Clarification of the June quarter report under listing rules: exploration spending was A$493,000 on drilling and assay, A$96,000 on tenement costs and A$158,000 on technical evaluation. No spending on mining or production. No new business information.
CRP0016D returned 190m at 0.6% copper and 0.2g/t gold from 392m, extending Cortadera's high grade core over about 800m vertically. CRP0042D hit 314m at 0.4% copper. Drilling moves next to Cuerpo 2; maiden resource still being finalised, with a second estimate planned for early 2021.
Amended re-release of the 31 July metallurgy results, adding sample details, maps and removing unrelated information. It also discloses that molybdenum recovery assays were contaminated by grinding media, so molybdenum recovery was assumed in line with copper. Headline copper results unchanged.
First metallurgical tests on Cortadera and San Antonio sulphide ore gave rougher copper recoveries of 89% to over 95%, with no problem impurities. Company says Cortadera, Productora and San Antonio can be one combined development, now named Costa Fuego. Results are early-stage; concentrate grade testing is still to come.
Virtual copper conference presentation repeating known facts: Productora lease mining started, Cortadera's six record drill results, and the 972m at 0.5% copper intercept. No new results or announcements.
Lease mining started at Productora's Santa Innes underground mine, four months ahead of schedule, under the June ENAMI agreement. Initial head grade targeted at 1.8% copper; revenue to Hot Chili estimated at A$1.4-1.8m a year (up from A$1.2-1.5m), with talks to expand the deal.
Amended re-release of the 10 July update adding the JORC Table 1 and visual sulphide estimates (CRP0016D 1.5-3.0% chalcopyrite, 390-610m). Compliance re-issue; no assay results yet and no new business information.
CRP0016D shows a 220m zone of strongly mineralised porphyry, with assays due within a fortnight. CRP0042D ended at 945m in mineralisation after deviating and will be re-drilled later. CRP0043D has started; maiden Cortadera resource still due late July.
162.0m shortfall shares were issued at 1.5c, raising A$2.4m, completing the entitlement offer. Placement options (166.7m) and 50m options to Veritas were approved at the 26 June meeting and issued. Includes cleansing notice.
24 June 2020capital raising announcement▲ GoodMajor
The entitlement offer raised A$1.48m (37% take-up), and Veritas placed the roughly A$2.4m shortfall at 1.5c. Total raised is about A$3.9m, completing the offer. Board also approved 60m management performance rights, with price and 750Mt resource hurdles.
Diamond drilling restarted at Cortadera after the COVID suspension. CRP0042D was re-entered and is at 880m, with over 300m of mineralised porphyry, now planned to 1,300m. Assays are expected in July; Habanero Lode is the likely ENAMI mining target.
The entitlement offer closing date was pushed from 10 June to 19 June 2020 because of postal delays in reaching shareholders. Timetable shifts only; offer terms are unchanged.
Hot Chili signed the formal two-year ENAMI agreement to lease-mine about 120,000 tonnes a year from Productora, confirming the March non-binding acceptance. It pays US$2/t plus a 10% royalty; company estimates A$1.2-1.5m a year to Hot Chili, first revenue expected Q4 2020.
Offer documents and entitlement forms were dispatched to eligible shareholders for the 3-for-20 entitlement offer at 1.5c, to raise up to about A$3.9m. Administrative step; the offer terms are unchanged.
Letter to shareholders outside Australia, NZ, Chile, Hong Kong, Singapore and the UK telling them they cannot take part in the entitlement offer. Administrative notice, no action required. (The letter states a 2-for-9 ratio, which conflicts with the 3-for-20 offer elsewhere.)
18 May 2020capital raising announcement● NeutralMajor
Entitlement offer prospectus: 3 new shares for every 20 held at 1.5c, with one free 2.5c option (expiring 20 May 2022) per two new shares, to raise up to about A$3.9m. Veritas is lead manager; offer closes 10 June 2020.
18 May 2020capital raising announcement▲ GoodMajor
Hot Chili arranged a A$5m placement of 333.3m shares at 1.5c with one free 2.5c option (exp. 20 May 2022) per two shares, plus the A$3.9m rights issue at the same price. Company says this removes near-term funding uncertainty and funds the US$2m Carola fee and drilling restart.
What it means for a shareholder
333m new shares at $0.015 to raise about $5.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Second amended March quarterly report, issued because the previous release again contained the old incorrect figures. Administrative correction only; no new business information in the text provided.
SCM Carola agreed a 12-month extension: the US$10m Cortadera payment now falls due mid-July 2021 and US$15m mid-July 2022, in return for a US$2m fee by 15 July 2020. This defers the instalment previously due about 18 months from the MOU.
Hot Chili accepted, non-binding, ENAMI's offer to lease-mine and process about 120,000 tonnes a year from Productora over two years, with US$2 a tonne plus a 10% royalty. Company estimates US$400-500k a year to its 80% share; formal agreement still pending.
CRP0040D, the 100m southern step-out pending since February, returned 542m at 0.5% Cu and 0.2g/t Au from 422m, including 218m at 0.7% Cu. Drilling is suspended in Chile owing to Coronavirus; cash is over A$2m, down from A$6.4m in November.
Half-year to 31 December 2019 shows a loss of A$3.09m (A$0.59m a year earlier). The report recaps Cortadera results and continued interest from large groups; no significant change in the state of affairs is reported.
Fremantle conference presentation promotes Cortadera as a world-class discovery, repeating the 972m at 0.5% Cu CRP0020D result and the global drill-result ranking. No new results or figures beyond those already announced.
CRP0040D, a 100m southern step-out, has about 550m of mineralised porphyry and is at 900m, being extended to 1,100m; assays are due within a fortnight. First deep RC hole CRP0041 at Cuerpo 3 North is underway. No new assay results.
CRP0032D, abandoned for deviation, ended with 92m at 0.5% Cu and 0.2g/t Au; a shallow RC hole returned 20m at 1.0% Cu. The company says Cortadera could grow toward Tier 1 (+5Mt copper); its potential size estimates have more than doubled since February 2019.
CRP0029D, the first expansion hole, returned 649m at 0.4% Cu and 0.1g/t Au from 330m, ending in mineralisation. It extends the northern contact of Cuerpo 3 by 70m. CRP0032D was terminated at 739m due to deviation; two rigs restart in 2020.