16 Sept 2025resource reserve update▲ GoodMajor
Coal resources rose to 2,547Mt from 2,426Mt, mainly from West Muswellbrook, up to 513Mt from 239Mt on a new geological model. Recoverable reserves slipped to 818Mt from 837Mt, reflecting Bengalla and New Acland depletion. An EL9431 resource update is expected in 2026.
Bridgeport Energy's net 2P oil and gas reserves at 31 July 2025 were 4.1 million barrels of oil equivalent, down from 4.4 at 31 July 2024. 2C contingent resources were 4.9 million, unchanged. Vali/Odin gas reserves reflect a five-well early production system.
Coal resources rose to 2,426Mt from 1,928Mt, mainly from 513Mt newly reported at the acquired West Muswellbrook tenement (AL19). Recoverable reserves slipped to 837Mt from 852Mt, reflecting Bengalla model updates and New Acland depletion of 2Mt. Other estimates unchanged.
Bridgeport's net 2P reserves fell to 4.4 MMboe from 6.9 MMboe and 2C resources to 4.9 MMboe from 12.3 MMboe. Vali and Odin gas reserves were cut about 93% after weak appraisal results. Moonie and Kenmore CO2 recovery resources were moved to prospective after Queensland's June 2024 ban.
2023 coal resources total 1,928Mt (1,939Mt in 2022). Only Bengalla changed, from a new geological model and pit design; New Acland and other deposits are unchanged. Total recoverable reserves are 852Mt versus 868Mt in 2022.
Bridgeport's net 2P reserves rose to 6.9 MMboe and 2C resources to 12.3 MMboe at 31 July 2023 (6.2 and 11.0 a year earlier). Gains came from Vali and Odin appraisal wells and Kenmore CO2 recovery work. Vali and Odin are scheduled to produce this calendar year.
2022 coal statement at 31 May 2022: total resources 1,939Mt (2021: 2,655Mt) and recoverable reserves 868Mt (2021: 923Mt). Burton and Lenton were sold in 2022 and Yamala was surrendered, so their resources were removed. Elimatta was revised under a new geological model.
Bridgeport's net 2P reserves at 31 July 2022 are 6.2 MMboe (up from 5.9 at May 2021) and 2C resources are 11.0 MMboe. Vali appraisal added reserves and the Odin-1 discovery lifted contingent resources.
2021 coal resources and reserves update as at 31 May 2021: reserves and resources reduced only by mining depletion at New Acland and Bengalla. Total recoverable reserves are 923Mt, down from 939Mt; total resources 2,655Mt, down from 2,672Mt.
Bridgeport's 2P oil and gas reserves rose to 5.9 MMboe from 4.4 MMboe a year earlier, helped by Vali gas appraisal wells. Contingent (2C) resources fell to 9.3 MMboe from 12.7 MMboe, as some moved into reserves.
Bridgeport's net 2P oil reserves at 31 May 2020 fell to 4.4 MMboe from 5.7, while 2C resources rose to 12.7 MMboe from 11.3. Lower oil prices and higher Queensland royalty cut reserves; the Vali-1 gas discovery lifted resources.
2020 coal update at 31 May 2020: initial 207Mt recoverable reserve booked for Taroom; total recoverable reserves 939Mt (749Mt in 2019). Total resources 2,672Mt (2,636Mt). Bengalla and New Acland reserves fell slightly on updated models; 240Mt of New Acland reserves need approvals beyond Stage 3.
Annual coal resources and reserves at 31 May 2019: total resources 2,636 Mt, with New Acland and Bengalla down on mining depletion. New Burton resource declared; recoverable reserves 749 Mt, down from 770 Mt.
Bridgeport's net oil reserves at 31 May 2019: 2P 5.7 million barrels and 2C resources 11.3 million barrels. Compares with 5.6 and 11.4 million barrels at 1 August 2018, so broadly unchanged.
First public reserves statement for oil subsidiary Bridgeport as at 1 August 2018: 2P reserves 5.6 million barrels and 2C contingent resources 11.4 million barrels. Management says growth will come from drilling and acquiring producing onshore Cooper/Eromanga and Surat assets.
Reserves at 31 March 2013 fell 15% to 643 Mt from 753 Mt, mainly from New Acland (495 to 441 Mt: Acland township exclusion, Lagoon Creek, depletion) and Elimatta (191 to 139 Mt). Resources edged up to 2,532 Mt.
Updated JORC statement at 31 March 2012: resources up 64% to 2,511 Mt and reserves up 38% to 753 Mt since March 2011, mainly from the newly acquired Northern Energy deposits and extra Lenton resource. Up to 23.9% of Acland reserves could be lost to cropping-land rules.
Updated JORC statement at 31 March 2011: coal resources up 56% from 980 Mt to 1,529 Mt, and reserves up 12.4% from 484 Mt to 544 Mt. Based on further drilling, seismic data and remodelling. Acland resources now 855 Mt.
New Hope agrees to sell a 10% interest in the Lenton project to Taiwan's Mai-Liao Power for A$58.04m, forming the Lenton Joint Venture. Payment is conditional on an agreed resource of at least 200 Mt being delineated, and on government approvals.
Updated statement as at 31 March 2010: Acland reserves 493 Mt (previously 516 Mt in context) and total resources 980 Mt including Lenton 84 Mt. Acland resources are 879 Mt, up from 781 Mt, from further exploration.
Updated statement at 31 March 2009: Acland reserves 516 Mt and total resources 874 Mt, including Lenton 84 Mt and a new Bee Creek 9 Mt. Acland reserves are well above the 234 Mt previously reported (different basis possible).
Re-lodges the reserves and resources statement as at 31 May 2007, confirming it matches the 6 June release: 1,687 million tonnes of resources. A clarification only; no new numbers.
Marketable coal reserves rose 280% to 245 million tonnes and total resources 25% to 1,687 million tonnes. Saraji East inferred coking coal rose 226 million tonnes to 678 million. Acland Stage 3 was granted Project of State Significance status in May 2007.
Quarterly report with an updated coal resource statement as at 1 May 2006: about 1,349 million tonnes in total, with recoverable reserves of 126 million tonnes. Lenton was upgraded; Sedgman will build the Acland Stage 2 plant. Nine-month coal sold rose 10%.