Each one in plain English, with the numbers worked through for a shareholder.
16 Feb 2026drilling result▲ GoodMajor
La Verde holes DKD036 (150m at 0.37% Cu, 0.21 g/t Au from 30m) and DKD035 (220m at 0.37% Cu, 0.14 g/t Au from 38m) add to the shallow higher-grade zone. Company says it looks likely to give Costa Fuego a higher-grade starter pit. DKD039 visual results only; assays due April 2026.
Placement closed, issuing 24,242,425 shares at A$1.65 for about A$40m gross (A$21.8m Australian, C$17.2m Canadian). Brokers received 1,212,121 options at A$2.145 over 30 months. Completes the raising announced 2 and 4 February; TSXV final acceptance still required.
What it means for a shareholder
24.2m new shares at A$1.65 to raise about A$40.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
The A$40m placement was oversubscribed at A$1.65, for 24,242,425 new shares, with Glencore, Blue Spec and GS Group participating. Funds La Verde drilling, the Costa Fuego feasibility study and an EIA submission in late 2026. Several non-binding partner proposals remain under assessment.
2 Feb 2026capital raising announcement● NeutralMajor
Company launched a best-endeavours placement of up to about A$40m at A$1.65 per share, a roughly 15% discount to the last close, with a trading halt. Funds La Verde drilling toward a maiden resource, the Costa Fuego feasibility study and EIA. Brokers get a 6% fee and options at A$2.145.
December quarter: cash A$4.6m plus A$2.8m of expected VAT and JV recoveries, A$1.8m already received in January. Restates La Verde results; 3,347m drilled across nine holes. More parties entered due diligence in the partnering process; further non-binding proposals received.
La Verde diamond holes DKD033 (495m at 0.38% Cu, 0.10 g/t Au from 3m) and DKD034 (426m at 0.37% Cu) extend the discovery, both ending in mineralisation. Assays pending for six holes, including the near-surface DKD035 and DKD036. Drilling restarted 12 January 2026.
Assays from La Verde hole DKP005D added 47m at 0.57% Cu and 28m at 0.49% Cu on the eastern flank. Two near-surface holes show strong visual porphyry mineralisation, assays pending. Company talks of a higher-grade starter pit for Costa Fuego; this is not yet confirmed by assays.
December 2025 corporate presentation repeating known Costa Fuego and La Verde material. Shows 177.3m shares, about A$14m cash and market cap of A$160m at A$0.90 on 27 Nov 2025. Glencore holds 7.5%. No new announcements apparent in the readable text.
First La Verde diamond hole DKD032 returned 529m at 0.41% Cu and 0.21 g/t Au, including 148m at 0.60% Cu. It extends the earlier 308m discovery hole and ended in mineralisation; company says results exceeded expectations. Assays pending for five more holes.
Webcast and attendance details for the 2025 AGM on 27 November 2025, 9:30am AWST, in person at Applecross or online via Teams. Administrative notice only; no new business information.
September quarter: cash A$13.8m and no debt, after the A$14.1m entitlement offer. La Verde diamond drilling started late September (three holes done, assays pending) and the Sectoral Permit for expanded drilling arrived. Partnering process drew significant additional interest.
Hot Chili received a Sectoral Permit on 9 October 2025 to expand La Verde drilling, to test lateral extensions and three nearby look-alike targets. Two of eleven phase-two diamond holes were complete, showing visual porphyry copper mineralisation with assays pending, and a second RC rig was planned.
2025 AGM set for 27 November 2025, 9:30am AWST. Director nominations close 9 October 2025. Notice of Meeting due in October. Administrative notice; Fiona Van Maanen's election was already expected.
2025 Annual Report for the year to 30 June 2025. Chair's letter restates the year's milestones: Costa Fuego PFS, Huasco Water PFS, La Verde discovery, new board appointments and the A$14m raising. Financial statements are not in the readable portion.
Appendix 4G, the standard key pointing to the company's corporate governance disclosures for the year to 30 June 2025. Administrative filing with no new substance.
Corporate Governance Statement approved by the board on 25 September 2025, describing its policies against ASX recommendations. Notes no measurable gender diversity objectives are set. Administrative disclosure with no new business information.
Annual statement at 30 June 2025 shows no change to the Costa Fuego resource: Indicated 798Mt at 0.45% CuEq and Inferred 203Mt at 0.31%. Probable Ore Reserve is 1.9Mt copper contained, from the March 2025 PFS reserve.
Phase-two diamond drilling began at La Verde on 22 September 2025 with one rig on double shifts, targeting depth extensions to the three higher-grade centres. Further drill access approvals are described as in final stages. Follows phase-one RC results; no new assays.
The rights issue closed fully subscribed, raising A$14.2m (23,609,854 new shares at A$0.60) before costs. It resolves the open funding thread after cash fell to A$5.2m. Funds the BMO-led partnering process and La Verde diamond drilling.
What it means for a shareholder
23.6m new shares at A$0.600 to raise about A$14.2m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Offer document for the A$14m non-renounceable rights issue: 2 new shares for every 13 held at A$0.60, lead manager Veritas. Offer opens 13 August and closes 29 August 2025. Shortfall facility is open to holders taking full entitlements. Formalises the 5 August announcement.
5 Aug 2025capital raising announcement● NeutralMajor
A$14m non-renounceable rights issue, 2 new shares for every 13 held at A$0.60, not underwritten, lead manager Veritas. Funds the partnering process and La Verde diamond drilling toward a maiden resource. Company is assessing several non-binding partner proposals.
June quarter report: cash A$5.2m, with A$2.0m of VAT refunds expected, down from A$7.5m. Restates La Verde results and the Mathews and Cerda appointments. Strategic partnering is ongoing with BMO Capital Markets as adviser; the PFS needs US$1.27bn funding.
June corporate presentation on Huasco Water. Text shown is disclaimers and repeats the 31 March Water PFS; no new figures seen in the readable portion.
Magnetic and soil geochemistry modelling identified three look-alike porphyry targets near La Verde, two under gravel cover. Phase-two drilling will be expanded to test them; access approval is expected in September 2025. Exploration targets only, not drilled.
Final phase-one La Verde assays more than double the footprint to 1,000m x 750m, to 400m depth, from 31 RC holes (9,600m). Best: 389m at 0.4% Cu (DKP030). Three higher-grade centres found; open laterally and at depth. Phase two awaits drill access approval.
Hot Chili filed the NI 43-101 technical report supporting the 27 March Costa Fuego PFS. The company states there are no material differences from the PFS announcement, so no new figures.
Stuart Mathews, former Gold Fields executive vice president, appointed Non-executive Chair, and Alberto Cerda as executive Project Director, ahead of the Costa Fuego and Huasco Water DFS. This fills the chair vacant since Dr Adshead-Bell resigned on 11 March.
Costa Fuego and Huasco Water registered with Chile's Ministry of Economy project office as priority projects, eligible for streamlined approvals. It centralises permitting, including the second maritime concession application. Registration is not an approval itself.
March quarter report restating the Costa Fuego PFS, Huasco Water PFS and La Verde results. Phase 1 drilling finished 10 April; 19 hole assays pending. Cash A$7.5m with A$5.0m expected back; spending to fall 60-65% over six months while strategic funding talks advance.