Prospectus for a 1-for-10 non-renounceable offer of up to 13.6M options at 1c, raising up to $136,106. Options exercise at 35c and expire 31 October 2012. A very small raising, not underwritten per the shareholder letter.
Letter to optionholders explains the 1c options offer (35c exercise, expiry 31 October 2012). Existing options carry no entitlement; holders must exercise before the 14 September record date. Proceeds fund Webbs drilling and working capital. Repeats the prospectus terms.
Further Webbs RC results, best RC256 21 m at 212 g/t Ag. 145 holes (10,931 m) are now drilled and RC drilling is halted awaiting a compact rig. Diamond drilling has started, with two holes completed.
More Webbs RC results: over 110 holes (about 8,000 m) drilled, best RC204 1 m at 2,129 g/t Ag and RC214 15 m at 258 g/t. Company says results support extending the resource and upgrading its JORC classification. Some Webbs North holes were narrow or low grade.
June quarter report restates the first Webbs RC results (RC127 3 m at 1,530 g/t Ag), diamond results and scoping study. 44 RC holes (about 3,100 m) are done. Cash was A$3.3m after option exercise. No new drilling results.
Rock chips and IP surveys at Mole River (EL6771, EL6114) found silver up to 2,950 g/t and zinc to 28.9%. The company sees Webbs-style targets about 30 km north-east of Webbs. These are surface samples only, with no drilling yet.
First nine RC holes of the new Webbs program include RC135 11 m at 414 g/t Ag and RC127 3 m at 1,530 g/t. The company says these support extending the resource. 44 holes (about 3,100 m) are done. Drilling then moves to Mole River.
Final five diamond holes at Webbs include DDH013 7.8 m at 485 g/t Ag and DDH012 12.2 m at 194 g/t, though DDH015 was poor against a nearby RC hole. The CEO says none of the 11 holes is in the resource. A 12,000 m RC program is due shortly.
March quarter report restates the 4-7 Mt exploration target, diamond results and the scoping study. A 15,000 m RC program is expected in May, and metallurgical testwork starts on the core. It says more resource is needed to extend mine life. No new results.
Lycopodium-assisted scoping study on Webbs, open pit, is positive but short-lived. Base case at A$31/oz silver: 432,000 t at 344 g/t, 15-month life, A$49m pre-tax, pre-capital surplus. A$40/oz case: 20 months, A$85m. Plant capex about A$66m. Mostly Inferred resource, so conceptual.
Amended option expiry notice: because of Easter holidays, quotation of the 1 May 2011 options ceases 19 April, not 21 April. The 12c exercise price and expiry date are unchanged.
Company Secretary letter reminds holders that the 12c options expire 1 May 2011, unless exercised, and urges exercise. The last price was 32.5c. Exercise would bring in cash, but no underwriting exists and no amount is stated. It restates known resource and drilling facts.
Amendment to the same-day diamond results release: silver grades are restated in g/t instead of ppm, for consistency with earlier announcements. The two units are equivalent, so no results changed.
Six of 11 new diamond holes at Webbs, best DDH011 3.95 m at 916 g/t Ag, say the company, support the resource. One twin hole (DDH005) returned far lower grade than its RC hole. Deep holes confirm the lode below 250 m. A 12,000 m RC program is expected in April.
Silver Mines defines a Webbs exploration target of 4.0-7.0 million tonnes at 200-260 g/t silver, potentially 26-57 Moz, including the existing 1.23 Mt resource. It is conceptual only, not a resource. An 8,500 m RC drilling program is due late March.
December quarter report: the 1.23 Mt resource is restated, 12 RC holes (1,381 m) and 6 diamond holes (781 m) were completed, and Lycopodium was retained for a scoping study due end of February 2011. A new Torny IP survey found a 500 m chargeable zone.
Securities trading policy lodged with ASX, but the text names Hill End Gold Limited rather than Silver Mines, apparently a wrong-company template. It is an administrative document with no results or financial information.
Corrected securities trading policy re-lodged the same day, now naming Silver Mines Limited instead of Hill End Gold. Administrative only; it sets out insider trading rules and blackout periods.
RC drilling at Webbs Main shows extensions to the new resource, including 8 m at 358 g/t Ag and 4 m at 581 g/t Ag (preliminary XRF). Diamond drilling continues into 2011, with RC drilling resuming in February after wet weather stopped some planned holes.
AGM presentation repeats the 10 Moz resource (1.23 Mt at 256 g/t) and says Webbs is moving to scoping and pre-feasibility studies. It flags a likely resource upgrade in the June quarter 2011. Mostly known facts.
2010 annual report: the chairman says about $8.0m has been raised since 2006 and about $5.2m spent on exploration, resulting in the 10 Moz Webbs resource. The next 12 months aim to grow the resource to a level needed to start a mining feasibility study.
September quarter report: Webbs and Walla Walla drilling completed, and the options rights issue completed. The $1.8m placement was at 9 cents for 20m shares; option sales raised roughly $150,000. Diamond drilling starts in November, with scoping work planned.
Updated Webbs resource is 1.23 million tonnes at 256 g/t silver for 10.19 million ounces, more than double the 4.6 Moz estimate of 2008. Part (167,000 t at 360 g/t) is now Indicated. This resolves the long-overdue resource upgrade. Drilling and scoping studies follow.
Statutory accounts for the year to 30 June 2010: 5,144 m drilled at Webbs, with an updated resource model under way and a significant upgrade expected. Almost $3 million of new finance was secured in the year. Directors' changes match earlier notices; Charles Straw is Managing Director.
Administrative amendment to the 2 September presentation: adds the competent person's consent statement and notes the resource table is an Inferred Resource based on August 2008 modelling. No new results.
Mining NSW 2010 presentation by the exploration manager restates Webbs: about 13,000 m drilled, a 2,500 m corridor, best hits and the 2008 inferred resource of 720,000 t at 200 g/t Ag. It says an updated resource is expected soon and 4,000 m more drilling is planned by year end.
Nineteen holes (about 1,520 m) at Webbs Main show near-surface mineralisation over at least 180 m of strike and 120 m depth, best 12 m at 285 g/t Ag. Costeans returned 11 m at 231 g/t at surface. A resource estimate is expected within weeks.
New drilling at Webbs Main, next to the old mine, returned high-grade near-surface silver on preliminary XRF: 24 m at 316 g/t (RC098) and 11 m at 635 g/t (RC100). Webbs Main was not in the earlier resource estimate; an update is expected soon.
Charles Straw, already CEO, is appointed a director. Director David Straw has retired and passed away that afternoon; the board thanks him for his contribution since the company's founding and listing.
June quarter: a 3,500 m RC program was completed, extending Webbs South about 100 m south. Placements raised $457,000 in the quarter plus $1.8m in July (20m shares and 10m options). The resource update is now expected early to mid August.