Stockle - the stock oracle

Lithium Argentina AG

TSX:LAR
C$7.64Close 7 Oct 2026 · delayed

Past year: ▲ 29%(5.90 – 14.33 CAD)

Market cap
A$1.24bn
Shares on issue
162m
Story beats
8 since 2018
Last event
10 Nov 2025

History

Lithium Americas built a stake in Argentina's Cauchari-Olaroz lithium project with Ganfeng's backing, then split, moved to Switzerland and, by late 2025, faced losses and current convertible notes.

2018: Listing, Thacker Pass and a new partner

In January 2018 Lithium Americas, then based in Vancouver, won approval to list on the NYSE. It also said first production at Cauchari-Olaroz in Argentina, held 50/50 with SQM through Minera Exar, had slipped to 2020 from late 2019. In April it reported a larger resource at Thacker Pass, its Nevada project: 385 million tonnes of measured and indicated material, about 80% more than in 2016. The pre-feasibility study report was filed in early August, though the filings seen give no results or costs.

On October 31, 2018 the company completed a deal in which Ganfeng Lithium bought 37.5% of Minera Exar from SQM, lifting the company's share to 62.5%. Ganfeng also provided a US$100 million subordinated loan with limited recourse to fund the larger share of spending. The company said it had about US$300 million of available capital and over US$45 million in cash, and still targeted carbonate production in 2020.

2019-2023: Growth in shares, then a split

The record for these years is quiet, apart from the share count. Shares on issue rose from about 88.7 million at the end of 2018 to about 160.7 million by the end of 2023, but the beats do not explain the increases. In 2022 the company acquired the Pastos Grandes project in Salta through Millennial Lithium, and in April 2023 it acquired Arena Minerals, giving it 65% of Sal de la Puna. In October 2023 a court-approved plan of arrangement took effect. The Argentine business became Lithium Americas (Argentina) Corp., with John Kanellitsas as interim CEO. Thacker Pass appears to have stayed with the separate Lithium Americas Corp., though that is an inference.

2024-2026: Ganfeng deal, Switzerland and losses

In March 2024 a Ganfeng subsidiary agreed to pay up to $70 million for about 15% of Pastos Grandes. Ganfeng also got a right, until December 31, 2025, to raise its stake to 50% for a further $330 million if the company changed control. The company later reported 85.1% of Pastos Grandes, so the deal appears to have closed.

Cauchari-Olaroz began commercial production on October 1, 2024, and the company held 44.8% of Minera Exar. On January 23, 2025 it moved to Zug, Switzerland, as Lithium Argentina AG. For the third quarter of 2025 it reported a net loss of $64.5 million, mostly its $52.5 million share of Cauchari-Olaroz losses plus a $9.3 million loss on a receivable from JEMSE. Cash was $64.0 million, and the $225.5 million of convertible notes had become a current liability. About 162.4 million shares were outstanding. In March 2026 it filed a PPG scoping study and a new Cauchari-Olaroz technical report, whose results are not yet known.

Written from the 8 story beats below (2018 to 10 Nov 2025), which come from the company's own announcements and filings.

Beat by beat

The events that changed the company's story, in plain English, each written against everything known about the company at the time. The dot shows whether it was good, bad or neutral for shareholders.

shares on issue market cap (log scale)

2025162m shares · C$955m market cap

  1. 10 Nov

    Third-quarter 2025 results for Lithium Argentina AG show a net loss of $64.5 million for the quarter (versus $2.4 million a year earlier), driven by a $52.5 million share of loss from Cauchari-Olaroz and a $9.3 million loss on the receivable from JEMSE. Cash fell to $64.0 million from $85.5 million at year-end 2024, and the equity-settleable convertible notes ($225.5 million) are now listed as current liabilities. The filing confirms the January 23, 2025 move to Switzerland, a 44.8% stake in Minera Exar (Ganfeng 46.7%, JEMSE 8.5%), commercial production at Cauchari-Olaroz from October 1, 2024, and 85.1% of Pastos Grandes, so the Ganfeng deal described in March 2024 appears to have closed (inference from the reduced stake and the $70 million proceeds in the 2024 cash flow). The release also references a PPG scoping study, but its results are not in the text provided.

    resource reserve update

    162m shC$955m

2024161m shares · C$1.07bn market cap

  1. 5 Mar

    On March 5, 2024 the company (then Lithium Americas (Argentina) Corp.) signed a deal for a Ganfeng Lithium subsidiary to pay up to $70 million for newly issued shares in Proyecto Pastos Grandes S.A., expected to equal about 15% of the Pastos Grandes project in Salta, which the company acquired in 2022 through Millennial Lithium. Ganfeng could get up to 1.6% more based on a resource estimate, and until Dec 31, 2025 Ganfeng would have a right to raise its stake to 50% for a further $330 million (total $400 million) if the company undergoes a change of control. Closing is expected in Q2 2024, subject to conditions including Chinese regulatory approvals, and the company says proceeds are meant to strengthen its balance sheet and fund Argentine projects.

    business combination

    161m shC$1.07bn

2023135m shares · C$3.12bn market cap

  1. 4 Oct

    The filer is now named Lithium Americas (Argentina) Corp. The exhibit list shows a court-approved final order and plan of arrangement, a notice of change in corporate structure, a notice of make-whole fundamental change to noteholders and a supplemental indenture dated October 3, 2023, and a lock-up agreement with GFL International Co., Limited. A tax indemnity agreement with Lithium Americas Corp. and a second amended equity incentive plan are also listed, and John Kanellitsas signs as President and Interim CEO. This is a cover page with exhibit titles only, so the terms (including what happens to existing shares or the convertible notes) are not stated; the structure suggests a reorganisation that separates the Argentine business, which is an inference. It appears to leave Hodgson's CEO role replaced by an interim CEO.

    business combination

    135m shC$3.12bn

201888.5m shares · C$398m market cap

  1. 1 Nov

    The company announced completion (October 31, 2018) of the Cauchari-Olaroz transactions announced August 13, 2018: Ganfeng Lithium acquired a 37.5% interest in Minera Exar from SQM, leaving the company with 62.5% (up from 50%). Ganfeng also provided a US$100 million limited-recourse, subordinated loan facility to fund the company's larger share of project spending. The company said it has about US$300 million in available capital and over US$45 million cash, that filling of the first pond began in October, and that carbonate production remains on track for 2020. This changes the earlier 50/50 SQM partnership to a Ganfeng partnership.

    business combination

    88.5m shC$398m
  2. 7 Aug

    The company furnished the full Thacker Pass pre-feasibility technical report (effective August 1, 2018, prepared by Advisian and other consultants) with seven qualified-person consents. The portion provided covers only the cover pages and certificates, so no mine economics, costs or reserves can be stated from it.

    resource reserve update

    88.5m shC$443m
  3. 7 Aug

    On August 2, 2018 the company announced it had filed the technical report on the Thacker Pass pre-feasibility study, which was due by the end of Q2 2018 (the report's effective date is August 1, 2018). The press release gives no study results, so the economics are not stated here.

    resource reserve update

    88.5m shC$443m
  4. 5 Apr

    The company announced a new resource estimate for the Thacker Pass deposit of the Lithium Nevada project: Measured and Indicated of 385 million tonnes at 2,917 ppm lithium (6.0 million tonnes of lithium carbonate equivalent), about 80% more than the 2016 estimate, plus Inferred of 147 million tonnes (2.3 million tonnes LCE). This follows from the 2017 drilling of 77 holes and replaces the 2016 figures restated in January. The preliminary feasibility study is stated to be on track for release by the end of Q2 2018.

    resource reserve update

    88.5m shC$618m
  5. 19 Jan

    Lithium Americas (then a Vancouver-based company, TSX-listed and trading on OTCQX) said its shares were approved to list on the NYSE, with trading expected to start January 25, 2018. It also said first production at the Cauchari-Olaroz project in Argentina, held through the 50/50 Minera Exar joint venture with SQM, is now targeted for 2020 rather than late 2019 as previously forecast, so shareholders face a roughly one-year delay. Work on the Lithium Nevada pre-feasibility study was reported as on plan.

    listing compliance notice

    88.5m shC$989m