Each one in plain English, with the numbers worked through for a shareholder.
14 May 2012drilling spud▲ GoodMajor
A 2,000m reverse circulation drill program began at Sara Sara, Peru, the first follow-up to the 2010 silver hit of 16.4m at 410g/t. Mineralisation is open in all directions. This is Global's first Sara Sara drilling since that 2010 discovery.
Field programs have started in Nevada and Peru, with 5,000m+ of drilling scheduled for the June quarter, including 2,000m at Sara Sara from May and 3,000m at Lone Mountain. Global describes the 2012 exploration budget as fully funded at $2.5M.
Half-year to 31 December 2011 loss was $434,092 (prior year $124,711), including a $190,000 investment write-down. No capital raisings in the period. Subsequent events repeat the Osisko agreement and A$852,000 subscription at $0.06.
Roadshow presentation repeating known facts: the Osisko US$8M deal, Lone Mountain gravity targets, Excelsior 7.6m at 5.1g/t gold and Sara Sara 16.4m at 410g/t silver. Notes a US$2M minimum 2012 budget. No new results.
A detailed gravity survey (547 stations) at Lone Mountain identified untested drill targets at 100-300m depth that could host Carlin-style gold. Drilling is planned and will be funded by Osisko under its US$8M earn-in. Follows the December gravity work; no drill results yet.
Osisko Mining can earn 45% of Global's five Nevada gold projects by funding US$8M over up to four years (minimum US$2M in year one), and has subscribed A$852,000 for 14.2M shares at $0.06. Global stays operator. Osisko can lift to 70% by funding a feasibility study.
30 Nov 2011asset acquisition disposition▲ GoodMajor
Global took an exclusive lease and option to buy 100% of the 35 sq km Lone Mountain gold project in northern Nevada, a Carlin-style target between the Carlin and Independence trends. Only four holes drilled in 13 years; gravity survey then RC drilling planned.
Annual report for year to 30 June 2011 covering Sara Sara silver, the failed New Morenci hole and the Excelsior start. It notes the $4M raised in the year and that four in every five dollars went to exploration. Largely repeats known events.
Global's first Excelsior drilling, 23 RC holes (3,657m), hit shallow oxidised gold across 2.2km, e.g. 7.6m at 5.1g/t from 93m. Mineralisation is open along strike and at depth. Infill drilling is planned. This follows the July drilling start.
Drilling starts next week at Excelsior, Nevada: about 2,000m of RC to follow up Buster zone intersections (e.g. 47m at 1.5g/t Au) and test three new, previously undrilled targets. Global is earning 70% of the project.
July presentation repeating known projects. It shows market value of about $5M at $0.035 per share, $2.1M cash at 31 March, and a 2011 schedule: Excelsior drilling July-Aug, Bartlett Aug-Sept, with later programs subject to results and funding.
Global leased, with an option to buy, the 0.6 sq km Pearl claims next to Bartlett in Nevada, giving control of a 1.6km copper-gold zone plus 30 years of data including IP. The company's own IP survey is no longer needed. Drilling follows Excelsior.
Presentation at a resources symposium repeating known projects and plans. It shows 129.05M shares, $2.1M cash and a market value of $6.4M at $0.05. Planned work includes Nevada IP surveys and RC drilling at Excelsior and Bartlett, and RC drilling at Sara Sara in the December quarter.
An induced polarisation survey has started at Excelsior Springs, covering 3km of the mineralised trend and five gold zones, three never drilled. It should take about three weeks, with drilling scheduled to begin in July.
The Sara Sara diamond program ended after seven holes (3,600m). Best result was KPD-03 at 36m at 0.27% Cu; the other six hit only sporadic low-grade copper and molybdenum. No porphyry copper has been found yet. Future RC silver drilling and a deeper hole to 1,500m are planned, subject to a rig.
Global can earn 70% of the Excelsior Springs gold project in Nevada from Canada's Nubian Resources by spending $3M over four years plus $100,000 cash; minimum $150,000 by end 2011. Includes the historic Buster mine, with past drill hits such as 33m at 2.9g/t Au. This adds a new gold project.
Half-year to 31 December 2010 showed a net loss of $124,711 (prior year $198,405). Three placements and offers at $0.07 were issued, including the 20M-share Tranche 2 on 13 December. Bartlett Peak now has a drill permit. No significant subsequent events reported.
Sara Sara hole KPD4 hit only thin, low-grade copper: 3m at 0.25% from 222m and 9m at 0.13% from 267m, weaker than KPD3's 33m at 0.28%. Management attributes this to quartz-rich rock unsuited to enrichment. KPD5 is finished at 507m; KPD6 has started.
Dry weather lets Sara Sara drilling continue into February. KPD4 is complete at 495m with assays pending, KPD5 is at 446m. Sequential tests show 81-99% (average 92%) of the copper is leachable, supporting the supergene interpretation.
Company's December 2010 share trading policy for directors and key management, covering insider trading rules and blackout periods around reports. Administrative document with no operational or financial news.
Sara Sara hole KPD3 hit 33m at 0.28% copper from 183m, mainly chalcocite in a supergene (enriched, often leachable) blanket. Management says all three holes in the Target Zone show it, and sees it as evidence of nearby primary copper. This is a new discovery-style result.
Surface sampling extended the untested copper-gold anomaly at the 100%-owned Bartlett Peak, Nevada, to 400m by over 1,000m, with rock chips up to 1.5% Cu. An IP survey is planned early 2011 before any drilling; a drill permit has been applied for.
Allotment of 27,263,000 shares completes the entitlement offer at $0.07, leaving 109,052,000 shares on issue. Funds go mainly to Sara Sara drilling and gold and copper prospects. The 20M-share Tranche 2 placement is not reflected in this count.
What it means for a shareholder
27.3m new shares at $0.070 to raise about $1.9m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.