Stockle - the stock oracle

Hot Chili

ASX:HCH
No current share price held for this company.
No price history held for this listing yet.
Market cap
—
Shares on issue
—
Story beats
189 since 2010
Last event
19 Oct 2026

The story so far

The events that changed the company's story, in plain English, each written against everything known about the company at the time. The dot shows whether it was good, bad or neutral for shareholders.

2026

  1. 19 Oct

    Step-out drilling indicates a second porphyry centre, La Verde South. DKP084, 250m south, hit 148m at 0.44% CuEq from 36m; diamond hole DKD100 visually shows 307m of porphyry-style mineralisation (assays pending). The company says this near-doubles growth potential; resource, PFS and EIA are on track.

    drilling result

  2. 7 July

    Binding agreement with OR Royalties (formerly Osisko) for US$15m (about A$21.3m) to extend its royalty to La Verde, lifting total royalty funding to US$30m. Non-dilutive. Closing expected July 2026, subject to conditions. Change-of-control buyback terms updated; builds on the 2023 Costa Fuego royalty.

    material agreement

  3. 8 Apr

    La Verde hole DKD039 hit 725m at 0.36% Cu from 18m, including 62m at 1.03% CuEq from 671m, extending the high-grade core about 200m down-dip. Two rigs are running, a third is planned for May, and assays are pending for eleven holes.

    drilling result

  4. 16 Feb

    La Verde holes DKD036 (150m at 0.37% Cu, 0.21 g/t Au from 30m) and DKD035 (220m at 0.37% Cu, 0.14 g/t Au from 38m) add to the shallow higher-grade zone. Company says it looks likely to give Costa Fuego a higher-grade starter pit. DKD039 visual results only; assays due April 2026.

    drilling result

  5. 4 Feb

    The A$40m placement was oversubscribed at A$1.65, for 24,242,425 new shares, with Glencore, Blue Spec and GS Group participating. Funds La Verde drilling, the Costa Fuego feasibility study and an EIA submission in late 2026. Several non-binding partner proposals remain under assessment.

    capital raising announcement

  6. 2 Feb

    Company launched a best-endeavours placement of up to about A$40m at A$1.65 per share, a roughly 15% discount to the last close, with a trading halt. Funds La Verde drilling toward a maiden resource, the Costa Fuego feasibility study and EIA. Brokers get a 6% fee and options at A$2.145.

    capital raising announcement

2025

  1. 27 Nov

    First La Verde diamond hole DKD032 returned 529m at 0.41% Cu and 0.21 g/t Au, including 148m at 0.60% Cu. It extends the earlier 308m discovery hole and ended in mineralisation; company says results exceeded expectations. Assays pending for five more holes.

    drilling result

  2. 9 Oct

    Hot Chili received a Sectoral Permit on 9 October 2025 to expand La Verde drilling, to test lateral extensions and three nearby look-alike targets. Two of eleven phase-two diamond holes were complete, showing visual porphyry copper mineralisation with assays pending, and a second RC rig was planned.

    drilling progress report

  3. 25 Sept

    Phase-two diamond drilling began at La Verde on 22 September 2025 with one rig on double shifts, targeting depth extensions to the three higher-grade centres. Further drill access approvals are described as in final stages. Follows phase-one RC results; no new assays.

    drilling spud

  4. 5 Sept

    The rights issue closed fully subscribed, raising A$14.2m (23,609,854 new shares at A$0.60) before costs. It resolves the open funding thread after cash fell to A$5.2m. Funds the BMO-led partnering process and La Verde diamond drilling.

    capital raising announcement

  5. 5 Aug

    A$14m non-renounceable rights issue, 2 new shares for every 13 held at A$0.60, not underwritten, lead manager Veritas. Funds the partnering process and La Verde diamond drilling toward a maiden resource. Company is assessing several non-binding partner proposals.

    capital raising announcement

  6. 19 May

    Final phase-one La Verde assays more than double the footprint to 1,000m x 750m, to 400m depth, from 31 RC holes (9,600m). Best: 389m at 0.4% Cu (DKP030). Three higher-grade centres found; open laterally and at depth. Phase two awaits drill access approval.

    drilling result

  7. 7 May

    Stuart Mathews, former Gold Fields executive vice president, appointed Non-executive Chair, and Alberto Cerda as executive Project Director, ahead of the Costa Fuego and Huasco Water DFS. This fills the chair vacant since Dr Adshead-Bell resigned on 11 March.

    director officer appointment

  8. 31 Mar

    Huasco Water PFS: Stage 1 seawater supply (500 L/s) post-tax NPV8% US$122m, IRR 19%, capex US$151m; Stage 2 desalinated (1,300 L/s) NPV US$977m, capex US$1.4bn. MOU signed for seawater supply to Costa Fuego. No offtake yet for Stages 2-3.

    investor presentation

  9. 27 Mar

    Costa Fuego PFS delivered, as promised for Q1 2025, with maiden Probable Ore Reserve of 502Mt at 0.37% Cu. Post-tax NPV8% US$1.2bn, IRR 19%, start-up capex US$1.27bn, 20-year life. Company is seeking strategic partners or funding.

    resource reserve update

  10. 11 Mar

    ASX paused trading in Hot Chili shares pending a further announcement. No reason given in the notice; the board changes released the same day may be related (inference).

    other

  11. 11 Mar

    Chair Dr Nicole Adshead-Bell and director Stephen Quin resigned with immediate effect. The company says further board appointments will strengthen capability ahead of the Costa Fuego and Huasco Water PFS releases. No reason for the resignations given.

    director officer appointment

  12. 11 Feb

    Ten more La Verde RC holes confirm the discovery, e.g. DKP009 320m at 0.3% Cu, 0.1g/t Au. Footprint now 550m x 400m and open; 8 of 12 holes end in mineralisation. Seven holes pending, diamond drilling planned. Cash A$19m.

    drilling result

2024

  1. 18 Dec

    First two La Verde holes hit copper-gold: DKP002 returned 308m at 0.5% Cu, 0.3g/t Au, including 202m at 0.6% Cu. Company calls it a discovery. Ten more holes await assay; program expanded to 6,000m. PFS still due Q1 2025.

    drilling result

  2. 11 Nov

    Hot Chili took a three-year option to buy 100% of the La Verde copper mine, 30km south of Costa Fuego, within the Domeyko landholding. A 4,000m drill program began 30 October. PFS delayed from late 2024 to Q1 2025; cash A$25.7m.

    asset acquisition disposition

  3. 8 July

    Hot Chili (80%) and CMP (20%) set up Huasco Water to supply seawater and desalinated water to the Huasco Valley. This is the stand-alone water company flagged in April. Asset transfer has begun; talks with other potential customers are under way but none are signed.

    joint venture update

  4. 27 May

    The share purchase plan was upsized from A$5m to A$7m and scaled back, with about A$2.75m refunded. With the placement, Hot Chili raised about A$31.9m from 31.9m shares at A$1.00. Veritas gets a A$360,000 commission plus 420,000 options at A$1.50, subject to shareholder approval.

    capital raising announcement

  5. 6 May

    Hot Chili secured a A$24.9m placement of 24.9m shares at A$1.00 and plans a share purchase plan of up to A$5m at the same price. With existing cash it says this funds up to 18 months, including the PFS due H2 2024.

    capital raising announcement

  6. 2 May

    Hot Chili launched a placement of up to A$29.9m (29.86m shares) at A$1.00, about a 20% discount to the last close. It is intended to fund up to 18 months of PFS, water study, EIA and exploration. Trading was halted pending the result.

    capital raising announcement

  7. 30 Apr

    Hot Chili took an option over the Domeyko cluster, 141km2 about 30km south of the planned Costa Fuego processing site, a 25% lift in its landholding. Exercise price totals US$4.0m, with a final US$3.48m payable within 48 months. Largest consolidation since Cortadera in 2019.

    farm in farm out agreement

  8. 14 Mar

    Hot Chili signed an MOU with Puerto Las Losas giving up to five years to negotiate a binding port services agreement. It will fund 20% of a ~US$4.6m, two-year port feasibility study, with a three-year right of first refusal afterwards. Follows the January 2022 letter of intent.

    material agreement

  9. 26 Feb

    Costa Fuego Indicated resource rises to 798Mt at 0.45% CuEq (2.9Mt Cu), from 725Mt at 0.47%; Inferred is 203Mt at 0.31%. Cortadera Indicated grows to 531Mt. Over 85% is now Indicated, supporting a maiden reserve in the H2 2024 pre-feasibility study.

    resource reserve update

  10. 26 Feb

    Hot Chili completed a concept study for a multi-user desalination water business in the Huasco valley, with potential demand up to 3,700 litres per second. It holds the only granted maritime water concession. A fuller business case study has started; no customers or funding are signed.

    other

  11. 21 Feb

    Hot Chili signed the Cometa option with Bastion for 100% of 56km2 of concessions, 15km southeast of the Costa Fuego operating centre. It paid US$100,000, owes US$200,000 within 12 months, and can exercise for US$2.4m or US$3.0m. This resolves the August 2023 letter of intent.

    farm in farm out agreement

2023

  1. 7 Dec

    Hot Chili replaced three options (San Antonio, Valentina, Santiago Z) due in 2024 with one El Fuego option exercisable by September 2026. 2024 payments fall from US$11m to US$1m; total price US$4.3m. Interest rises from 90% to 100% if exercised. Up to US$4m more is contingent on copper price or resource size.

    material agreement

  2. 15 Nov

    Hot Chili signed options to buy two historic copper mine areas, Marsellesa and Cordillera, about 10km southwest of Costa Fuego's planned hub. Marsellesa exercise costs US$1.0m, Cordillera US$3.7m, plus 1% to 1.5% royalties. First-pass drilling, the first ever on either, is planned within a week.

    farm in farm out agreement

  3. 28 Aug

    Hot Chili signed a binding letter of intent with Bastion Minerals for an option on the 56km2 Cometa project, 15km from Costa Fuego's planned operating centre. Cost is US$100,000 on grant and US$200,000 within 12 months; exercise price is US$2.4m (18 months) or US$3.0m (30 months), payable in cash or half in shares. Nine RC holes (2,010m) are drilled at Cortadera.

    farm in farm out agreement

  4. 3 Aug

    Drilling restarted on the western extension of Cortadera, starting the 30,000m Costa Fuego programme funded by the Osisko deal (about A$26m cash). One RC rig is running, with diamond rigs to follow. First holes fulfil the remaining 3,000m AMSA commitment; resource update due H2 2023.

    drilling spud

  5. 26 July

    The Osisko deal closed: Hot Chili received US$15m for a 1.0% copper and 3% gold royalty on Costa Fuego, lifting cash to about A$26m. A 30,000m drill programme starts in coming weeks; resource upgrade late 2023, PFS H2 2024.

    asset acquisition disposition

  6. 28 June

    First Costa Fuego PEA: post-tax NPV8% US$1.10bn, IRR 21%, start-up capital US$1.05bn, 16-year mine life, about 112ktpa CuEq. Uses US$3.85/lb copper. Preliminary study (+/-35%); PFS now due H2 2024, later than the H1 2024 earlier planned.

    resource reserve update

  7. 28 June

    Hot Chili signed a binding US$15m deal with Osisko Gold Royalties for a 1.0% copper and 3% gold royalty on Costa Fuego, with no share issue. Cash would rise to about A$26m. A 30,000m drill programme follows closing.

    debt financing

  8. 4 Apr

    Drilling below Cortadera's Cuerpo 1 found mineralisation up to 300m beneath the current resource, including 270m at 0.5% CuEq from surface (CRP0202D). First-pass drilling on the AMSA ground is complete with 15 of 16 holes pending; resource update planned for H2 2023.

    drilling result

  9. 23 Feb

    First hole on the AMSA ground, LCD0001, returned 120m at 0.5% CuEq including 38m at 1.0% CuEq, confirming a fourth porphyry (Cuerpo 4) as the earlier AMSA hole suggested. Deeper mineralisation also found below Cuerpo 1; cash about A$10m.

    drilling result

  10. 13 Jan

    Drilling started on the western extension of Cortadera: a roughly 10,000m programme testing four porphyry targets, starting with Cuerpo 4. Prospective strike length is 5.2km. PEA due H1 and resource upgrade H2 2023; PFS now H1 2024, later than the Q1 2023 previously expected.

    drilling spud

2022

  1. 30 Nov

    Hot Chili won seven further mining rights (757ha) at a Huasco public auction; three cost US$110,000 and four were awarded after third-party rights were forfeited. With the AMSA option, Cortadera's prospective strike rises from 2.3km to 5.2km, with four porphyry targets.

    asset acquisition disposition

  2. 28 Nov

    Hot Chili signed an option with Antofagasta Minerals to acquire 100% of five mining rights west of Cortadera, including the Cuerpo 4 porphyry. It lifts prospective strike from 2.3km to 4.1km; 6,000m first-pass drilling planned. The text says the transaction is low-cost; option price not visible in the provided text.

    asset acquisition disposition

  3. 24 Aug

    Valentina diamond hole VALMET0002 returned 3m at 12.1% CuEq within 12m at 4.6% CuEq, confirming the VAP0009 result and the earlier visual intersection. Mostly sulphide, suited to flotation. Six Valentina and twelve San Antonio holes still pending.

    drilling result

  4. 18 Aug

    Chile's electricity regulator approved Costa Fuego's connection to the Maitencillo substation, 17km from the project centre. A binding process to select power providers is expected in Q4 2022. Advances infrastructure readiness ahead of the Q1 2023 PFS.

    regulatory community update

  5. 8 Aug

    Valentina RC hole VAP0009 returned 8m at 5.9% CuEq (5.7% Cu), the company's highest-grade intersection to date, extending mineralisation 120m south of old workings. Assays are pending for 17 more Valentina holes and 16 San Antonio holes; first Santiago Z drilling is underway.

    drilling result

  6. 19 July

    Final Cortadera development hole CORMET004 hit 484m at 0.5% CuEq, and Productora metallurgical holes hit up to 45m at 1.2% CuEq. Drilling cut from three rigs to one with cost rationalisation; cash about A$22m, which the company says funds it into late 2023.

    drilling result

  7. 14 June

    An amended PDAC presentation changed the Costa Fuego PFS timing from 'due Q3/22' to 'was due Q3/22, now with revised completion Q1/23'. That put the study back by roughly two quarters.

    admin correction

  8. 20 May

    Cortadera hole CORMET005 hit 658m at 0.6% CuEq, including 130m at 0.9%, plus 30m at 1.4% outside the current high-grade model. Third Cuerpo 3 hole to show the high-grade core growing, ahead of the PFS and resource upgrade later in 2022. Drilling started at Valentina and San Antonio.

    drilling result

  9. 31 Mar

    Costa Fuego resource upgraded: Indicated 725Mt at 0.47% CuEq (up 67%) and Inferred 202Mt at 0.36%. High-grade Indicated is 156Mt at 0.79%. Over 80% is now Indicated, fulfilling the Q1 upgrade promise and setting up the Q3 2022 PFS. Company says it is funded for 18 months.

    resource reserve update

  10. 3 Mar

    Hot Chili signed a binding offtake agreement with Glencore for 60% of Costa Fuego copper concentrate for 8 years from commercial production, on stated arms-length benchmark terms. This completes the negotiation open since 2021; 40% stays uncommitted ahead of 2022 project financing talks.

    material agreement

  11. 1 Mar

    Founding chairman Murray Black retires after 12 years, remaining a shareholder. Dr Nicole Adshead-Bell, who joined the board in January, becomes independent non-executive chairman.

    director officer appointment

  12. 21 Jan

    Letter of Intent signed with Puerto Las Losas to negotiate port services at Huasco, about 50km from the planned Costa Fuego plant. A binding offer is due within 12 weeks, with operations targeted for late 2025 if an agreement is signed. Not yet binding.

    material agreement

  13. 4 Jan

    Hot Chili shares began trading on the TSX Venture Exchange on 4 January 2022 under HCH, alongside ASX. This completes the dual listing planned since 2021 and closes that open thread.

    other

2021

  1. 23 Dec

    The Canadian IPO closed, with 21,567,286 shares issued at CAD$1.55 for CAD$33.4m gross proceeds. Issues to Blue Spec, 10.9m warrants and underwriter warrants still need shareholder approval at a meeting around 24 January. TSXV trading is expected the week of 27 December.

    capital raising announcement

  2. 21 Dec

    Final Canadian prospectus receipted. The underwriters will exercise the over-allotment option, lifting the raising to CAD$33.79m at CAD$1.55, with Glencore topping up to hold 9.99%. Conditional TSXV listing approval received. A new NI 43-101 report shows Costa Fuego at 391Mt Indicated and 334Mt Inferred.

    capital raising announcement

  3. 10 Dec

    Underwriters agreed a CAD$30m placement at CAD$1.55 per share, a 14% discount to the last close, with a free warrant per two shares at CAD$2.50. Glencore keeps 9.99%. Funds are said to cover 18 months of drilling and studies; completion depends on Canadian and TSXV approvals.

    capital raising announcement

  4. 4 Nov

    Hot Chili lodged a preliminary Canadian prospectus for an IPO to support its TSXV dual-listing application, led by iA Capital Markets and Cormark. Price and size are not yet set; proceeds target the Cortadera resource upgrade, the PFS and exploration. Listing is not assured.

    capital raising announcement

  5. 14 Oct

    Hot Chili proposes a 50-for-1 share consolidation, cutting shares from 4.37bn to about 87.4m, for shareholder vote on 15 November. It is aimed at the TSXV dual listing, still on track for Q4. No change to percentage holdings.

    security holder rights change

  6. 28 Sept

    A materials-handling scoping study found a RopeCon rope conveyor could carry Cortadera ore about 14km to Productora for under 10% of truck operating cost. The PFS will keep central processing at Productora. Study-stage finding; the PFS is still in progress.

    other

  7. 23 Sept

    Hot Chili exercised its option and now owns 100% of Cortadera after the final US$15m payment, completed 21 September; total paid is US$32m since February 2019. Management says this is almost a year ahead of schedule. It resolves the pending payment.

    asset acquisition disposition

  8. 10 Sept

    Cortadera's north flank returned CRP0124D 362m at 0.6% CuEq, including 82m at 1.0%. Final CRP0088D assays upgraded the June result to 486m at 0.6% CuEq, including 168m at 1.0%. High grade is continuous over 400m. 6,302m of assays remain pending.

    drilling result

  9. 3 Sept

    Glencore nominee Mark Jamieson, a Glencore copper resource engineering manager, joined the board. This follows Glencore's 9.99% investment in the August raising and fills the board seat agreed on 2 August. The announcement calls the raising A$40m.

    director officer appointment

  10. 31 Aug

    Hot Chili repaid the US$1.5m option fee and CMP accepted it, removing CMP's 2015 option to buy a further 32% of Productora. CMP keeps its 20% and contributes to spending. This resolves the earlier option thread, which previously ran to 50.1%.

    material agreement termination

  11. 6 Aug

    Hot Chili raised A$35m at 3.2c through a placement of 1.094bn shares, cornerstoned by Glencore at A$13.93m, plus a underwritten A$5m SPP at the same price. Funds pay the final US$15m for 100% of Cortadera immediately. Tranche 2 needs shareholder approval around 15 September.

    capital raising announcement

  12. 2 Aug

    Glencore agreed to invest A$14.4m for a 9.99% stake in Hot Chili. It gets a board seat, a technical committee role, and offtake over 60% of concentrate for 8 years from commercial production, while holding at least 7.5%.

    material agreement

  13. 9 July

    Hot Chili has started the formal process to dual list on Canada's TSX Venture Exchange by end 2021, having paid fees and appointed legal advisers. Listing needs TSXV approval and is not guaranteed. It follows the OTCQB listing in May.

    other

  14. 17 June

    Wood was appointed lead engineer for the Costa Fuego pre-feasibility study, which is now underway. It will consider 20-30Mtpa throughput and is expected to complete in Q3 2022. This follows the 2016 Productora PFS and the Cortadera addition.

    material agreement

  15. 16 June

    CRP0088D at Cortadera's main porphyry returned 410m at 0.6% CuEq from 440m, including 144m at 1.0% CuEq. CRP0047D gave 218m at 0.6% CuEq from 720m. A new porphyry zone links Cuerpo 1 and 2, so all centres connect over 2.3km. Assays for 5,900m pending.

    drilling result

  16. 18 May

    CRD0080 at Cortadera returned 836m at 0.4% copper and 0.1g/t gold (0.5% CuEq) from 536m, including 436m at 0.5% copper from 536m. It extends the main porphyry's southern flank by about 80m. CRP0062D gave no significant result but shows the two largest porphyries connect at depth.

    drilling result

  17. 18 Mar

    CRP0061D at Cortadera's main porphyry (Cuerpo 3) returned 813m at 0.4% copper and 0.1g/t gold from 54m, including 318m at 0.6% copper from 440m. It extends the high grade core. The hole was abandoned at 863m of a planned 1,500m due to mechanical issues.

    drilling result

  18. 2 Mar

    Hot Chili consolidated Santiago Z, a new 5,468ha landholding 5km south of Cortadera, adding 20% to Costa Fuego land. The landowner added it to the San Antonio option at no cost and extended that option by 24 months. It has a large soil molybdenum anomaly, never drilled; first-pass drilling is planned for later in 2021.

    asset acquisition disposition

  19. 8 Feb

    The US$10m Cortadera instalment, originally due mid-July 2021, has been paid early, bringing payments to SCM Carola to US$17m. Only US$15m remains, due mid-July 2022, leaving over 18 months before the final payment.

    asset acquisition disposition

2020

  1. 17 Dec

    CRP0053D, the first deep hole below Cuerpo 2 at Cortadera, hit 248m at 0.4% copper and 0.1g/t gold from 446m, including 32m at 0.6%. It follows the 11 November preliminary news of 500m of mineralisation and points to a second high-grade core.

    drilling result

  2. 11 Dec

    The ENAMI lease mining agreement was expanded by 50%, lifting the maximum ore supply to 180,000 tonnes a year, using all remaining capacity at ENAMI's Vallenar plant. The Productora venture (80% Hot Chili) gets US$2/t plus a 10% royalty. Ramp-up awaits new decline access; output so far is small-scale.

    material agreement

  3. 7 Dec

    Hot Chili was granted a Maritime Concession to extract sea water 60km from Costa Fuego, after a seven-year application process. It secures the water supply for a large-scale operation without a desalination plant; the pipeline design is to be extended to Cortadera.

    regulatory community update

  4. 1 Dec

    Hot Chili raised A$25.6m through a placement of 609.8m shares at 4.2c, led by Veritas Securities. It funds the US$10m Cortadera payment and a 40,000m drill programme for 2021, ending the trading suspension. Chairman-linked Blue Spec's 11.9m shares need shareholder approval.

    capital raising announcement

  5. 20 Nov

    Hot Chili's shares were suspended at its own request, pending an announcement on a capital raising. Suspension runs until 1 December 2020 at the latest, or earlier if the announcement is released. Size and price of the raise are not yet stated.

    other

  6. 11 Nov

    CRP0032D extended Cuerpo 3 with 378m at 0.4% copper and 0.1g/t gold to end of hole, including 130m at 0.5%. The first hole below Cuerpo 2 found a 500m mineralised zone, assays pending. Company says this points to an upgrade of the 451Mt resource. Productora mine plan and permits also received.

    drilling result

  7. 12 Oct

    Maiden Cortadera resource of 451Mt at 0.46% copper equivalent, including a 104Mt at 0.74% higher grade part. This ends the long-delayed wait and lifts the combined Costa Fuego resource to 724Mt at 0.48% CuEq (2.9Mt copper, 2.7Moz gold). A second Cortadera estimate is planned for 2021.

    resource reserve update

  8. 11 Aug

    CRP0016D returned 190m at 0.6% copper and 0.2g/t gold from 392m, extending Cortadera's high grade core over about 800m vertically. CRP0042D hit 314m at 0.4% copper. Drilling moves next to Cuerpo 2; maiden resource still being finalised, with a second estimate planned for early 2021.

    drilling result

  9. 31 July

    First metallurgical tests on Cortadera and San Antonio sulphide ore gave rougher copper recoveries of 89% to over 95%, with no problem impurities. Company says Cortadera, Productora and San Antonio can be one combined development, now named Costa Fuego. Results are early-stage; concentrate grade testing is still to come.

    other

  10. 22 July

    Lease mining started at Productora's Santa Innes underground mine, four months ahead of schedule, under the June ENAMI agreement. Initial head grade targeted at 1.8% copper; revenue to Hot Chili estimated at A$1.4-1.8m a year (up from A$1.2-1.5m), with talks to expand the deal.

    production update

  11. 24 June

    The entitlement offer raised A$1.48m (37% take-up), and Veritas placed the roughly A$2.4m shortfall at 1.5c. Total raised is about A$3.9m, completing the offer. Board also approved 60m management performance rights, with price and 750Mt resource hurdles.

    capital raising announcement

  12. 2 June

    Hot Chili signed the formal two-year ENAMI agreement to lease-mine about 120,000 tonnes a year from Productora, confirming the March non-binding acceptance. It pays US$2/t plus a 10% royalty; company estimates A$1.2-1.5m a year to Hot Chili, first revenue expected Q4 2020.

    material agreement

  13. 18 May

    Entitlement offer prospectus: 3 new shares for every 20 held at 1.5c, with one free 2.5c option (expiring 20 May 2022) per two new shares, to raise up to about A$3.9m. Veritas is lead manager; offer closes 10 June 2020.

    capital raising announcement

  14. 18 May

    Hot Chili arranged a A$5m placement of 333.3m shares at 1.5c with one free 2.5c option (exp. 20 May 2022) per two shares, plus the A$3.9m rights issue at the same price. Company says this removes near-term funding uncertainty and funds the US$2m Carola fee and drilling restart.

    capital raising announcement

  15. 9 Apr

    SCM Carola agreed a 12-month extension: the US$10m Cortadera payment now falls due mid-July 2021 and US$15m mid-July 2022, in return for a US$2m fee by 15 July 2020. This defers the instalment previously due about 18 months from the MOU.

    material agreement

  16. 26 Mar

    Hot Chili accepted, non-binding, ENAMI's offer to lease-mine and process about 120,000 tonnes a year from Productora over two years, with US$2 a tonne plus a 10% royalty. Company estimates US$400-500k a year to its 80% share; formal agreement still pending.

    material agreement

  17. 20 Mar

    CRP0040D, the 100m southern step-out pending since February, returned 542m at 0.5% Cu and 0.2g/t Au from 422m, including 218m at 0.7% Cu. Drilling is suspended in Chile owing to Coronavirus; cash is over A$2m, down from A$6.4m in November.

    drilling result

2019

  1. 4 Dec

    CRP0020D, the step-out hole pending since November, returned 972m at 0.5% Cu and 0.2g/t Au from surface, including 412m at 0.7% Cu and 0.3g/t Au. The company calls it its best Cortadera result so far; first expansion hole CRP0029D is complete at 982m.

    drilling result

  2. 30 Oct

    CRP0018D returned 264m at 0.4% Cu from 52m and 150m at 0.6% Cu from 484m, including 82m at 0.8% Cu. Shallow mineralisation points to open pit potential. CRP0019D is complete and CRP0020D is underway; expansion drilling follows.

    drilling result

  3. 16 Oct

    CRP0017D final assays widened the intersection to 596m at 0.5% Cu and 0.2g/t Au from 328m, up from 350m. The US$3m Carola payment is also confirmed paid, completing the first US$5m toward 100% of Cortadera.

    drilling result

  4. 30 Sept

    CRP0017D's first assays gave 350m at 0.6% Cu and 0.2g/t Au from 344m, including 184m at 0.7% Cu, a 300m step-out from discovery hole CRP0013D. Remaining assays are pending, and a third phase 2 hole, CRP0018D, is underway.

    drilling result

  5. 23 Sept

    Hot Chili raised A$12.1m at 3.6c via placement: Tranche 1 of 325m shares (A$11.7m) and Tranche 2 of 11.1m shares to Blue Spec (A$0.4m), which needs approval at the AGM around 8 Nov. Funds cover the remaining US$3m Carola payment and 15,000m of drilling.

    capital raising announcement

  6. 12 Sept

    CRP0011D returned 848m at 0.4% Cu and 0.2g/t Au from 112m, including 184m at 0.7% Cu about 100m east of the CRP0013D high grade zone. CRP0017D hit a 440m mineralised zone (visual) and is being extended to 1,300m.

    drilling result

  7. 5 July

    Final assays extend CRP0013D to 750m at 0.6% Cu and 0.2g/t Au from 204m; the 188m at 0.9% Cu high-grade zone is unchanged. This ends phase one drilling. AMC was engaged for an initial Cortadera resource estimate, and phase two drilling is being planned.

    drilling result

  8. 2 July

    Hot Chili arranged a A$5m placement at 3c a share, cornerstoned by Taurus and Blue Spec. Proceeds fund a US$2m part-payment of the first Carola instalment plus working capital. Tranche 1 is 150m shares; Tranche 2 is 16.7m to Blue Spec, needing approval around 16 August.

    capital raising announcement

  9. 20 June

    Diamond hole CRP0013D at Cortadera returned 622m at 0.6% Cu and 0.2g/t Au from 204m, including a new high-grade zone of 188m at 0.9% Cu from 516m, the company's best result. Carola agreed a 90-day extension on US$3m of the first US$5m payment.

    drilling result

  10. 9 May

    First five shallow RC holes at Cortadera confirm near-surface copper-gold, e.g. 20m at 1.2% Cu and 0.5g/t Au from 40m, validating the earlier diamond results. Deep RC holes ended in mineralisation at ~350m and are being extended by diamond drilling.

    drilling result

  11. 11 Apr

    Drilling is underway at Cortadera: a 17-hole, ~5,000m RC programme began in early April, with five holes done showing visible copper mineralisation from surface. Sternship Advisors was appointed to run a strategic partner funding process for Cortadera's acquisition and development. Assays expected in coming weeks.

    drilling progress report

  12. 6 Mar

    The rights issue raised A$926,218, a 42% take-up of the A$2.2m, because major holders (52%) took up the placement instead. A shortfall of 129,076,160 shares (up to about A$1.29m) will be offered to investors.

    capital raising announcement

  13. 25 Feb

    The formal Cortadera Option Agreement with SCM Carola was signed 22 February 2019, resolving the open thread from the 4 February MOU. Confirmation drilling awaits regulatory approvals, and funding talks with potential partners are in technical due diligence.

    farm in farm out agreement

  14. 4 Feb

    Binding MOU with SCM Carola for an option to buy 100% of Cortadera, a copper-gold porphyry 14km from Productora. Never-released results include 864m at 0.4% copper from 62m, from 23,231m of drilling. A formal option agreement is expected within months. Funding talks under way.

    asset acquisition disposition

  15. 4 Feb

    Hot Chili arranged a A$1m placement at 1c per share plus a A$2.2m 2-for-7 rights issue at 1c, A$3.2m in total, for working capital. Funds support Cortadera drilling preparations and funding talks. The 1c price is well below the 2.3c-3c range of recent issues.

    capital raising announcement

  16. 4 Feb

    Formal option signed to buy the Purisima mining right, about 500m of the 2km Cortadera zone, for US$1.5m over three years (US$50k due by 14 February 2019), plus a 1.5% royalty. Together with the Carola MOU, this would consolidate the whole discovery.

    asset acquisition disposition

  17. 25 Jan

    Shares suspended from trading on 25 January 2019 at the company's request, pending an announcement of an acquisition. This follows a trading halt requested on 23 January. The suspension is requested until 30 January or earlier release of the news.

    other

2018

  1. 5 Sept

    First Valentina drill results: 12m at 1.5% copper from 28m and 8m at 2.0% copper from 124m, in two of three holes. This is the second El Fuego deposit with successful extensions after San Antonio, resolving the pending Valentina assays. Follow-up drilling is being planned.

    drilling result

  2. 30 Aug

    Final San Antonio assays include 9m at 2.0% copper from 132m and 16m at 1.1%, continuing grade over 700m of strike. Follow-up drilling is being planned pending approvals; Valentina results from three holes are still to come.

    drilling result

  3. 6 Aug

    More San Antonio results, including 53m at 0.9% copper from 72m (27m at 1.3%) and 18m at 1.3%. The company calls it a large extensional discovery, open at depth and along strike, over about 700m. 23 holes still pending.

    drilling result

  4. 18 July

    First San Antonio drill results confirm the Main Lode continues below the old mine: 19m at 2.0% copper from 61m, 15m at 1.7%, 13m at 1.3%. Mineralisation dips shallowly, suggesting open pit potential. 23 holes await assay; drilling has moved to Valentina.

    drilling result

  5. 7 June

    First drilling began 1 June at San Antonio, a 4,000m RC programme, with four holes done. The formal Valentina option (90% over four years) is now signed, resolving the February LOI and allowing drilling there next.

    drilling spud

  6. 30 Apr

    Placement at 3c per share, targeted at A$2.5m but accepted up to A$4.0m, with one 10c option for every two shares (expiring 31 May 2020). It resolves the SPP shortfall thread at a lower price than the 3.5c SPP. Second tranche needs shareholder approval.

    capital raising announcement

  7. 23 Apr

    Historical face sampling at San Antonio includes 7.5m at 10.4% copper. Lease miners found the main lode continuing below 90m depth. The company now sees resource potential as many multiples of the historical 2Mt at 2% copper. Mapping outlines a 6km corridor with two possible porphyry centres.

    drilling result

  8. 21 Feb

    Non-binding LOI signed to earn 90% of Valentina over four years, 20km east of Productora, a third satellite deal. San Antonio, Lulu and Valentina are grouped as the 'El Fuego' project. Historical drilling includes 11m at 2.0% copper.

    asset acquisition disposition

2017

  1. 21 Nov

    Share purchase plan closed having raised only A$1.0m (28.8m shares at 3.5c) against the A$3m target. About A$2m shortfall may be placed to sophisticated investors on the same terms.

    capital raising announcement

  2. 8 Nov

    Formal agreement signed to earn 90% of San Antonio over four years, converting the August LOI. Historical mine output was about 2Mt at 2% copper. First drilling in 20 years planned early 2018. Hot Chili can exit at any time and will exercise only on exploration success.

    farm in farm out agreement

  3. 7 Nov

    Formal agreement signed to earn 70% of Lulu over four years, turning the September non-binding LOI binding. Payments total US$2.45m, with US$75k paid on 3 November and US$2m due at 48 months. Owner can mine up to 50,000t a year for 36 months.

    farm in farm out agreement

  4. 31 Oct

    Hot Chili launched a share purchase plan for up to about A$3m, offering up to 85.7m shares at 3.5c, a 9.2% discount, with a A$15,000 cap per holder. Funds go to working capital and drilling San Antonio and Lulu; any shortfall goes to sophisticated investors.

    capital raising announcement

  5. 5 Sept

    Hot Chili signed a second non-binding letter of intent, to earn 70% of the Lulu copper-gold project, 30km west of Productora, a week after San Antonio. It extends a historic mine reportedly averaging 6% copper and 3g/t gold; it has never been drill tested.

    asset acquisition disposition

  6. 30 Aug

    Hot Chili signed a non-binding letter of intent to earn 90% of the San Antonio copper-gold project, 20km from Productora, with a historic mine that produced about 2Mt at 2% copper. Payments of US$300,000 in 36 months and US$6.7m in 48 months. Opens a high-grade satellite strategy.

    asset acquisition disposition

  7. 25 July

    The US$6.5m Sprott loan is fully repaid and all security discharged, leaving the company debt free. First-phase porphyry drilling is complete (about 9,000m RC, 1,200m diamond); Blue Spec's free drilling has ended, and it offers up to US$1m of shares for further drilling, needing shareholder approval.

    debt financing

  8. 21 June

    Hot Chili closed a A$11.3m convertible note placement, below the up-to-A$13m planned, approved by shareholders on 6 June. A$10.92m was received for 109,175 notes at 3.333c conversion; CAP did not take part. Sprott loan repayment began; diamond drilling is underway.

    capital raising announcement

  9. 27 Apr

    First porphyry RC result: 64m at 0.5% copper, 0.1g/t gold and 185ppm molybdenum from 200m in an extended Alice hole, ending in mineralisation. Suggests Alice extends east and may join the Main Zone. Blue Spec will also fund diamond drilling at no cost.

    drilling result

  10. 24 Mar

    RC drilling began at Productora on several large porphyry copper targets west of the existing resource. Blue Spec Sondajes Chile, associated with Chairman Murray Black, is drilling at its own risk and no cost to Hot Chili. This starts the long-planned porphyry test.

    drilling spud

  11. 24 Mar

    Hot Chili arranged up to A$13m of unsecured convertible notes led by Sprott, with Taurus and CAP taking up to A$4.5m. 5-year, 8% coupon, conversion at 3.333c. Proceeds repay the US$6.5m Sprott loan and fund exploration. Needs shareholder approval; Sprott gets a board seat.

    capital raising announcement

2016

  1. 27 Oct

    September quarter: first-phase Sierra Zapallo RC drilling (15 holes, 1,968m, 3 of 13 reefs) hit reefs but best result was 1m at 3.2g/t gold, failing to extend surface high grades. This disappoints the gold hopes; more work needed before further drilling. Company turns to porphyry copper drill preparations.

    quarterly activities report

  2. 15 Sept

    Final surface sampling across 8 reefs averaged 8.1g/t gold uncut, above the earlier 6.7g/t. All regulatory approvals are in place and the first gold-focussed RC drilling at Sierra Zapallo starts within the week. This resolves the approvals thread.

    drilling scheduled

  3. 24 Aug

    Full surface program across 13 Sierra Zapallo reefs: average 286m strike, 1.1m width, 6.6g/t gold uncut (6.0g/t with 30g/t top cut). Company sees potential for one open pit covering at least 10 reefs. Drill approvals are progressing; no resource estimated yet.

    drilling result

  4. 12 Aug

    First Sierra Zapallo surface channel samples returned up to 30.5g/t gold, with 2012 drill pulp re-assays giving 4m at 8.3g/t. Drill planning has begun and approvals are being prepared. Early results support the gold target; no resource yet.

    drilling result

  5. 8 July

    CMP completed its purchase of a further 2.5% of Productora for US$1.5m, taking it from 17.5% to 20%. Hot Chili paid US$3m to Sprott on 30 June, cutting the loan to US$6.5m, and extended it to 30 June 2017. Option amendments with CMP are still being negotiated.

    asset acquisition disposition

  6. 8 July

    Raised A$4.4m at an average 5c a share, a 10.7% discount to the 5.6c close, after demand beat the A$2.5m target. Funds will assess the Sierra Zapallo high-grade gold deposit at Productora and provide working capital. Lower than the 7c raising in February.

    capital raising announcement

  7. 18 May

    Hot Chili agreed to sell CMP a further 2.5% of Productora for US$1.5m, lifting CMP from 17.5% to 20%, subject to CMP board approval. Proceeds go to the Sprott loan, and Sprott agreed terms to extend it 12 months from 30 June 2016.

    asset acquisition disposition

  8. 2 Mar

    PFS completed for Productora: Ore Reserve near doubled to 166.9Mt and resource rose to 1.47Mt copper and 0.98Moz gold. 10-year mine life, 66kt copper a year for 8 years, US$725m pre-production capital, post-tax NPV US$220m, 15% IRR. Resolves the long-awaited PFS and Alice resource.

    resource reserve update

  9. 1 Feb

    Raising A$1.6m at 7c a share from Taurus and CAP (CMP's parent), in line with the 7.2c close on 22 January. Funds are for working capital including completing the Productora PFS. This is far lower than the 12c raising in June 2015.

    capital raising announcement

2015

  1. 16 Oct

    Hot Chili and partner CMP signed a non-binding letter of intent to eventually form a joint venture over Frontera, 50km south of Productora. Frontera holds a 50.5Mt resource (187,000t copper). Formal terms are still to be negotiated and need board approval.

    material agreement

  2. 12 Oct

    A geophysical (IP/MT) survey identified four large 'Alice look-alike' copper porphyry targets alongside the Productora Main Zone, likely sources of the +6.5km porphyry footprint. Company says they could lift the 1Mt copper inventory; drilling is being planned, with results going into next year's DFS.

    drilling result

  3. 13 July

    Recent Alice drilling included 129m at 0.6% copper from 188m, including 8m at 1.2%. Company says results point to a significant maiden Alice resource. Exploration drilling over the +6km porphyry footprint starts next week, with an IP and MT survey to follow.

    drilling result

  4. 15 June

    Raised A$8.1m at 12c a share from major shareholders including CAP, Taurus and Sprott affiliates. A$2.6m from a company linked to Chairman Murray Black needs shareholder approval. Sprott facility stays at US$10m drawn, repayment extended to 30 June 2016; the undrawn US$8.5m will not be needed.

    capital raising announcement

  5. 28 May

    Drilling has started on a 9,000m program (about 8,000m RC, 1,000m diamond) at the Alice porphyry, 400m west of the planned central pit. Results are meant to support a first Alice resource and reserve for the Productora PFS, due second half 2015.

    drilling spud

  6. 30 Apr

    March quarter report: shareholders approved the CMP transaction at the 30 April general meeting, resolving that open thread. Also recaps Alice, the oxide scoping study and the port access MOU. Legal documents and PFS still ahead.

    quarterly activities report

  7. 19 Mar

    General meeting set for 30 April 2015 to vote on the CMP deal. Independent expert BDO calls it 'not fair but reasonable' and values Productora at A$245-297m against Hot Chili's market cap of about A$42m. Directors recommend it, except the CAP-linked director who abstained.

    material agreement

  8. 19 Feb

    Scoping study found Productora's oxide copper (25.6Mt at 0.52%) suits heap leaching, potentially 8,000-10,000t a year of copper cathode for 6-8 years. The PFS is expanded to include it. Preliminary study; company expects a resource and reserve upgrade this year.

    other

  9. 29 Jan

    Hot Chili and CMP boards ratified the MOU: CMP gets 17.5% of Productora, plus an option on 32.6% more for US$80m-110m, now in two tranches. First tranche US$26m is to repay Sprott and fund the DFS. Still needs shareholder approval.

    material agreement

  10. 22 Jan

    New Alice holes include 204m at 0.6% copper from 33m, within 237m at 0.5% from surface. Company says this confirms Alice is a porphyry-style deposit, still open west and at depth. A maiden Alice resource estimate is planned and will feed the Productora PFS.

    drilling result

2014

  1. 21 Nov

    Second Alice hole, 200m south, hit 26m at 0.7% copper and 105m at 0.4% copper. Company says features suggest porphyry-style mineralisation, which is unconfirmed. Builds on the 7 November discovery; more drilling continues.

    drilling result

  2. 7 Nov

    Alice discovery 400m west of the planned Productora central pit: hole PRP0851 returned 151m at 0.4% copper from 116m, including 54m at 0.5%. First significant mineralisation outside the main zone; follow-up assays pending, so significance is unconfirmed.

    drilling result

  3. 6 Aug

    Signed binding MOU giving CMP a 17.5% stake in Productora for surface rights, easements and its 35% lease interest, free-carried to PFS. CMP also gets an option on a further 32.6% for at least US$80m. Resolves the pending CMP deal; needs CMP board and HCH shareholder approval.

    material agreement

  4. 11 July

    Received about US$8.7m VAT refund from the Chilean tax authority. With the Sprott draw, cash is about A$22m. It must be repaid if export targets from Productora are not met by 31 December 2019, unless extended. Talks with Sprott about the funds continue.

    other

  5. 30 June

    Credit agreement signed for the US$25m Sprott facility at 12% interest, with US$10m drawn. Fee options are now 11m at 30c, down from 40c in the term sheet. Remaining US$15m depends on more security and the CMP agreement. Repayable if control changes.

    debt financing

  6. 14 May

    Signed a term sheet with Sprott for a US$25m secured loan over 12 months, to fund the Productora pre-feasibility study and drilling. Fees include 11m options at 40c. It is conditional, with first drawdown targeted around 30 June 2014.

    debt financing

  7. 31 Mar

    Maiden Productora ore reserve of 90.5Mt at 0.48% copper (433,000t copper), supporting a 9-year mine life. Resource is upgraded to 214.3Mt for 1.01Mt copper. This resolves the long-awaited revision; the decision to mine is now targeted for late 2015, later than the 2014 earlier stated.

    resource reserve update

  8. 11 Mar

    Maiden Frontera resource of 50.5Mt at 0.4% copper and 0.2g/t gold, for 187,000t copper and 356,000oz gold, 33% indicated. This resolves the pending Frontera estimate and lifts combined inventory with Productora to 1.1Mt copper. The Productora reserve is due this month.

    resource reserve update

  9. 3 Feb

    A second large copper-gold zone, Rocoto, found below the planned central pit, including 97m at 0.6% copper. Found with the same targeting method as Habanero. Maiden Productora reserve and resource revision now expected in Q1 2014; a 35,000m drilling program is planned for 2014.

    drilling result

2013

  1. 8 Oct

    Habanero, a new east-dipping zone in ground previously treated as waste, returned 181m at 1.0% copper including 71m at 1.6% copper, the highest grades at Productora so far. Two rigs are redirected to follow up, and it is expected to feature in the resource upgrade.

    drilling result

  2. 6 Sept

    Second tranche of the A$11.7m placement closed: 22.13m shares issued for about A$9.9m, strongly backed by CAP. This completes the July raising at 45c and funds Productora work; CMP infrastructure talks are described as progressing well.

    capital raising announcement

  3. 10 July

    Placement of about A$11.7m at 45c a share, below the 50c of the earlier raising, led by CAP with Sprott affiliates; UBS is lead manager. A$1.8m (4m shares) is immediate; A$9.9m (22.13m shares) needs shareholder approval. CAP's Roberto de Andraca joins the board.

    capital raising announcement

  4. 12 June

    Signed a non-binding letter of intent with state miner ENAMI to negotiate processing Productora's ~14.1Mt oxide ore at ENAMI's Vallenar plant. Oxide was excluded from the pre-feasibility study; it could cut start-up capital and strip ratio, but nothing is binding yet.

    material agreement

  5. 24 Apr

    First drilling at Frontera, the 70km-south project, hit wide copper-gold intersections including 256m at 0.5% copper and 0.3g/t gold. The company calls it a major porphyry discovery and a second project for its Chile hub. Further results from 29 holes are due.

    drilling result

  6. 21 Feb

    Hot Chili exercised its option to take 100% of the Productora central lease, which holds about 85Mt of the 165Mt resource and lies within the planned central pit. The company calls it its last major Productora commitment. Completes the planned lease purchase.

    asset acquisition disposition

  7. 13 Feb

    First major Productora upgrade near doubles the resource to 165.2Mt at 0.6% copper, containing 920,000t copper and 590,000oz gold, from 85.1Mt in 2011. High-grade shallow material is 53Mt at 0.8% copper. Delivers the early-2013 upgrade; 57% is still Inferred.

    resource reserve update

  8. 13 Feb

    Board approved the Productora pre-feasibility study, with Ausenco as manager, after a scoping study estimating C1 costs of US$1.20-1.50/lb and capex of $500-700M for an ~11Mt/yr operation. A decision to mine is targeted for 2014. Environmental studies started in January.

    material agreement

  9. 21 Jan

    Geoff Laing, a mining engineer and former Exco Resources managing director, joined the board as an executive director to run Productora development. Further management additions are expected. The first major resource upgrade is expected in the coming weeks.

    director officer appointment

2012

  1. 21 Nov

    Hot Chili plans a roughly A$4m placement to CAP, parent of partner CMP, at 50c (8.09m shares) with free 75c options, lifting CAP's stake from 3.5% to over 5%. It needs CAP board approval on 7 December. Total cash is expected to exceed A$45m after all raisings.

    capital raising announcement

  2. 14 Nov

    Hot Chili signed a farm-in with a CODELCO subsidiary to earn up to 60% of an extra 10,000ha at Los Mantos over six years, next to Teck's Andacolla operation. It paid US$50,000 and commits at least US$2m spend in five years. Second CODELCO deal.

    farm in farm out agreement

  3. 16 Oct

    Hot Chili arranged a A$35.5m raise at 50c a share: A$32.5m placement in two tranches plus a A$3m share purchase plan, with one free 75c option per two shares. Taurus, Sprott affiliates and Lundin Mining anchor A$17.5m. Cash was about A$10.8m beforehand; second tranche needs shareholder approval.

    capital raising announcement

  4. 25 Sept

    A new high-grade copper-gold zone was found in northern Productora, including 7m at 5.0% copper and 1.4g/t gold within 45m at 1.9% copper equivalent. The company interprets it as a high-grade shoot, open over 160m; follow-up drilling is planned. The first result of this grade at Productora.

    drilling result

  5. 20 Sept

    First drilling on the new central lease returned the best Productora results yet, including 196m at 0.9% copper equivalent from 40m and 126m at 0.9%. Company expects a major effect on the resource upgrade, now due in the December quarter, and open pit economics.

    drilling result

  6. 27 Aug

    The formal 30-year Uranio lease agreement is signed and drilling there has begun, with seven holes done showing wide shallow visual copper (no assays yet). The resource upgrade is now slated for the December quarter, slipping from the September target; remaining results due early October.

    drilling progress report

  7. 18 July

    Hot Chili won a public auction for the Uranio 1 to 70 lease, a 1.2km piece in the centre of Productora, completing four years of land consolidation. Terms: 30-year lease, minimum US$6m exploration spend, US$100,000 yearly rent, 2% NSR on non-gold metals. Contract still being prepared.

    material agreement

  8. 10 July

    Hot Chili agreed options to earn 100% and 65% of the 7,156ha Banderas project (50km north of Productora) and 100% of the 270ha Frontera project (70km south). Frontera cost US$600,000 upfront, with US$300,000 and US$5m to follow, plus 10,000m of drilling. Adds to the Los Mantos and Chile Norte pipeline.

    asset acquisition disposition

  9. 3 July

    Hot Chili signed two non-binding letters of intent with partner CMP, to negotiate shared infrastructure (rail, port, easements) for Productora and cooperate on assessing its iron potential. Non-binding, so no terms are fixed; resource upgrade and scoping study due in September.

    material agreement

  10. 14 May

    First metallurgical tests show Productora ore suits conventional grinding and flotation, with rougher copper recoveries of 93.5% to 96%. First-pass drilling over the full 9.5km is complete with results pending; cash about $24m; scoping study and resource upgrade still due Q3 2012.

    drilling result

  11. 13 Apr

    Hot Chili agreed to let lease miner Playa Brava mine a new 250,000t underground area at Productora, giving the company access to compare mined grade with the resource. New diamond holes (70m at 0.9% copper equivalent) again suggest the inferred part's grade was underestimated.

    material agreement

  12. 8 Feb

    New drilling extended Productora's drill-confirmed mineralisation by 2km, from 3.7km to 5.7km, with northern results such as 32m at 0.6% copper equivalent. A diamond extension of a southern hole also returned 47m at 0.7% copper equivalent. First-pass drilling continued over the 9.5km footprint, with a resource upgrade targeted for Q3 2012.

    drilling result

  13. 30 Jan

    New Productora diamond holes, including 63m at 0.8% copper equivalent, suggest the grade of the first resource's inferred part may have been underestimated. A revision is planned with a major resource upgrade in the third quarter of 2012; a third rig is coming.

    drilling result

  14. 12 Jan

    Ausenco was appointed to run the Productora scoping study, due in the third quarter of 2012, alongside a 70,000m drilling programme. Company targets a decision to mine by late December 2013 and a 280-320Mt exploration target (conceptual, not a resource).

    contract award

2011

  1. 14 Dec

    Hot Chili raised $22.3m at 60c (about 37.1m shares) with one free 75c one-year option per three shares, backed by four top-five holders ($16.85m). Tranche 2 needs shareholder approval around 1 February 2012. Taurus's Michael Anderson joined the board.

    capital raising announcement

  2. 1 Dec

    Final Los Mantos first-pass assays include the widest intercept yet, 36m at 1.4% copper and 0.2g/t gold from 49m, suggesting bulk-tonnage potential. This completes the pending first-pass results; modelling and second-pass drilling are planned for 2012, with Productora the priority.

    drilling result

  3. 6 Sept

    First Productora resource: 85.1Mt at 0.6% copper, 0.1g/t gold, containing 483,000t copper and 290,000oz gold; 37% Indicated, 63% Inferred. It covers only the central 1.4km, excludes the underground mine; a 55,000m RC and 8,000m diamond programme has begun.

    resource reserve update

  4. 26 July

    Hot Chili raised $8m at 60c from cornerstone investors Panoramic Resources and Taurus, each taking 6,666,667 shares (4.1%). Panoramic's tranche is issued; Taurus's follows by 12 August. Drilling is paused for resource estimation, with a Los Mantos second-pass 15,000m programme being designed.

    capital raising announcement

  5. 30 May

    Hot Chili raised $3.65m via a placement of 6,083,361 shares at 60c, led by DJ Carmichael, to fund extra Productora resource drilling. First Productora resource is now targeted before early September 2011; three more diamond rigs mobilised.

    capital raising announcement

  6. 13 May

    First-ever Los Mantos drilling hit shallow copper in 18 of the first 21 holes over 1.5km, e.g. 8m at 2.1% copper and 26m at 1.0% copper equivalent. Results for 29 more holes are pending, and second-pass drilling is being planned.

    drilling result

  7. 11 May

    Productora in-fill drilling found two more new zones, making three beyond the main breccia; best result 67m at 1.2% copper equivalent. About 6,000m RC and 2,000m diamond are done. Maiden Los Mantos results are due shortly.

    drilling result

  8. 17 Mar

    Resource drilling at Productora found a new wide zone, with 56m at 1.0% copper equivalent ending in mineralisation, possibly adding to the first resource. Diamond drilling is doubled to 6,000m. First-pass drilling at Los Mantos has begun, the first ever drilling there.

    drilling result

  9. 2 Feb

    Extensional Productora holes hit mineralisation north and south of the central area, e.g. 53m at 1.1% copper equivalent, extending the zone to at least 2.5km. First-pass 16,000m programme is nearly finished; resource in-fill drilling follows, targeting a preliminary resource by late Q2 2011.

    drilling result

2010

  1. 23 Nov

    First Productora central-area assays are the company's best to date: 116m at 0.92% copper equivalent, with 12 of 13 holes significant. The mineralised breccia extends at least 800m beyond the mine boundary. About 40% of the maiden programme is done.

    drilling result

  2. 4 Nov

    Placement of 18.6 million new shares at 25c raised $4.65 million, led by DJ Carmichael, within the 15% limit. Funds are for faster drilling and possible Chile acquisitions. The company aims to report preliminary resources by mid-2011.

    capital raising announcement

  3. 23 Aug

    Maiden drilling began at Productora, first hole started 16 August 2010, within a planned 26,000m programme across Productora and Los Mantos. Stage 1 is about 9,000m at Productora, then 3,000m at Los Mantos. Airborne surveys over all three projects are complete.

    drilling spud

  4. 18 Aug

    Hot Chili acquired 4 new land concessions along strike from Productora via Chilean auctions, lengthening the project's strike by 2.5km (20%). The company aims for about 18-20,000m of drilling in two campaigns over the next 6-8 months.

    asset acquisition disposition

  5. 11 Mar

    Prospectus for Hot Chili's IPO: 30,000,000 shares at 20 cents to raise $6 million, with over-subscriptions of up to a further 10,000,000 shares ($2 million). Lead manager is D.J. Carmichael; ASX trading was expected from 27 April 2010.

    capital raising announcement