Each one in plain English, with the numbers worked through for a shareholder.
5 Sept 2018drilling result▲ GoodMajor
First Valentina drill results: 12m at 1.5% copper from 28m and 8m at 2.0% copper from 124m, in two of three holes. This is the second El Fuego deposit with successful extensions after San Antonio, resolving the pending Valentina assays. Follow-up drilling is being planned.
Final San Antonio assays include 9m at 2.0% copper from 132m and 16m at 1.1%, continuing grade over 700m of strike. Follow-up drilling is being planned pending approvals; Valentina results from three holes are still to come.
More San Antonio results, including 53m at 0.9% copper from 72m (27m at 1.3%) and 18m at 1.3%. The company calls it a large extensional discovery, open at depth and along strike, over about 700m. 23 holes still pending.
Diggers and Dealers presentation repeats the San Antonio drill results and El Fuego strategy already announced. It shows 743.9m shares, cash about A$3.5m and a share price of 2.9c. No new information.
Sprott Vancouver presentation repeats the first San Antonio drill results released the day before and the El Fuego strategy. It shows 735.1m shares, cash about A$4.0m and a dual listing planned 'at the right time'. Nothing new.
First San Antonio drill results confirm the Main Lode continues below the old mine: 19m at 2.0% copper from 61m, 15m at 1.7%, 13m at 1.3%. Mineralisation dips shallowly, suggesting open pit potential. 23 holes await assay; drilling has moved to Valentina.
Mapping south of San Antonio confirms multiple targets, with rock chips up to 6.5% copper, and a San Antonio East zone at least 600m long. 18 holes (about 2,280m) are drilled; first assays are due shortly. No drill assays yet.
June quarter convertible note interest of A$226,900 was paid by issuing 7,989,446 shares at 2.84c, continuing the share-paid pattern. Routine coupon payment that adds to the share count.
First drilling began 1 June at San Antonio, a 4,000m RC programme, with four holes done. The formal Valentina option (90% over four years) is now signed, resolving the February LOI and allowing drilling there next.
Latin America Downunder presentation 'San Antonio Rising' repeats the El Fuego strategy and Productora PFS. It shows 700.9m shares, cash about A$3.4m, plus A$1.1m due if tranche 2 is approved at the 15 June EGM. No new results.
First tranche of the placement completed: 98,378,610 shares at 3c raised A$2.95m, with 52,189,305 free options at 10c. The balance awaits shareholder approval around 15 June. First drilling at San Antonio and Valentina is expected in June, pending approvals.
What it means for a shareholder
98.4m new shares at $0.030 to raise about $3.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Listing rule notice on the completed placement: 98,378,610 shares at 3c plus 52,189,305 free 10c options, diluting existing holders 14.04% (shares on issue now 700.9m). Estimated costs A$227,978; no underwriting. Repeats known figures.
What it means for a shareholder
98.4m new shares at $0.030 to raise about $3.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Cleansing prospectus covering the free attaching options to placement participants and 3,000,000 options to an adviser. It is a technical compliance document for the April placement and carries no new commercial information.
Placement at 3c per share, targeted at A$2.5m but accepted up to A$4.0m, with one 10c option for every two shares (expiring 31 May 2020). It resolves the SPP shortfall thread at a lower price than the 3.5c SPP. Second tranche needs shareholder approval.
Historical face sampling at San Antonio includes 7.5m at 10.4% copper. Lease miners found the main lode continuing below 90m depth. The company now sees resource potential as many multiples of the historical 2Mt at 2% copper. Mapping outlines a 6km corridor with two possible porphyry centres.
Newly received historical underground data shows San Antonio drill intercepts such as 14m at 3.1% copper (including 5m at 5.5%) and 12m at 2.9%, open and untested. Surface mineralisation now spans 1.5km. Lease miners also report a second parcel of 15.02t at 3.68% copper.
Convertible note interest of A$224,389 for the March 2018 quarter was paid by issuing 6,099,183 shares at 3.679c, continuing the share-paid pattern seen in October. Routine coupon payment that adds to the share count.
Company Secretary John Sendziuk, in the role since 2010, has retired. Lloyd Flint, a chartered accountant who is also secretary of Bligh Resources and Winchester Energy, takes over immediately.
Presentation repeats the El Fuego high-grade strategy and Productora PFS. It shows 596.4m shares, market cap about A$20.3m, cash about A$1.0m at 15 March, and a planned dual listing. Resource is quoted at 1.5Mt copper and 1.0Moz gold.
Company circulated an initiation of research on Hot Chili by EverBlu Capital, titled 'Production Options Add Attraction & Resilience'. Cover note only; the research itself is on the website and no new company information is given.
Half-year to 31 December 2017 shows a loss of A$3.1m (A$1.85m prior year). The report recaps the El Fuego deals, surface results and the A$1.0m share purchase plan. No significant changes in state of affairs were reported.
Technical due diligence on Valentina is positive: 1997 certified production averaged 4.0% copper, with 700m of mapped strike. Historical hole 11m at 2.0% copper is unfollowed. Formal 90% agreement awaits legal due diligence, continuing the February non-binding LOI.
Lease miners at San Antonio report ore parcels of 2.1% to 4.3% copper (3.1% weighted average) from a 20m wide shallow zone, delivered Nov 2017 to Feb 2018. Infill soil results show large copper anomalies south of the mine. Drilling still pending.
Lease miners report a 16.3t ore parcel at 5.24% copper from 300m south of the San Antonio mine, suggesting high grade over 1km of strike. Surface chips reach 4.43% copper. Results are miner-reported, and drilling is still pending.
21 Feb 2018asset acquisition disposition▲ GoodMajor
Non-binding LOI signed to earn 90% of Valentina over four years, 20km east of Productora, a third satellite deal. San Antonio, Lulu and Valentina are grouped as the 'El Fuego' project. Historical drilling includes 11m at 2.0% copper.
Quarterly convertible note interest of A$229,411 paid for the December 2017 quarter. Routine coupon payment; the announcement does not say whether it was paid in cash or shares.
Surface sampling at Lulu returned up to 2.8% copper and 3.9g/t gold, confirming an 800m outcropping extension of the historical high-grade mine. Never drilled; more sampling planned in the new year to prioritise drill targets for 2018.
Surface sampling at San Antonio confirmed a 'Parallel Lode' with rock chips up to 2.0% copper, up-dip of a historical 20m at 1.0% copper hole. Project size doubled through new lease applications; first drilling still planned early 2018.
Share purchase plan closed having raised only A$1.0m (28.8m shares at 3.5c) against the A$3m target. About A$2m shortfall may be placed to sophisticated investors on the same terms.
What it means for a shareholder
28.8m new shares at $0.035 to raise about $1.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.