3 Feb 2015asset acquisition disposition▲ GoodMajor
Prairie was granted a new 100%-owned concession, Sawin-Zachód, adding 54km2 to take the Lublin project area above 235km2. Historical drilling of 23 cored holes found over 17 coal seams. Initial payment was PLN 60,600 (~A$21,664); one borehole is required by end-2015.
Prairie says its future Lublin mine will be named the 'Jan Karski Mine', announced at a Lublin press conference with regional and Australian officials. Geological Documentation is due before end-2014, with a mining concession application planned for 2015. Mostly community relations.
Polish Ministry of Environment rejected Bogdanka's appeal over the K-6-7 concession, confirming Prairie's exclusive right to apply for a mining concession there. Bogdanka plans a court complaint, which Prairie says would not affect its concession rights. Resolves the September rejection's open appeal question.
Lublin project presentation repeating known facts: 1.6Bt resource, scoping study cash cost of US$37/t and 6Mtpa clean coal over 22 years. Lists upcoming catalysts such as geological documentation in Dec 2014/Jan 2015. No new results.
Patrycja Wolińska-Bartkiewicz, a former Polish Deputy Minister of Transport, joins the Polish subsidiary's supervisory board and works full time on permitting, infrastructure and community engagement for Lublin. Adds local government experience to the team.
Annual Report 2014 for the year to 30 June, repeating the 7 September-era full-year accounts content, with added corporate governance and shareholder information. The extract shows no financial figures or new results.
Statutory annual financial report for the year to 30 June 2014, the first under the Prairie Mining name. The extract shows directors, Ernst & Young as auditor and Todd and Hannigan's 16 September appointments, but no financial figures.
Tom Todd, ex-CFO of Aston Resources, joins as non-executive director with Todd Hannigan as alternate, and receives 1.4m options at 45c. Their vehicle T2 Resources buys 2.8m existing shares from Taso Arima, so no new capital is raised.
10 Sept 2014regulatory community update▲ GoodMajor
Polish Ministry of Environment formally rejected Bogdanka's application for a mining concession over Prairie's K-6-7 concession, one of its four Lublin concessions, saying it would undermine Prairie's usufruct rights. Bogdanka may appeal, so the threat is not fully closed.
Pre-feasibility study for Lublin has started, with Golder Associates as lead consultant and Royal HaskoningDHV jointly appointed after a tender. Targeted drilling will upgrade the resource. Completion remains due in the first half of 2015, as previously flagged.
Final hole of the seven-hole drilling program is being completed, satisfying the minimum works required under the Lublin concessions, reportedly almost a year early. Geological Documentation is to be lodged December 2014 or January 2015 to start the mining concession path. Remaining three holes' results pending.
Prairie appoints a Project Development Manager (Nick Edmunds), an Exploration and Geoscience Manager, a Coal Marketing Consultant and an Environmental Consultant ahead of the pre-feasibility study, plus a Polish subsidiary board addition. Builds team for the development phase.
Wood Mackenzie appointed to run thermal and metallurgical coal marketing studies for Lublin, feeding the pre-feasibility study. Thermal study is due in the December 2014 quarter; the metallurgical study follows the late-2014 drilling and washability work, due March 2015 quarter.
Presentation repeating the 28 April scoping study results: US$37/t cash cost, US$332m steady-state EBITDA, 6.0Mtpa clean coal, 22-year life and 1.6Bt Inferred resource. Adds Polish fiscal context but no new results.
Scoping study on Lublin shows up to 6.7Mtpa saleable coal over 22+ years, steady-state operating cash cost of US$37/t and average EBITDA of US$332m a year (peak US$391m). It is preliminary, partly based on Inferred resource (26%). Pre-feasibility study to start, due first half 2015.
A Deloitte Poland study says Lublin development could create up to 2,000 direct and 10,000 indirect jobs and double regional foreign investment. It was presented at a Lublin press conference with officials, and Poland's Treasury Minister sent a letter of support.
A desktop review by Golder Associates indicates Lublin geology is potentially suitable for low-cost longwall mining with roof bolting. It is preliminary and feeds into scoping study mine design, now said to be due in the coming weeks.
An independent transport study by Polish consultancy TOR concludes Lublin has underused rail and port capacity, suggesting low transport costs to Polish, EU and seaborne markets. It is a standalone input to the scoping study, still due in the first half of 2014.
ASX queried a share price rise from 36c to 44c intraday on 26 March. The company said it knew of no undisclosed information, pointing to the 13 March washability results, new broker coverage with $1.00-$2.00 price targets, and its European roadshow.
Washability tests on the first four Lublin core holes show clean-coal yields of 75-97%, ash of 2.0-2.7% and calorific values of 7,526-7,830 kcal/kg for the 391 seam (327Mt Inferred). Builds on October's coal quality results; scoping study still due in the first half of 2014.
March 2014 London investor forum presentation repeating the 1.6Bt Inferred resource, the metallurgical coal results and the scoping study due in the first half of 2014. No new results seen.
Half-year report to 31 December 2013 recaps coal quality results, the Taras appointment, permitting and the ESIA. The extract shows no financial figures. It lists Ernst & Young as auditor, whereas BDO was previously recorded.
Agreement signed with Poland's Ministry of Environment for rights to further historical exploration data, a prerequisite to start mine permitting. Consultant GEO-EKO-WIERT is preparing geological documentation due within 12 months. Data is expected to support a resource upgrade.
WS Atkins is appointed to run the Environmental and Social Impact Assessment for Lublin, a prerequisite for a Polish mining licence. Fills the environmental consultant role flagged earlier. Scoping study still on track for first half 2014.
The 13.5m-share placement at 27c is completed, raising $3.645m before costs. 2.2m unlisted options at 45c expiring June 2017 were also issued. Shares on issue rise to 132.3m. Resolves the December raising.
24 Dec 2013capital raising announcement● NeutralMajor
Placement of up to 13.5m shares at 27c to raise up to $3.645m, led by CPS Capital, to accelerate Lublin exploration and provide working capital. The price is below the 50c April 2013 raise and the 37c November market price in the presentation.
What it means for a shareholder
13.5m new shares at $0.270 to raise about $3.6m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
At the company's request, trading is suspended pending a capital raising announcement, to last until the announcement or 24 December 2013 at the latest. Administrative step ahead of the placement.
Miroslaw Taras, Bogdanka's Chairman from 2008 to September 2012, is appointed Strategic Advisor to the Polish subsidiary, advising on mine design, permitting and marketing. Adds local mining expertise to the Lublin team; no financial terms given.
November 2013 presentation repeating the 1.6Bt Inferred resource and the new 391 seam quality results. Lists 118.8m shares, ~A$44m market cap at 37c, ~A$4m cash and ~A$11m listed securities. No new results.