23 July 2020director officer appointment▲ GoodMajor
Shareholders approved all resolutions on 22 July and the Pascalle and Gnama acquisition completed, with acquisition securities issued. Tom Langley joins the board; Simon Robertson resigns as director and secretary, replaced by Ian Hobson. Maiden Pascalle drilling is expected in the second half of 2020.
Due diligence found historic gravity and airborne electromagnetic data over Pascalle, giving new targets where magnetic and gravity highs coincide, and more confidence in the Havieron-like Pascalle target. Desktop work only; no drilling yet.
June 2020 presentation pitching gold, nickel and vanadium assets, with cash of about A$3m and 435,188,434 shares, plus 55.6m shares and 7m options subject to the deal completing. Largely repeats the 3 June announcement.
3 June 2020asset acquisition disposition● NeutralMajor
Binding deal to buy Vanatech, holding the Pascalle Gold (Paterson) and Gnama Nickel (Fraser Range) projects in WA, paid largely in shares with a performance component, plus a A$790,000 placement. A move beyond the Swedish vanadium assets; the trading pause on 1 June preceded it (inference).
Cost cuts citing COVID-19 uncertainty: cash A$2.31m at 31 March 2020, CEO salary cut 50% and general manager 80%, directors' fees suspended. Non-executive director Ian Burvill resigned, leaving the statutory minimum three directors. Review planned for July.
Interim report for six months to 31 December 2019. Reviews the half's drilling and the maiden resource already announced. Financial figures are not in the text provided.
The Swedish Mining Inspectorate approved the Work Programmes for the ten-hole Tomelilla drilling, resolving the access question left open at the quarter. Landowners may still appeal to the Växjö court, so the right to drill is not yet secure.
Swedish government grant of 500,000 SEK (~A$80,000) via Vinnova/STRIM funds 75% of a metallurgical study with RISE, Processum and Clay Technology. It continues the earlier RISE work and tests pressure oxidation leaching to recover vanadium. Small in dollar terms.
Maiden JORC resource at Hörby: 116.9Mt @ 0.39% V2O5, of which 61.8Mt is Indicated and the rest Inferred, with 1,005 million pounds contained V2O5. This is the first resource at Skåne, and it appears to exceed the 50Mt @ 0.5% inferred-resource milestone in tonnes though at lower grade (inference).
Second batch of Hörby assays from three more holes: combined seams of 10.5-12.3m @ 0.39-0.40% V2O5, with dip of 5-8° east and no significant faulting. Results are consistent with the first batch and all five mineralised holes have now reported.
First Hörby assays: hole HDD001b shows two seams totalling 12.3m @ 0.40% V2O5 from 35.7m depth. That is well below the historic Fågeltofta-2 (9.7m @ 0.61%) about 40km away, though it confirms regional continuity. Remaining results due in coming weeks.
Maiden Hörby campaign finished: 602m across six holes, 92% core recovery, Dictyonema Formation hit in five. The programme was expanded, and dip was found shallower (5-7°) with less fault throw than assumed. Assays are expected in coming weeks.
The committee approved the 10-hole Tomelilla notification after the courts upheld the earlier appeal, resolving the June rejection. Further appeals are possible and the Mining Inspectorate must still approve access. Hörby drilling: 412m done, 70% of holes complete.
Appendix 4G corporate governance checklist lodged with the annual report; the governance statement is on pages 64-71. Administrative, no substance on operations.
Annual report for year to 30 June 2019, the first since the Skåne acquisition. Restates the 11 licences, the $3m raising at 2.7c and the performance share terms. Financial figures are not in the text provided.
Two of five Hörby holes done. Hole 1 hit the Dictyonema Formation shallow, confirming the historic Lyby-1 hole. Hole 2 did not, as the formation is deeper than the historic fault interpretation implied, so it was stopped. Progress slower than planned; no assays yet.
Maiden drilling began at Hörby on the Skåne project, expected to take three weeks. Diamond holes up to 125m will test the thickness and grade of the Dictyonema Seam and supply core for metallurgical work. First drilling since the 2018 relisting.
August investor presentation restating the Skåne vanadium story, with cash about A$3.7m at 30 June 2019 and 351.9m shares. It repeats known facts and contains no new results.
Preliminary micro-XRF scans with RISE show vanadium evenly spread in the clay, with little difference between surface and drill-core samples. Tomelilla: the County Administrative Board upheld the company's appeal, but the committee is appealing to the Land and Environmental Court at Växjö.
DrillCon Group appointed for the five-hole Hörby diamond programme, starting in August and expected to take three weeks. Holes up to 125m will test the Dictyonema Seam's thickness and grade. This resolves the contractor selection that was open.
Re-release of the 13 June Hörby geological update, amended only to add a JORC 2012 Table 1 because it contained maps from reprocessed geophysical data. No new results; the five-hole Hörby plan and twin of Lyby-1 are unchanged.
Per Swedish media, the Ystad-Österlen committee rejected the 10-hole Tomelilla notification on 17 June and sent it to the County Administrative Board. This blocks the southern holes for now; the company expects it to be overturned. Hörby drilling continues, with contractor proposals under assessment.
Geological update on Hörby: reprocessed airborne magnetic data supports the planned five-hole locations. One hole will twin historic hole Lyby-1, which showed an 11m formation but was never assayed for vanadium. Drill planning continues.
The County Administrative Board rejected the request to ban drilling at Hörby while appeals are pending. The company says all approvals are in place for five holes, though the appeals themselves are unresolved. Drilling timing awaits contractor arrangements.
Appeals have been lodged against the Hörby approval, and the County Administrative Board will first consider a drilling prohibition. The Ystad-Österlen decision is deferred to a later meeting. A new 10-hole programme went to six landholders in Tomelilla.
Hörby Environmental Committee approved the notification for five of the 15 planned holes, with landowner agreements already in place. The company calls it a major milestone. Appeal is possible, and the two Ystad-Österlen notifications remain undecided.
Re-release of the 18 April quarterly report, amended for the competent person statement. The visible text matches the original, with the same $4.0m cash and no new results.
Preliminary metallurgical testwork started on about 50kg of sample at ALS Perth, testing pressure oxidation leaching to recover vanadium. The company also joined a research partnership with RISE on possible uses of the waste. Early stage work.