zone at the south of the planned open pit. A 15,000 m drill program continues.
Maiden underground Mineral Resource at Bowdens of 42.9 Moz silver equivalent (6.37 Mt at 209 g/t AgEq), 56% Measured and Indicated. It sits beneath the 275 Moz open-pit resource, taking Bowdens to over 315 Moz. This delivers the underground resource due since March; Scoping Study next.
A 12.44 km seismic survey clearly defines the Bowdens deposit and shows possible extensions at depth. It also generates new drill targets at Prices Gully, about 900 m east, plus a caldera ring fault. A 3,000 m drilling program is planned to test them.
All underground-resource drilling assays are in. BD22003 gave the deepest high-grade silver at Bowdens, 1 m @ 1,769 g/t AgEq from 414 m. Bundarra Zone now spans 550 m strike. H&S Consultants began the maiden underground resource estimate, due this quarter.
Diamond drilling restarts at Barabolar, 10 km northwest of Bowdens, targeting possible porphyry copper-gold at Mt Laut and Crossroad. An initial 2,000 m program is due by end September quarter. Work had been deferred since the start of COVID-19.
Bowdens drilling found visible gold for the first time, with BD21044 returning 116 m @ 0.31 g/t gold and BD21048 1.8 m @ 1,181 g/t AgEq. Bundarra Zone now spans 500 m north-south. Maiden underground resource now due in the June quarter 2022, later than the earlier March target.
Bundarra Zone extended about 75 m south: BD21042 2.4 m @ 1,520 g/t AgEq, including 1 m @ 2,282 g/t, with significant copper found at Bowdens for the first time. Drilling continues into the first half of 2022 toward a maiden underground resource.
Drilling shifts to the Bundarra Zone: BD21035 14.2 m @ 374 g/t AgEq, including 4.6 m @ 694 g/t, its best intercept there. A new quartz-sulphide vein style was also found. Zone now 200 m long and 150 m wide. Extends the underground story.
New Bowdens results from the 30,000 m program: BD21025 14.0 m @ 264 g/t AgEq and BD21003A 3.0 m @ 679 g/t AgEq confirm Northwest and Aegean continuity, which extend over 450 m east-west. Follow-up on known zones feeding the underground resource.
BD21014 returned 4.0 m @ 980 g/t silver including 2.0 m @ 1,825 g/t, extending the Aegean Zone to 170 m strike. BD21013 widens the Northwest zone 40 m east to 270 m. Continues the high-grade underground story.
New Bowdens results from the 30,000 m program: BD21006 2.0 m @ 443 g/t AgEq and 8.3 m @ 354 g/t, BD21011 13.0 m @ 264 g/t. Northwest zone widened to 230 m; BD21007 extends Bundarra Zone about 200 m southeast. Incremental follow-up on known zones.
Drilling at Bowdens is expanded to a 30,000 m program with four rigs, running to at least end 2021. Prompted by a newly identified 'Northern Feeder Vein' (120 m strike, 260 m depth, grades consistently over 1,000 g/t silver), a strategy shift toward high-grade and underground targets.