Each one in plain English, with the numbers worked through for a shareholder.
17 Mar 2011drilling result▲ GoodMajor
Resource drilling at Productora found a new wide zone, with 56m at 1.0% copper equivalent ending in mineralisation, possibly adding to the first resource. Diamond drilling is doubled to 6,000m. First-pass drilling at Los Mantos has begun, the first ever drilling there.
Interim accounts to 31 December 2010, largely repeating operations already reported: 47 RC holes (9,200m) at Productora and 1,200 ha of extra land. The extracted text does not show the financial figures.
Further central Productora results, including 86m at 0.8% copper equivalent, bring significant intersections to 22 of 23 central holes. Resource diamond drilling has started, with five rigs due shortly. Los Mantos drilling is scheduled within a fortnight.
Extensional Productora holes hit mineralisation north and south of the central area, e.g. 53m at 1.1% copper equivalent, extending the zone to at least 2.5km. First-pass 16,000m programme is nearly finished; resource in-fill drilling follows, targeting a preliminary resource by late Q2 2011.
December quarter report: 47 RC holes (9,200m) done at Productora, with 2,900 ha of extra land added at Productora and Chile Norte. A 7,000m RC and 3,000m diamond in-fill programme is to start, aiming for a preliminary resource in Q2 2011. Los Mantos drilling due shortly.
Board adopted a Securities Dealing Policy on 30 December 2010, setting rules on insider trading and closed trading periods for directors and staff. Administrative; no operational or financial news.
Notice pointing shareholders to a DJ Carmichael research note, written after its analyst visited Productora and Los Mantos. No new company information. DJ Carmichael is the lead manager on the placement.
5,840,000 shares will be released from escrow on 8 January 2011. They relate to the 14,000,000 shares issued on 8 January 2010; promoter and vendor shares stay restricted.
Four more shallow central Productora holes all hit significant mineralisation, e.g. 77m at 1.0% copper equivalent. That makes 16 significant intersections from 17 holes over a 1.4km central strike. Deeper holes and a diamond rig are being arranged.
December presentation recapping the progress since the IPO, the first drill results and the second rig. It repeats previously announced facts, with no new results.
A second RC rig started at Productora on 25 November, to speed the 26,000m programme. The first rig, with about 8,000m drilled, will move to Los Mantos. The company targets preliminary resources in Q2 2011.
First Productora central-area assays are the company's best to date: 116m at 0.92% copper equivalent, with 12 of 13 holes significant. The mineralised breccia extends at least 800m beyond the mine boundary. About 40% of the maiden programme is done.
Completion of the $4.65 million placement: funds received and issue of 18.6 million shares at 25c began. Confirms the 4 November raising; money is directed to faster drilling and acquisitions.
What it means for a shareholder
18.6m new shares at $0.250 to raise about $4.7m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Placement of 18.6 million new shares at 25c raised $4.65 million, led by DJ Carmichael, within the 15% limit. Funds are for faster drilling and possible Chile acquisitions. The company aims to report preliminary resources by mid-2011.
What it means for a shareholder
18.6m new shares at $0.250 to raise about $4.7m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
September quarter report: 13 RC holes (2,830m) completed at Productora, year-1 earn-in commitment to CMP met, and the airborne survey finished. Los Mantos is now a 10,000m programme planned for late 2010. Productora programme is described as about 16,000m.
Notice that a video of the managing director's 29 September conference presentation is available online. It restates the 26,000m drilling programme underway. No new information.
Addendum to the annual report adding a competent person's statement and confirming funds were used consistently with the prospectus. Administrative only, with no new results or figures.
Conference presentation repeating known project facts. It includes a conceptual exploration target for Productora and Los Mantos of 86-110 million tonnes, with 1.0-2.2 million tonnes of copper metal. It is explicitly not a JORC-compliant resource.
First annual report since the May 2010 ASX listing. The chairman says maiden drilling has started at Productora and Los Mantos is the second advanced project. The text shown carries no new financial figures or results.
Maiden drilling began at Productora, first hole started 16 August 2010, within a planned 26,000m programme across Productora and Los Mantos. Stage 1 is about 9,000m at Productora, then 3,000m at Los Mantos. Airborne surveys over all three projects are complete.
18 Aug 2010asset acquisition disposition▲ GoodMajor
Hot Chili acquired 4 new land concessions along strike from Productora via Chilean auctions, lengthening the project's strike by 2.5km (20%). The company aims for about 18-20,000m of drilling in two campaigns over the next 6-8 months.
June 2010 quarter report: the IPO raised $8 million after closing early and oversubscribed, with ASX listing on 3 May. Surface work was completed at Productora and Los Mantos; a 66-hole, 16,000m Productora drilling programme is designed, awaiting approvals.
Dr Allan Trench was appointed non-executive director, replacing Roland Mountford, who resigned from the board on 19 July 2010 and stays on as a consultant. Trench has geology and mining strategy experience.
Surface mapping and sampling at Los Mantos confirmed copper-gold mineralisation over 2.5km of cumulative strike, with uranium and molybdenum increasing with depth. Best rock chip was 17.29% copper. The project has not yet been drilled.
Hot Chili noted Chilean press reports that CODELCO and the nuclear commission are studying uranium as a by-product of copper, with a pilot plant due September 2010. It says this encourages its own plans; its Chile Norte partnership is not part of that work.
Surface sampling at Productora found a radiometric footprint over 4km long, with rock chips up to 8.39% copper, 802ppm uranium and 15.8g/t gold. This is surface work only, used to design the planned maiden drilling, still awaiting approvals.
John Sendziuk, a former RSM Bird Cameron accountant, was appointed Company Secretary. Administrative appointment, freeing the board to focus on strategy and operations.
Exploration work began at the Productora and Los Mantos projects, ahead of a planned maiden 25,000m drilling programme. About 5,000m is confirmatory and 20,000m is definition drilling; drilling applications are submitted but not yet approved.
Distribution schedule showing 503 holders and 124,210,527 shares on issue, matching the maximum IPO subscription. About 80% of shares are held in Western Australia. Administrative listing document.