Each one in plain English, with the numbers worked through for a shareholder.
15 Mar 2019half year report● Neutral
Half-year report to 31 December 2018 restates activity: Bowdens EIS advancing, Barabolar exploration started, and the A$3.85M entitlement issue completed. Directors unchanged. Financial statements are not visible in the text provided.
ASX queried a rise from A$0.04 to A$0.053 on heavy volume. Silver Mines said it knew of no undisclosed information, citing a 7.46% silver price rise and the Barabolar drilling. It said bulk assays are expected in the March quarter 2019.
Trading suspended under Listing Rule 17.3 pending a response to ASX's price and volume query. Procedural step following the trading pause earlier that day.
Updated earn-in with Thomson Resources lets Silver Mines earn up to 80% of EL7391 by sole-funding A$380,000 over three years, of which A$80,000 is spent. Thomson is free carried to a feasibility study. Replaces the December 2015 agreement; renewal pending.
AGM presentation repeating known facts: Bowdens resource 163 Moz silver, reserve 66 Moz, feasibility complete, Barabolar drilling underway. Shows 633.1M shares, A$0.04 share price, and A$2.3M cash at end September 2018. No new results.
Eight shallow RC holes (1,615 m) finished at southern Barabolar; assays pending. Visual sulphides seen, e.g. 40 m of silicified volcanic with pyrite and minor copper in BAR18005. BAR18003 stopped short at 133 m; rig switching to diamond coring. No assay results yet.
ASX queried a rise from A$0.036 to A$0.046 on heavy volume. Silver Mines said it knew of no undisclosed information, pointing to the Barabolar drilling plan and a high gold/silver ratio, which it says tends to precede higher silver prices.
Drilling at Barabolar was scheduled to start the following week, a few weeks later than the September plan, with up to 7,500 m of RC and diamond drilling. The southern prospects (Bara Mine, Bara North, Cupola South) were approved first, northern approvals were expected shortly, and first results were due in early November.
Appendix 4G filed with the 2018 annual report, pointing to the corporate governance statement on pages 57-65 of the report. Administrative compliance form with no new information on projects, funding or results.
2018 annual report covering the year to June: feasibility study completed, EIS progressed, Barabolar discovered 10 km northwest of Bowdens. Project area is 2,007 km2, with 80% being earned in EL7391 from Thomson Resources. Financial statements are not visible in the text provided.
Surface sampling at the Cringle prospect, Barabolar, found gold-bearing structures over more than 400 m of inferred strike. Rock assays reached 5.9 g/t gold with 95.2 g/t silver. These are surface rock chips, not drilling; Cringle will be drilled in the September program.
The rights issue closed fully subscribed, raising A$3.85M at A$0.03 for 128.2M new shares and 64.1M options. Shareholders took up A$2.6M and Patersons placed the A$1.25M shortfall. Directors subscribed A$386k; A$237.5k of that needs shareholder approval. Funds go mainly to Barabolar drilling.
What it means for a shareholder
128m new shares at about A$0.030 to raise about A$3.9m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Barabolar drilling plan set at 30 holes for about 7,500 m, reverse circulation and diamond, averaging 250 m deep (maximum 450 m), across nine targets. Starts in September, subject to approvals. It confirms the plan previously flagged; no results yet.
Barabolar technical presentation repeating the IP targets, soil anomalies (9,000 x 2,000 m) and skarn (5,000 x 800 m) already released. Drilling is planned for September, subject to approvals. No new results.
Induced polarisation survey results at Barabolar define five priority drill targets, including three copper-gold porphyry targets (Kia Ora, Kia Ora West, Cupola). Drilling is planned for September 2018. It builds on the July survey news; these are geophysical targets, not drill results.
Announces that the rights issue prospectus is being despatched to shareholders on 15 August. Restates the terms and timetable (closing 31 August, issue 6 September). Administrative, no new information.
Notice to overseas shareholders that they cannot take part in the rights issue. Patersons will sell their entitlements, and they may receive nothing if sale costs exceed proceeds. Administrative letter with no new information.
Notice to optionholders that to join the rights issue they must exercise options before the 10 August record date. The $0.30 options are well out of the money against a $0.034 share price, so exercise is unlikely. Administrative.
Letter to eligible shareholders restating the rights issue terms and use of funds: A$2.35M exploration, A$0.5M EIS and feasibility works, A$0.64M corporate, A$0.36M offer costs. No new information. The letter's one-for-three wording conflicts with the one-for-four in the prospectus.
3 Aug 2018capital raising announcement● NeutralMajor
One-for-four renounceable rights issue at A$0.03 to raise up to A$3.85M, with a free option per two shares ($0.06, three years). It is partly underwritten (A$2.5M) by Patersons, and funds Barabolar drilling and the EIS. Dilution is up to about 20%.
Full prospectus for the one-for-four rights issue at A$0.03, raising up to A$3,846,006, with a free option per two shares ($0.06, 3 years). Patersons underwrites A$2.5M. Closes 31 August, issue 6 September. Repeats the 3 August announcement; the cleansing detail is new.
Induced polarisation survey at Barabolar, 10 km northwest of Bowdens, found at least 10 targets, with sulphide zones over 4,000 m of strike interpreted as possible porphyry copper-gold sources. Skarn now mapped over 5,000 x 800 m. A drilling program of up to 7,500 m is planned for September.
June 2018 corporate presentation repeats known facts: the completed feasibility study, 66 Moz reserve, 275 Moz resource and exploration targets. Shows 512.8m shares, A$0.044 share price, about A$22M market cap and A$2.0M March cash. No new results.
First northwest hole BRD18001 hit 24 m at 150 g/t silver equivalent (108 g/t silver) from 283 m, including 1 m at 510 g/t. It extends the high-grade zone about 100 m west; it remains open and could suit underground mining tonnages.
Feasibility study complete for a 2 Mtpa open pit at Bowdens: 16-year life, 52.9 Moz silver, initial capex A$246M, post-tax NPV5 A$70.6M (IRR 17.9%), payback 4.8 years. Board approved finishing the EIS; funding for the A$246M build is not addressed in the text shown.
Maiden Ore Reserve for Bowdens of 29.9 Mt at 69.0 g/t silver, containing 66.32 Moz silver, 95.7% in the Proved category. It converts part of the 163 Moz silver resource and supports a 16-year mine life in the coming feasibility study.
The 10,705,000 quoted SVLOA options at $0.30 expire on 20 June 2018 and are out of the money against a $0.045 share price. ASX granted a waiver, so no expiry letters will be sent. Expected to lapse.
A new program of up to 2,500 m began at Bowdens: four northwest holes (500-620 m deep) targeting high-grade silver extensions, plus a 500 m southwest zinc hole. It follows up the porphyry-source theory; first assays are expected in June.