15 Nov 2023farm in farm out agreement▲ GoodMajor

Hot Chili signed options to buy two historic copper mine areas, Marsellesa and Cordillera, about 10km southwest of Costa Fuego's planned hub. Marsellesa exercise costs US$1.0m, Cordillera US$3.7m, plus 1% to 1.5% royalties. First-pass drilling, the first ever on either, is planned within a week.

Discuss in chat

26 Oct 2023farm in farm out agreement● Neutral

Bastion Minerals announced that Hot Chili's exclusivity period to complete due diligence and sign an option agreement for the Cometa project is extended to 18 December 2023. The delay is to allow Chilean registry formalities on the mining concessions. Continues the August LOI; no option agreement is signed yet.

Discuss in chat

29 Sept 2023resource reserve update● Neutral

Annual Mineral Resource and Ore Reserve statement at 30 June 2023, lodged with the annual report. It notes material changes over the year owing to the June 2023 PEA. The Productora resource is unchanged since the 31 March 2022 estimate. No new resource figures visible in the text.

Discuss in chat

28 Aug 2023farm in farm out agreement▲ GoodMajor

Hot Chili signed a binding letter of intent with Bastion Minerals for an option on the 56km2 Cometa project, 15km from Costa Fuego's planned operating centre. Cost is US$100,000 on grant and US$200,000 within 12 months; exercise price is US$2.4m (18 months) or US$3.0m (30 months), payable in cash or half in shares. Nine RC holes (2,010m) are drilled at Cortadera.

Discuss in chat

3 Aug 2023drilling spud▲ GoodMajor

Drilling restarted on the western extension of Cortadera, starting the 30,000m Costa Fuego programme funded by the Osisko deal (about A$26m cash). One RC rig is running, with diamond rigs to follow. First holes fulfil the remaining 3,000m AMSA commitment; resource update due H2 2023.

Discuss in chat

28 June 2023resource reserve update▲ GoodMajor

First Costa Fuego PEA: post-tax NPV8% US$1.10bn, IRR 21%, start-up capital US$1.05bn, 16-year mine life, about 112ktpa CuEq. Uses US$3.85/lb copper. Preliminary study (+/-35%); PFS now due H2 2024, later than the H1 2024 earlier planned.

Discuss in chat

4 Apr 2023drilling result▲ GoodMajor

Drilling below Cortadera's Cuerpo 1 found mineralisation up to 300m beneath the current resource, including 270m at 0.5% CuEq from surface (CRP0202D). First-pass drilling on the AMSA ground is complete with 15 of 16 holes pending; resource update planned for H2 2023.

Discuss in chat

23 Feb 2023drilling result▲ GoodMajor

First hole on the AMSA ground, LCD0001, returned 120m at 0.5% CuEq including 38m at 1.0% CuEq, confirming a fourth porphyry (Cuerpo 4) as the earlier AMSA hole suggested. Deeper mineralisation also found below Cuerpo 1; cash about A$10m.

Discuss in chat

13 Jan 2023drilling spud▲ GoodMajor

Drilling started on the western extension of Cortadera: a roughly 10,000m programme testing four porphyry targets, starting with Cuerpo 4. Prospective strike length is 5.2km. PEA due H1 and resource upgrade H2 2023; PFS now H1 2024, later than the Q1 2023 previously expected.

Discuss in chat

31 Oct 2022drilling result● Neutral

Productora metallurgical hole MET025 returned 244m at 0.8% CuEq and Alice hole MET028 152m at 0.6% CuEq, above the resource estimate. First Santiago Z drilling found silver and molybdenum but no significant copper-gold; follow-up planned, with only 35% of the target tested.

Discuss in chat

30 Sept 2022resource reserve update● Neutral

Annual resource statement at 30 June 2022 restates the Costa Fuego resource: Indicated 725Mt at 0.47% CuEq, up from 391Mt at 0.52% a year earlier. It attributes the change to the Productora and Cortadera updates and the maiden San Antonio estimate; no new estimate.

Discuss in chat

8 Sept 2022drilling result▲ Good

San Antonio resource-upgrade drilling hit 21m at 1.6% CuEq from 74m and 13m at 1.3% CuEq, several holes above the model grade. The 4.2Mt Inferred resource is set to be upgraded to Indicated in the next update; Santiago Z has five holes complete.

Discuss in chat

24 Aug 2022drilling result▲ GoodMajor

Valentina diamond hole VALMET0002 returned 3m at 12.1% CuEq within 12m at 4.6% CuEq, confirming the VAP0009 result and the earlier visual intersection. Mostly sulphide, suited to flotation. Six Valentina and twelve San Antonio holes still pending.

Discuss in chat

8 Aug 2022drilling result▲ GoodMajor

Valentina RC hole VAP0009 returned 8m at 5.9% CuEq (5.7% Cu), the company's highest-grade intersection to date, extending mineralisation 120m south of old workings. Assays are pending for 17 more Valentina holes and 16 San Antonio holes; first Santiago Z drilling is underway.

Discuss in chat

19 July 2022drilling result▲ GoodMajor

Final Cortadera development hole CORMET004 hit 484m at 0.5% CuEq, and Productora metallurgical holes hit up to 45m at 1.2% CuEq. Drilling cut from three rigs to one with cost rationalisation; cash about A$22m, which the company says funds it into late 2023.

Discuss in chat

14 June 2022drilling result▲ Good

Valentina hole VALMET002 logged a 17m visual copper zone, 120m south of old underground workings; assays are pending and visual estimates are indicative only. Company reports cash of about A$24m, funded until mid-2023, and a port proposal received from Las Losas.

Discuss in chat

20 May 2022drilling result▲ GoodMajor

Cortadera hole CORMET005 hit 658m at 0.6% CuEq, including 130m at 0.9%, plus 30m at 1.4% outside the current high-grade model. Third Cuerpo 3 hole to show the high-grade core growing, ahead of the PFS and resource upgrade later in 2022. Drilling started at Valentina and San Antonio.

Discuss in chat

17 May 2022resource reserve update● Neutral

Hot Chili filed the NI 43-101 technical report supporting the 31 March 2022 Costa Fuego resource upgrade (Indicated 725Mt at 0.47% CuEq). The company states there are no material differences from the March announcement, so no new numbers.

Discuss in chat

29 Apr 2022drilling result● Neutral

CORMET003 at Cortadera hit 552m at 0.6% CuEq including 248m at 0.8%. First eleven Productora Central RC holes gave modest results, best an end-of-hole 36m at 0.2% CuEq in PRF003, with clay hampering depth; diamond tail planned. Drilling at Valentina, San Antonio and Santiago Z to follow.

Discuss in chat

14 Apr 2022drilling result▲ Good

Cortadera development-study hole CORMET006 returned 876m at 0.5% CuEq, including 206m at 0.9% CuEq, from the main Cuerpo 3 porphyry. Supports the March resource upgrade's high-grade core. Four more completed holes await assays.

Discuss in chat

31 Mar 2022resource reserve update▲ GoodMajor

Costa Fuego resource upgraded: Indicated 725Mt at 0.47% CuEq (up 67%) and Inferred 202Mt at 0.36%. High-grade Indicated is 156Mt at 0.79%. Over 80% is now Indicated, fulfilling the Q1 upgrade promise and setting up the Q3 2022 PFS. Company says it is funded for 18 months.

Discuss in chat

9 Feb 2022drilling result▲ Good

Final 2021 Cortadera assays include 927m at 0.3% CuEq in CRP0144D. Updated modelling links all three porphyries and shows a new higher-grade core (+0.6% Cu) at Cuerpo 3. Resource upgrade on the 451Mt October 2020 estimate still due Q1 2022; no new tonnage figure yet.

Discuss in chat

13 Jan 2022drilling result▲ Good

New shallow Cortadera results include 156m at 0.4% CuEq from surface in CRP0148, with wide near-surface copper at Cuerpos 1 and 2. A 20,000m exploration program began at Productora Central; resource upgrade still due Q1 2022. MD cites $34m in treasury.

Discuss in chat

1 Oct 2021drilling result▲ Good

Cortadera hole CRP0134D hit 610m at 0.5% CuEq, including 138m at 0.8%, extending the North Flank by about 170m with another step-out hole underway. Five shallow Cuerpo 2 RC holes extended the resource edges. Supports the planned upgrade of the 451Mt resource.

Discuss in chat

30 Sept 2021resource reserve update● Neutral

Annual resource statement at 30 June 2021 reports no material change in the year other than the maiden Cortadera resource of 12 October 2020. Costa Fuego stays at 724Mt at 0.48% CuEq. No change since year-end. Productora has no reserve depletion.

Discuss in chat

17 Sept 2021drilling scheduled▲ Good

New 3D geochemical modelling identified two large targets, Productora Central and Santiago Z, each bigger than Cortadera's main porphyry. A fourth rig is being secured to drill Productora Central in Q4; Santiago Z drilling approval is expected in December. Early-stage targets, not yet drilled.

Discuss in chat

10 Sept 2021drilling result▲ GoodMajor

Cortadera's north flank returned CRP0124D 362m at 0.6% CuEq, including 82m at 1.0%. Final CRP0088D assays upgraded the June result to 486m at 0.6% CuEq, including 168m at 1.0%. High grade is continuous over 400m. 6,302m of assays remain pending.

Discuss in chat

16 June 2021drilling result▲ GoodMajor

CRP0088D at Cortadera's main porphyry returned 410m at 0.6% CuEq from 440m, including 144m at 1.0% CuEq. CRP0047D gave 218m at 0.6% CuEq from 720m. A new porphyry zone links Cuerpo 1 and 2, so all centres connect over 2.3km. Assays for 5,900m pending.

Discuss in chat

27 May 2021resource reserve update▲ Good

Productora re-modelling and mine reconciliation support a higher grade (+0.4% Cu) open pit satellite option for Costa Fuego. Its 2016 PFS NPV rises about 500% to US$1.1bn at US$4.62/lb copper. The combined Costa Fuego PFS is due to start in coming weeks.

Discuss in chat

18 May 2021drilling result▲ GoodMajor

CRD0080 at Cortadera returned 836m at 0.4% copper and 0.1g/t gold (0.5% CuEq) from 536m, including 436m at 0.5% copper from 536m. It extends the main porphyry's southern flank by about 80m. CRP0062D gave no significant result but shows the two largest porphyries connect at depth.

Discuss in chat