Each one in plain English, with the numbers worked through for a shareholder.
31 Jan 2012quarterly activities report● Neutral
December quarter report recaps the $22.3m placement, the 70,000m second-phase Productora drilling and the Los Mantos 36m at 1.4% copper result. Mentions a late December 2013 decision-to-mine target. No new results.
New Productora diamond holes, including 63m at 0.8% copper equivalent, suggest the grade of the first resource's inferred part may have been underestimated. A revision is planned with a major resource upgrade in the third quarter of 2012; a third rig is coming.
Ausenco was appointed to run the Productora scoping study, due in the third quarter of 2012, alongside a 70,000m drilling programme. Company targets a decision to mine by late December 2013 and a 280-320Mt exploration target (conceptual, not a resource).
First tranche of the $22.3m placement closed: 9,015,668 shares and 3,005,226 options issued for about $5.4m. The remaining shares and options await shareholder approval at a meeting expected 1 February 2012.
14 Dec 2011capital raising announcement▲ GoodMajor
Hot Chili raised $22.3m at 60c (about 37.1m shares) with one free 75c one-year option per three shares, backed by four top-five holders ($16.85m). Tranche 2 needs shareholder approval around 1 February 2012. Taurus's Michael Anderson joined the board.
What it means for a shareholder
37.1m new shares at about $0.6011 to raise about $22.3m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Final Los Mantos first-pass assays include the widest intercept yet, 36m at 1.4% copper and 0.2g/t gold from 49m, suggesting bulk-tonnage potential. This completes the pending first-pass results; modelling and second-pass drilling are planned for 2012, with Productora the priority.
Second-phase drilling at Productora has two rigs running since October; visual copper in northern holes extends the mineralised breccia to 4.5km (about 800m more). A planning workshop found no fatal flaws and early benchmarking indicates robust open-pit economics. Assay results are still pending.
Amended re-release of the 28 November Productora drilling and development update; the visible text is essentially identical, with the resource figure corrected to 85.1Mt. No new information.
AGM presentation recaps the 85.1Mt Productora resource, the 12.5km land position, the US$7m central lease option, and states economic studies have commenced. Largely repeats known facts; no new results or figures.
September quarter report recaps the first Productora resource (85.1Mt at 0.6% copper, 483,000t copper) and the completed $8m Panoramic/Taurus placement at 60c. A second-phase drilling programme began in early September; scoping studies are expected to start early 2012. No new results.
Correction to the annual report adding a required listing-rule statement that cash and assets held at listing were used consistently with the 2010 prospectus objectives. Administrative only.
2011 annual report with chairman's letter and operations review, recapping the year's drilling and the transition toward project development. Text shown is largely recap of known events; financial figures not visible in the extract.
'Productora Rising' presentation recapping the 85.1Mt first resource and projects. Shows 162.4m shares on issue, 40.6m options and cash of $11m (Aug 2011). Largely repeats known facts; mentions a US$7m option to buy the central lease.
First Productora resource: 85.1Mt at 0.6% copper, 0.1g/t gold, containing 483,000t copper and 290,000oz gold; 37% Indicated, 63% Inferred. It covers only the central 1.4km, excludes the underground mine; a 55,000m RC and 8,000m diamond programme has begun.
The $8m cornerstone placement closed, with Taurus's 6,666,667 shares at 60c issued after receipt of its $4m. Completes the Panoramic and Taurus raising announced in July.
What it means for a shareholder
6.7m new shares at $0.600 to raise about $4.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
June quarter report: Productora resource estimation is on track for early September, with final drilling finishing. It recaps Los Mantos first-pass drilling completion and the $3.65m raising. No new results beyond those previously released.
26 July 2011capital raising announcement▲ GoodMajor
Hot Chili raised $8m at 60c from cornerstone investors Panoramic Resources and Taurus, each taking 6,666,667 shares (4.1%). Panoramic's tranche is issued; Taurus's follows by 12 August. Drilling is paused for resource estimation, with a Los Mantos second-pass 15,000m programme being designed.
What it means for a shareholder
6.7m new shares at about $1.20 to raise about $8.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Higher-grade Productora results, including 56m at 1.3% copper equivalent and 32m at 1.5%, support early-stage resource modelling now under way. RC drilling is due to finish within a week; diamond drilling aims for about 400m depth.
Productora resource drilling returned its widest intersection yet, 167m at 1.0% copper equivalent from surface, and extended the Eastern Breccia to about 800m. Five rigs operate, with further results from about 20 RC and 4 diamond holes pending.
Administrative notice under the Corporations Act that the 6,083,361 placement shares were issued on 3 June without a disclosure document. No new substance.
Confirms the $3.65m placement is complete, with funds received and 6,083,361 shares at 60c being issued. Money goes to resource drilling over two new large zones at Productora.
What it means for a shareholder
6.1m new shares at $0.600 to raise about $3.6m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Amended re-release of the 30 May $3.65m placement (6,083,361 shares at 60c); the visible text is identical, with a copper equivalent footnote added. No new information.
What it means for a shareholder
6.1m new shares at $0.600 to raise about $3.6m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
30 May 2011capital raising announcement▲ GoodMajor
Hot Chili raised $3.65m via a placement of 6,083,361 shares at 60c, led by DJ Carmichael, to fund extra Productora resource drilling. First Productora resource is now targeted before early September 2011; three more diamond rigs mobilised.
What it means for a shareholder
6.1m new shares at $0.600 to raise about $3.6m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
First-ever Los Mantos drilling hit shallow copper in 18 of the first 21 holes over 1.5km, e.g. 8m at 2.1% copper and 26m at 1.0% copper equivalent. Results for 29 more holes are pending, and second-pass drilling is being planned.
Productora in-fill drilling found two more new zones, making three beyond the main breccia; best result 67m at 1.2% copper equivalent. About 6,000m RC and 2,000m diamond are done. Maiden Los Mantos results are due shortly.
March quarter report: the 16,000m first-pass Productora programme is complete, and a resource in-fill programme (6,000m diamond, 7,000m RC) is under way after new zones were found. Los Mantos first-pass drilling has begun. Four RC and one diamond rig are operating.
6,210,527 escrowed shares issued to CAP S.A. in the listing-time exploration interest acquisition will be released from escrow on 23 April 2011. Administrative.
Mines and Money Hong Kong presentation promoting Chile as a mining destination and recapping Hot Chili's projects. It shows 142.8m shares on issue and 40.7m 20c options. Largely repeats known facts.