Each one in plain English, with the numbers worked through for a shareholder.
20 June 2019drilling result▲ GoodMajor
Diamond hole CRP0013D at Cortadera returned 622m at 0.6% Cu and 0.2g/t Au from 204m, including a new high-grade zone of 188m at 0.9% Cu from 516m, the company's best result. Carola agreed a 90-day extension on US$3m of the first US$5m payment.
Newly obtained historical data, including a ground magnetic survey and logs for all 23,231m of old drilling, points to a fourth porphyry at Cortadera and a larger system of ~3km by 4km. The second diamond hole was at 1,040m.
First diamond hole at Cortadera (CRP0012D) found the main porphyry extends north, with ~300m of width not closed off. A second hole was at 840m depth and being extended to 1,000m as mineralisation intensifies. Assays are due within a fortnight.
First five shallow RC holes at Cortadera confirm near-surface copper-gold, e.g. 20m at 1.2% Cu and 0.5g/t Au from 40m, validating the earlier diamond results. Deep RC holes ended in mineralisation at ~350m and are being extended by diamond drilling.
Drilling is underway at Cortadera: a 17-hole, ~5,000m RC programme began in early April, with five holes done showing visible copper mineralisation from surface. Sternship Advisors was appointed to run a strategic partner funding process for Cortadera's acquisition and development. Assays expected in coming weeks.
The formal Cortadera Option Agreement with SCM Carola was signed 22 February 2019, resolving the open thread from the 4 February MOU. Confirmation drilling awaits regulatory approvals, and funding talks with potential partners are in technical due diligence.
Annual review of resources and reserves as at 30 June 2018 reports no material changes. Productora's 236.6Mt high grade resource (1.13Mt copper, 730koz gold) and 2016 reserve stand unchanged. San Antonio and Valentina are not included.
First Valentina drill results: 12m at 1.5% copper from 28m and 8m at 2.0% copper from 124m, in two of three holes. This is the second El Fuego deposit with successful extensions after San Antonio, resolving the pending Valentina assays. Follow-up drilling is being planned.
Final San Antonio assays include 9m at 2.0% copper from 132m and 16m at 1.1%, continuing grade over 700m of strike. Follow-up drilling is being planned pending approvals; Valentina results from three holes are still to come.
More San Antonio results, including 53m at 0.9% copper from 72m (27m at 1.3%) and 18m at 1.3%. The company calls it a large extensional discovery, open at depth and along strike, over about 700m. 23 holes still pending.
First San Antonio drill results confirm the Main Lode continues below the old mine: 19m at 2.0% copper from 61m, 15m at 1.7%, 13m at 1.3%. Mineralisation dips shallowly, suggesting open pit potential. 23 holes await assay; drilling has moved to Valentina.
Mapping south of San Antonio confirms multiple targets, with rock chips up to 6.5% copper, and a San Antonio East zone at least 600m long. 18 holes (about 2,280m) are drilled; first assays are due shortly. No drill assays yet.
First drilling began 1 June at San Antonio, a 4,000m RC programme, with four holes done. The formal Valentina option (90% over four years) is now signed, resolving the February LOI and allowing drilling there next.
Historical face sampling at San Antonio includes 7.5m at 10.4% copper. Lease miners found the main lode continuing below 90m depth. The company now sees resource potential as many multiples of the historical 2Mt at 2% copper. Mapping outlines a 6km corridor with two possible porphyry centres.
Newly received historical underground data shows San Antonio drill intercepts such as 14m at 3.1% copper (including 5m at 5.5%) and 12m at 2.9%, open and untested. Surface mineralisation now spans 1.5km. Lease miners also report a second parcel of 15.02t at 3.68% copper.
Technical due diligence on Valentina is positive: 1997 certified production averaged 4.0% copper, with 700m of mapped strike. Historical hole 11m at 2.0% copper is unfollowed. Formal 90% agreement awaits legal due diligence, continuing the February non-binding LOI.
Lease miners at San Antonio report ore parcels of 2.1% to 4.3% copper (3.1% weighted average) from a 20m wide shallow zone, delivered Nov 2017 to Feb 2018. Infill soil results show large copper anomalies south of the mine. Drilling still pending.
Lease miners report a 16.3t ore parcel at 5.24% copper from 300m south of the San Antonio mine, suggesting high grade over 1km of strike. Surface chips reach 4.43% copper. Results are miner-reported, and drilling is still pending.
Surface sampling at Lulu returned up to 2.8% copper and 3.9g/t gold, confirming an 800m outcropping extension of the historical high-grade mine. Never drilled; more sampling planned in the new year to prioritise drill targets for 2018.
Surface sampling at San Antonio confirmed a 'Parallel Lode' with rock chips up to 2.0% copper, up-dip of a historical 20m at 1.0% copper hole. Project size doubled through new lease applications; first drilling still planned early 2018.
Formal agreement signed to earn 90% of San Antonio over four years, converting the August LOI. Historical mine output was about 2Mt at 2% copper. First drilling in 20 years planned early 2018. Hot Chili can exit at any time and will exercise only on exploration success.
Formal agreement signed to earn 70% of Lulu over four years, turning the September non-binding LOI binding. Payments total US$2.45m, with US$75k paid on 3 November and US$2m due at 48 months. Owner can mine up to 50,000t a year for 36 months.
Annual resource and reserve review as at 30 June 2017 reports no material changes. Productora's 236.6Mt high-grade resource and 166.9Mt ore reserve from March 2016 stand unchanged.
First porphyry RC result: 64m at 0.5% copper, 0.1g/t gold and 185ppm molybdenum from 200m in an extended Alice hole, ending in mineralisation. Suggests Alice extends east and may join the Main Zone. Blue Spec will also fund diamond drilling at no cost.
RC drilling began at Productora on several large porphyry copper targets west of the existing resource. Blue Spec Sondajes Chile, associated with Chairman Murray Black, is drilling at its own risk and no cost to Hot Chili. This starts the long-planned porphyry test.
Annual review of resources and reserves at 30 June 2016 reflects the March 2016 Productora update: total resource 236.6Mt, 1.13Mt copper and 730koz gold, including the new Alice deposit. No changes since year end; CMP's stake change does not affect estimates.
Final surface sampling across 8 reefs averaged 8.1g/t gold uncut, above the earlier 6.7g/t. All regulatory approvals are in place and the first gold-focussed RC drilling at Sierra Zapallo starts within the week. This resolves the approvals thread.
Full surface program across 13 Sierra Zapallo reefs: average 286m strike, 1.1m width, 6.6g/t gold uncut (6.0g/t with 30g/t top cut). Company sees potential for one open pit covering at least 10 reefs. Drill approvals are progressing; no resource estimated yet.
More Sierra Zapallo surface results, up to 74.3g/t gold, from 101 of 247 samples collected. The first six reefs sampled average over 5g/t gold across substantial strike lengths. Drilling awaits all results and approvals.
First Sierra Zapallo surface channel samples returned up to 30.5g/t gold, with 2012 drill pulp re-assays giving 4m at 8.3g/t. Drill planning has begun and approvals are being prepared. Early results support the gold target; no resource yet.