Each one in plain English, with the numbers worked through for a shareholder.
9 Dec 2015investor presentation● Neutral
Managing Director's AGM presentation, 'The Mining Chapter Begins'. Recaps 2015: Portia over 50% of overburden removed, $6m Investec loan, 10,000oz hedged at A$1,618, SPP $0.9m. Scorecard marks Maldorky pre-feasibility and Mutooroo mining lease as not completed, citing iron ore outlook and Mutooroo's processing needs.
The Share Purchase Plan closed with about $0.9m from 160 shareholders, at $0.25 a share, and all applications will be filled with about 3.8 million new shares. Funds go to North Portia evaluation and Kalkaroo de-risking. Completes the plan opened in October, which had no set target.
Updated presentation for a Perth shareholder meeting and AMEC conference, adding some future cobalt possibilities. Shows cash $2.2m at 31 July, no debt excluding the $6m Investec facility, market cap $41m, and about $80.5m total gross Portia cash flow. No new results.
Portia moved 539,000 m3 in October, passing 3 million m3 and nearing the half-way point of about 3.5 million m3. Investec drawdown conditions are met. North Portia drilling starts within two weeks, with a mining decision targeted late 2016.
The Share Purchase Plan closing date was extended from 6 to 27 November so holders can weigh the hedge and annual report. So far 85 shareholders have taken about 1.8 million shares at $0.25 (about $0.45m, inferred from the text).
What it means for a shareholder
1.8m new shares at $0.250 to raise about $450,000. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
2015 annual report recaps the year: Portia funded and mining, Investec loan and 10,000oz hedge at $1,618, North Portia study, and Kalkaroo and Maldorky permitting. First gold targeted July 2016. Financial figures are not visible in the text provided.
Appendix 4G corporate governance checklist, showing which ASX governance recommendations Havilah follows. Administrative filing with no new business information.
Havilah locked in 10,000oz of Portia gold sales at an average A$1,618/oz under the Investec facility, about 40% of its share and the facility maximum. This supports the targeted $40m gross proceeds, though it caps upside on the hedged ounces.
The Share Purchase Plan booklet was sent to eligible holders. Offer is up to $15,000 at $0.25, a 2.5% discount to the 10-day average price, closing 6 November. Administrative mailing of the offer already announced on 12 October; no new terms.
Portia moved 518,950 m3 of overburden in September, slightly below August as the pit wall was trimmed, with over 2.5 million m3 removed. Two Knelson concentrators ordered for the gravity plant. Nearly all Investec loan conditions are now met.
12 Oct 2015capital raising announcement● NeutralMajor
Havilah offered shareholders a Share Purchase Plan of up to $15,000 each at $0.25 per share, the same price as the June placement. Closes 6 November. Funds are for the Portia plant, North Portia drilling and studies, and working capital. Size is not stated.
Havilah and Investec signed documents for the $6m loan and risk management facility accepted in August. Drawdown awaits conditions and Ministerial Consent, expected before end of October, and the 10,000oz gold hedge must still be finalised. Resolves the pending documentation.
Portia moved a record 580,113 m3 of overburden in August, up 5% on July, with over 2 million m3 removed, almost 30% of the total. Investec documents are still being finalised. Mining is on plan, continuing the July pace.
Updated company presentation for the Exchange SA conference in Adelaide. Repeats known points: Portia mining under way, >$40m gross cash flow prospect in 2016, cash $2.2m and no debt at 31 July 2015, with the $6m Investec loan accepted. No new results.
Havilah will fast-track a study on mining North Portia copper-gold after Portia gold mining winds down in late 2016. A scoping plan shows about 3.7Mt at 0.68% Cu and 0.49 g/t Au, holding 25,000t copper and 58,000oz gold, needing 25Mt of overburden removal. Drilling and metallurgy come next.
Havilah accepted Investec's offer of a $6m loan and gold hedging facility, following credit approval. The loan runs 18 months (expected to mature February 2017) at floating rate plus margin, with 10,000oz hedged. A success fee applies above 50,500oz. Documents are due by end of August. This resolves the May mandate.
Portia moved 549,000 m3 of overburden in July, up 37% on June, with 1.3 million m3 moved so far and 5.7 million m3 remaining. A third crew lets both fleets run seven days a week. Processing plant targeted for commissioning early 2016.
Portia moved 400,000 m3 of overburden in June, and a regulator inspection was favourable. CMC added a second equipment fleet not in the original plan. Dewatering is exceeding the groundwater model. Shares on issue now 164 million after the placement.
15 June 2015capital raising announcement● NeutralMajor
Havilah raised about $2.0m through a placement of roughly 8 million shares at $0.25, a 19% discount to the 10-day average price of $0.31. PhillipCapital takes a 5% fee. Funds go to the Portia plant, Kalkaroo and general costs. Dilutes holders modestly.
What it means for a shareholder
8.0m new shares at $0.250 to raise about $2.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Havilah signed a mandate letter with a major international resource bank for a $6m loan and gold hedging facility. It would give standby funding for Portia and hedge 10,000oz. It is subject to credit approval, with financial close expected in about 6 weeks. Reverses the earlier no-debt approach.
Updated company presentation for a PhillipCapital roadshow in Singapore and Hong Kong, plus new Portia videos. Shows cash $2.9m, debt $0.8m and market cap $52m, with a list of major shareholders. No new results.
Havilah says adverse weather in New South Wales has not affected Portia, with a perimeter bund built around the pit and dewatering working. CMC plans a second 250 tonne excavator within weeks. Reassures shareholders; no change to timing.
Half-year accounts to 31 January 2015 largely recap known events: the CMC contract, Kalkaroo public comment, and the $2.1m Kalkaroo Station purchase. Overburden removal started 30 March; first ore is expected by June 2016. Financial figures are not visible in the text provided.
Conference presentation on Portia, which began open pit mining on 30 March 2015. Site works are largely complete, with first gold ore still targeted by 1 July 2016. Repeats the earlier 50:50 CMC deal and the 67,000oz resource; no new results.
Invitation and slides for shareholder presentations on Havilah and the Portia mine. Slides restate known points: cash $2.9m and debt $0.8m at 31 Jan 2015, market cap $41m, and a prospect of over $40m gross cash flow in 2016. No new results.
Invitation to shareholder presentations in Adelaide, Melbourne and Sydney on the company and the Portia development, with the Adelaide session on 27 March to be videoed. Administrative notice with no new results.
Havilah highlights a local newspaper article on Portia progress, with the contractor saying 12 million tonnes of overburden must be moved and ore mining is on budget for July 2016. Dewatering system nearly finished by Havilah's own crew.
Question and answer document from broker Phillip Capital, drawn from a discussion with the Managing Director on the Kalkaroo updated mining study. It restates the 2 March study content; no new figures in the text provided.
Havilah adopted a new constitution and changed its name to Havilah Resources Limited, approved at the 16 December 2014 AGM. ASX effective date is 11 March 2015; the HAV code is unchanged. Administrative only.