The story so far
The events that changed the company's story, in plain English, each written against everything known about the company at the time. The dot shows whether it was good, bad or neutral for shareholders.
2026
- 4 Aug
GreenX was granted two new Eleonore North licences covering about 1,600 km2 in East Greenland, targeting intrusion-related gold. This lifts the portfolio to about 2,100 km2 across four licences. Historical gold grab samples reached 50 g/t; fieldwork is complete and first results are expected this quarter.
asset acquisition disposition
- 28 May
GreenX set a JORC Exploration Target at Tannenberg of 144-279 Mt at 0.9-1.4% copper and 15-21 g/t silver, for 1.3-3.9 Mt contained copper. It is conceptual, not a resource, and extends beyond the shale the 1940 estimate covered. Drilling and mine access follow.
resource reserve update
- 28 Jan
GreenX raised about A$13.6m through a placement of 16 million shares at A$0.85 (£0.43), settling 4 February 2026. Funds go to Tannenberg and Eleonore North exploration and working capital, including the Poland arbitration costs.
capital raising announcement
- 12 Jan
The Singapore court rejected Poland's bid to set aside the ~£183m ECT award in full, resolving the hearing held in July 2025. Extra interest of about £17m has accrued to end-December 2025. Poland can still seek to appeal; the English BIT challenge remains.
regulatory community update
2025
- 12 Dec
GreenX completed exercise of its option to acquire 90% of Group 11 Exploration GmbH, which holds the Tannenberg copper licences (about 1,900 km2 after a seven-fold expansion). This ends the earn-in thread and makes Tannenberg a majority-owned project. Price not shown in the excerpt.
asset acquisition disposition
- 24 Nov
GreenX will issue A$1m of shares (escrowed 12 months) to keep 100% of Eleonore North in Greenland, resolving the option thread. It adds historical estimates of 83kt at 4.6% antimony and tungsten at 3.2% and 1%; 2026 fieldwork is being finalised.
asset acquisition disposition
- 20 Nov
First modern assays from six of 47 archived Tannenberg cores confirm historical grades: 1.0-3.7 m at 0.7-2.7% copper and 10-55 g/t silver, best 1.5 m at 2.7% copper. Widths exceed those in the 1940 estimate. Remaining results are due through Q1 2026.
drilling result
- 20 Oct
GreenX found a 1940 historical estimate of 728,000 t contained copper at 2.6% at Tannenberg, plus a 1984 estimate of 169,000 t copper at 2.1% with 25 g/t silver. Neither is JORC-compliant; twin drilling is planned to verify and aim for a JORC resource.
resource reserve update
- 11 Sept
GreenX found records of 95 drillholes from 1935-38 in German archives; logs located for 43 holes and assays for 35 so far. The company estimates redrilling would cost over €25m. This is separate from the 47 modern cores being re-logged.
other
- 9 Sept
A BHP-funded airborne magnetic and radiometric survey (58 km2, 660 line-km) at Tannenberg shows deep structures, the Mid-European Crystalline Zone, beneath the old Richelsdorf mines. The company says this is the likely copper source; anomalies extend into Tannenberg 2. Geophysics, not drilling or a resource.
drilling result
- 19 May
GreenX raised about A$4.6m from a placement of 7.1m shares at A$0.65, on top of A$3.7m cash at 30 April 2025. Proceeds go to working capital and business development. A BHP-funded airborne survey is also due to be flown at Tannenberg.
capital raising announcement
- 28 Apr
Tannenberg grew seven-fold to 1,900 km2 from 272 km2 after the original licence was renewed three years and a second 1,628 km2 licence was awarded. GreenX can now exercise its option, as it is earning up to 90%. New historical drill intercepts reported.
asset acquisition disposition
- 6 Jan
GreenX was picked as one of eight companies for BHP's 2025 Xplor program, receiving up to US$500,000 non-dilutive grant for geophysics at Tannenberg. BHP gets exclusivity, a right of first refusal on project-related deals and data sharing during the six-month program.
material agreement
2024
- 27 Nov
Newly released 2008 Geological Survey of Denmark and Greenland (GEUS) samples at Eleonore North show antimony up to 23% and gold up to 4g/t, along a ~4km trend. GreenX will now target antimony as well as gold, having previously focused on gold. Historical data, not new drilling.
drilling result
- 11 Nov
Poland applied to the English court to set aside the BIT award on jurisdiction and procedural unfairness, and seeks a correction to the damages calculation. GreenX says the bar is very high, interest keeps accruing at about 6%, and it holds over A$5.5m cash.
other
- 17 Oct
September 2024 quarter: restates the A$490m award, with interest at about 6% a year. LCM is owed US$11.2m drawn, five times that, then 30% interest from 2025; 6% of the balance goes to management, 3% to legal advisers. GreenX intends to return most cash to shareholders once paid.
quarterly activities report
- 8 Oct
The Poland arbitration was won: about £252m (A$490m) under the BIT and £183m (A$355m) under the ECT, with interest, set off against each other so no double recovery. Only the Jan Karski claim succeeded; Debiensko failed. Poland may seek to set the awards aside.
drilling result
- 2 Aug
GreenX entered an earn-in to take up to 90% of Group 11 Exploration, holder of the 272 km2 Tannenberg copper licence in Hesse, Germany. It covers old Richelsdorf mines that produced 416,500 t of copper. This is a new project beyond Greenland.
asset acquisition disposition
- 15 July
Revised Eleonore North deal: GreenX gets 100% for a 1.5% royalty and A$300k in shares, with no cash, replacing the earlier A$500k cash-and-shares terms. A further A$1m is due only if it keeps the project after 31 Dec 2025. Seismic survey found possible buried intrusions.
material agreement
2023
- 14 July
UHY Haines Norton replaced Ernst & Young as auditor after E&Y resigned with ASIC consent. The board says it chose UHY for its Australian and Polish expertise. Shareholders will vote to ratify at the 2023 AGM.
auditor change
- 13 July
GreenX placed 5.2m new shares at A$0.80 (41p) to raise about A$4.2m, on top of A$8.7m cash at 30 June 2023. Proceeds go to Greenland exploration. Follows the March 2023 placing at A$0.55, so the price is higher this time.
capital raising announcement
- 10 July
GreenX took an option from Greenfields (GEX) to acquire up to 100% of the Eleonore North gold project in eastern Greenland, a possible bulk-tonnage gold system. The option vests on A$600,000 of exploration within 12 months; exercise costs a 1.5% royalty plus A$250,000 cash and A$250,000 cash or shares.
asset acquisition disposition
- 7 Mar
GreenX placed 12.4m new shares at 31 pence (A$0.55) to raise about £3.9m (A$6.8m) from UK, European and some Australian investors. Funds go to Greenland exploration, new resource opportunities and admin while the Poland Tribunal decision is pending.
capital raising announcement
2022
- 29 Nov
The two-week combined BIT and ECT arbitration hearing against Poland in London is complete. The claim is up to £737m (A$1.3bn). The Tribunal will issue an Award with no date specified, so shareholders now wait for the decision.
joint venture update
- 9 Nov
First Arctic Rift site visit verified high-grade copper sulphides at Discovery Zone, with an in-situ sample of 53.8% copper and 1,074 g/t silver (handheld XRF, indicative only). A native copper fissure was also located at Neergaard Dal. Confirms historical reports, but it is not a resource.
drilling result
- 7 Sept
GreenX has now filed its Statement of Reply in the ECT arbitration too, so both Poland claims have replies lodged, totalling £737m (A$1.3bn). Poland's Rejoinder and a combined hearing come next; the US$12.3m litigation funding continues to be drawn.
other
- 20 July
All permits for the 2022 Arctic Rift Copper field program are received. Five field teams with all-terrain vehicles start in coming weeks, targeting Discovery Zone, Neergaard Dal and Knuth Fault via sampling, portable core drilling and geophysics. Follows the earlier plan for a maiden program.
drilling scheduled
- 6 July
GreenX filed its Statement of Reply in the BIT arbitration, revising its claim against Poland to £737m (A$1.3bn) from £806m (A$1.5bn) after updated expert reports. Poland's Rejoinder and a hearing are the next steps.
other
2021
- 15 Dec
Prairie Mining is now GreenX Metals Limited, trading under code GRX from 16 December 2021, following shareholder approval at the 24 November AGM. The company says the name reflects its new direction after the Greenland copper acquisition.
other
- 28 Oct
The entitlements issue price is cut from A$0.25 to A$0.20, so it now raises A$4.6m rather than up to A$5.8m. Polish shareholders are excluded because EY is not yet registered as a third-country auditor in Poland, so only unaudited preliminary results go to Warsaw.
capital raising announcement
- 6 Oct
Prairie signed an earn-in to reach up to 80% of the Arctic Rift Copper project in Greenland by spending A$10m over five years, plus 3m shares to GEX. It is the first move beyond Poland coal. A 1-for-10 entitlement issue at A$0.25 aims to raise up to A$5.8m.
farm in farm out agreement
- 9 June
Prairie filed its Statement of Claim seeking £806m (A$1.5bn) from Poland, as assessed by its own quantum experts. This puts the first number on the arbitration begun in September 2020; Poland had previously declined to engage. It is a claim, not an award.
regulatory community update
2020
- 17 Sept
The share purchase plan received valid applications for 16.08m shares at A$0.25, raising A$4.02m. All valid applications accepted with no scale back. Shares due to be issued 23 September 2020, trading from 25 September.
capital raising announcement
- 9 Sept
Prairie formally started international arbitration by serving Notices of Arbitration on Poland under the Energy Charter Treaty and Australia-Poland treaty. This follows the Feb 2019 dispute notice and July 2020 funding. Damages may include historic spend and lost profits; no amount stated.
regulatory community update
- 21 July
Prairie offers eligible shareholders a share purchase plan at A$0.25 per share, a 25% discount, targeting A$4m (about €2.5m) with up to A$30,000 each. Proceeds are for working capital and business development, following the litigation funding. Offer closes 14 August 2020.
capital raising announcement
- 1 July
Prairie signed an A$18m (US$12.3m) litigation funding agreement with LCM to pursue treaty arbitration against Poland. The facility is limited recourse, repayable only if damages are recovered, and non-dilutive. The claim is to be filed within weeks and may cover lost profits at both mines.
debt financing
- 31 Jan
December 2019 quarter: the Administrative Court ruled in November 2019 that the Ministry's Debiensko denial broke Polish law, revoked it and ordered reconsideration. This reverses the January 2019 final denial. Bogdanka's K6-7 concession award is also noted, and no JSW talks.
quarterly activities report
2019
- 31 Dec
Bogdanka announced it had been awarded a mining concession for the K6-7 deposit, which Prairie says is an integral part of its planned Jan Karski mine. Prairie said it could not comment further yet, that Poland had declined substantive talks on the investment dispute, and that it was finalising arbitration funding.
regulatory community update
- 9 Apr
A Warsaw Appeal Court overturned the injunction protecting Jan Karski tenure from other applicants, which Prairie calls flawed. Its civil claim for a usufruct agreement continues. JSW wants basic terms of a possible deal agreed by end of April 2019.
regulatory community update
- 26 Feb
Prairie and JSW extended their non-disclosure agreement by 6 months to 28 September 2019. JSW has completed initial due diligence, and talks now turn to deal structure and aligning mine plans. No deal is certain.
joint venture update
- 13 Feb
Prairie confirms it formally notified Poland of an investment dispute under the Energy Charter Treaty, the UK-Poland and Australia-Poland investment treaties. It seeks negotiations and reserves the right to go to international arbitration. This moves earlier reserved treaty claims to a formal step.
regulatory community update
- 18 Jan
Poland's Supreme Administrative Court finally rejected Bogdanka's complaints over a K-6-7 concession at Jan Karski, and upheld the order for the Ministry to approve Prairie's Addendum No.3. Separately, the Ministry's final decision denied the Debiensko production-date extension; Prairie will appeal, and concession proceedings could follow.
regulatory community update
2018
- 10 Oct
A joint Prairie-JSW statement says talks continue. JSW's due diligence confirmed part of Jan Karski holds semi-soft coking coal it could use. It also suggests Debiensko coal could be reached via JSW's adjacent mine within up to 18 months of permits, needing concession changes. No deal is certain.
joint venture update
- 28 May
The Ministry of Environment issued a first-instance, appealable decision denying Prairie's request to extend Debiensko's first-production date from 2018 to 2025. Prairie will appeal; it says the concession remains valid to 2058, though a failed appeal could lead to moves to limit or withdraw it. JSW talks continue.
regulatory community update
- 26 Apr
A Warsaw civil court granted an injunction stopping the Ministry of Environment granting Jan Karski concessions or usufruct agreements to anyone but Prairie until full proceedings end (possibly 12+ months). The regional environment director also says Environmental Consent will be decided by 30 June 2018.
regulatory community update
- 3 Apr
Prairie says the Environmental Consent for Jan Karski is still pending, so it missed applying for the mining concession before its exclusive right ended on 2 April 2018. The Ministry of Environment has also not granted a usufruct agreement within three months, so Prairie has begun court action to protect its tenure.
regulatory community update
- 29 Mar
Prairie and JSW signed a non-disclosure agreement to exchange information on both Debiensko and Jan Karski, up to 6 months initially. It follows the February talks and could lead to a transaction, but discussions are preliminary and uncertain.
material agreement
- 21 Feb
Kulik 1 borehole at Jan Karski gave better coking results than May 2017's Cycow 9: coke strength (CSR) 54, up to 75% ultra-low ash semi-soft coking coal, 82% overall saleable yield. Potential 10% price premium. Feeds China Coal's non-JORC studies.
drilling result
2017
- 22 Aug
The Siedliszcze municipality approved the spatial development plan rezoning 56 hectares for the Jan Karski mine site, following the Deposit Development Plan approval in May. Only the Environmental Consent remains before a mining concession application, with the ESIA substantially complete and submission expected in coming weeks.
regulatory community update
- 6 July
Final terms agreed for CD Capital's further investment, upsized to US$2.0m (from the A$2.0m announced in April) of convertible notes at A$0.46, not convertible before 1 April 2018. Subject to shareholder approval. Conversion of all notes and options would give CD about 30%.
capital raising announcement
- 25 May
Lublin Regional Mining Authority approved the Jan Karski Deposit Development Plan, one prerequisite for the mining concession application. Power grid connection conditions for 45MW were also signed. Rezoning and environmental consent are still needed before applying.
regulatory community update
- 1 May
Cycow 9 borehole at Jan Karski returned coal quality results showing potential for ultra-low ash (<3%) semi-soft coking coal, 75% product yield and coke strength (CSR) of 51.5. Consultants suggest a possible 10% price premium to benchmark. Preliminary, and shifts Jan Karski's product mix toward coking coal.
drilling result
- 18 Apr
CD Capital agreed to invest a further A$2.0m in non-interest-bearing convertible notes, exchangeable at A$0.46 per share, subject to shareholder approval. CD Capital would hold about 23% on conversion, about 7% more with options. Follows the UK placement.
capital raising announcement
- 30 Mar
Placing of 11.5m new shares at 28 pence to UK institutions, raising about £3.2m, a 12.5% discount to the last close of 32p. Funds go to Debiensko drilling and Jan Karski pre-construction works. Adds to cash of A$13.1m at December 2016.
capital raising announcement
- 16 Mar
Debiensko Scoping Study (±30% accuracy): 2.6Mtpa hard coking coal over 26 years, cash costs about US$47/t, EBITDA up to US$282m, pre-tax NPV US$1.5bn, capex US$504m. Funding is still needed. Follows the 301Mt resource; moves to feasibility work.
investor presentation
- 1 Feb
Maiden JORC resource at Debiensko of 301Mt hard coking coal: 93Mt Indicated and 208Mt Inferred. This exceeds the 210-260Mt Exploration Target set at the October 2016 acquisition and feeds the Scoping Study, still due in Q1 2017.
resource reserve update
2016
- 2 Nov
Prairie signed a strategic co-operation agreement with China Coal's No.5 Construction Company to complete a bankable feasibility study by mid-2017. They intend to then sign an EPC contract, with CC5C arranging debt finance for Jan Karski. It is an intention, not yet a binding contract or funding.
material agreement
- 11 Oct
Prairie bought 100% of NWR Karbonia, owner of the Debiensko hard coking coal project in southern Poland, for €0.5m upfront plus €1.5m deferred. It holds a 50-year concession and has a 210-260Mt Exploration Target (not a resource). Adds a second project beside Lublin.
asset acquisition disposition
- 29 Mar
A Warsaw administrative court rejected Bogdanka's complaints against the Ministry of Environment over the K-6-7 concession, upholding Prairie's exclusive right to seek a mining concession. Resolves the pending Bogdanka complaint; Bogdanka's outgoing CEO has said he intends further appeals.
regulatory community update
- 8 Mar
The long-delayed Lublin pre-feasibility study is out: 6.34Mtpa saleable coal, US$25/t operating cost, US$348m annual EBITDA, 24-year life on a 139.1Mt marketable reserve. Upfront capex is US$558m plus US$74m contingencies and owners costs. Next: offtake, EPC and permitting.
resource reserve update
2015
- 22 Sept
Shareholders approved the CD Capital deal and Prairie received the initial A$15m convertible note funding. CD's Carmel Daniele and Emil Morfett join the board, replacing resigned directors John Welborn and Taso Arima. Resolves the July proposal.
capital raising announcement
- 23 July
Updated Lublin resource lifts Indicated coal to 333Mt, up 96% on 2014, within a global 722Mt. This is lower than the earlier 1.6Bt total because only 10 seams were modelled. Semi-soft coking coal quality confirmed in the 391 seam; feeds the PFS.
resource reserve update
- 20 July
Prairie agreed up to A$83m from CD Capital: A$15m convertible notes exchangeable at A$0.335 per share, options at A$0.60 for a further A$13m, and a right to invest A$55m later. Subject to shareholder approval; would give CD about 30%, up to 45% with options, and two board seats.
capital raising announcement
- 3 July
Prairie plans to list on the London and Warsaw exchanges in Q3 2015, keeping its ASX listing, with no public offering. Former Bogdanka CEO Miroslaw Taras now works full time and will join the Polish subsidiary's supervisory board.
other
- 1 July
Poland's Minister of Environment approved Prairie's Geological Documentation, giving it the exclusive right for three years to apply for a Lublin mining concession. Resolves the pending approval. The concession application is now expected in 2016, with the four concessions consolidated into one 'Lublin Concession'.
regulatory community update
- 8 Apr
New agreement lets Marindi Metals earn 100% of the Prairie Downs base metals project for A$0.5m cash within 60 days plus A$1m in cash or shares by 30 Sep 2016. Prairie keeps a 2.5% royalty. This replaces the 2013 farm-in and lets Prairie focus on Lublin.
farm in farm out agreement
- 18 Mar
Prairie estimated an exploration target of 90-130Mt of coal at the new Sawin-Zachód concession, with a 1.2m seam cut-off. It is conceptual and not a JORC resource, but could extend mine life at the Lublin project. Limited drilling is planned next.
resource reserve update
- 3 Feb
Prairie was granted a new 100%-owned concession, Sawin-Zachód, adding 54km2 to take the Lublin project area above 235km2. Historical drilling of 23 cored holes found over 17 coal seams. Initial payment was PLN 60,600 (~A$21,664); one borehole is required by end-2015.
asset acquisition disposition
2014
- 17 Nov
Polish Ministry of Environment rejected Bogdanka's appeal over the K-6-7 concession, confirming Prairie's exclusive right to apply for a mining concession there. Bogdanka plans a court complaint, which Prairie says would not affect its concession rights. Resolves the September rejection's open appeal question.
regulatory community update
- 11 Sept
Tom Todd, ex-CFO of Aston Resources, joins as non-executive director with Todd Hannigan as alternate, and receives 1.4m options at 45c. Their vehicle T2 Resources buys 2.8m existing shares from Taso Arima, so no new capital is raised.
director officer appointment
- 10 Sept
Polish Ministry of Environment formally rejected Bogdanka's application for a mining concession over Prairie's K-6-7 concession, one of its four Lublin concessions, saying it would undermine Prairie's usufruct rights. Bogdanka may appeal, so the threat is not fully closed.
regulatory community update
- 4 Sept
Pre-feasibility study for Lublin has started, with Golder Associates as lead consultant and Royal HaskoningDHV jointly appointed after a tender. Targeted drilling will upgrade the resource. Completion remains due in the first half of 2015, as previously flagged.
material agreement
- 28 Aug
Final hole of the seven-hole drilling program is being completed, satisfying the minimum works required under the Lublin concessions, reportedly almost a year early. Geological Documentation is to be lodged December 2014 or January 2015 to start the mining concession path. Remaining three holes' results pending.
regulatory community update
- 28 Apr
Scoping study on Lublin shows up to 6.7Mtpa saleable coal over 22+ years, steady-state operating cash cost of US$37/t and average EBITDA of US$332m a year (peak US$391m). It is preliminary, partly based on Inferred resource (26%). Pre-feasibility study to start, due first half 2015.
resource reserve update
- 13 Mar
Washability tests on the first four Lublin core holes show clean-coal yields of 75-97%, ash of 2.0-2.7% and calorific values of 7,526-7,830 kcal/kg for the 391 seam (327Mt Inferred). Builds on October's coal quality results; scoping study still due in the first half of 2014.
drilling result
- 13 Feb
Agreement signed with Poland's Ministry of Environment for rights to further historical exploration data, a prerequisite to start mine permitting. Consultant GEO-EKO-WIERT is preparing geological documentation due within 12 months. Data is expected to support a resource upgrade.
regulatory community update
2013
- 24 Dec
Placement of up to 13.5m shares at 27c to raise up to $3.645m, led by CPS Capital, to accelerate Lublin exploration and provide working capital. The price is below the 50c April 2013 raise and the 37c November market price in the presentation.
capital raising announcement
- 31 Oct
First coal quality tests on Lublin cores show the 391 seam (327Mt Inferred) has 4.4% ash, 7,558 kcal/kg and a Free Swell Index of 5.5, indicating semi-soft coking coal potential. Confirms historical data; washability testing continues. Scoping study still due early to mid-2014.
drilling result
- 24 July
A scoping study on Lublin has started, run by Wardell Armstrong International, covering a revised resource, mining scenarios and costs. Completion is expected in the March 2014 quarter, then a pre-feasibility study and offtake talks. Follows the May drilling start and the CEO's arrival.
material agreement
- 20 May
Ben Stoikovich, a London-based mining finance executive and former longwall mining engineer, is appointed CEO and director from 17 June 2013. Pay is £225,000 plus up to £80,000 bonus, with 4.5m options at 35c-60c. Fulfils the planned senior appointments.
director officer appointment
- 6 May
Drilling started on an initial seven-hole core program at the 100%-owned Lublin project, to update coal quality and washability data. A scoping study is expected to start by June 2013. No results yet.
drilling spud
- 2 Apr
Placement of 12m shares at 50c to raise A$6m from institutions in Australia, Europe and Asia, led by Investec with Hartleys. Funds go to Lublin drilling, mining studies and working capital. Resolves the suspension; adds new shares to the register.
capital raising announcement
- 14 Feb
Wardell Armstrong estimated a maiden Inferred coal resource of 1.576 billion tonnes at the 100%-owned Lublin project, up from the 1.1-1.3Bt Exploration Target. 679Mt sits in three main seams; average 6,484 kcal/kg, 12.2% ash. A drilling contractor is being finalised for early to mid-2013.
resource reserve update
2012
- 8 Nov
Wardell Armstrong estimated an initial Exploration Target of 1.1-1.3 billion tonnes of thermal coal at Lublin, from over 200 historical boreholes. It is conceptual, not a resource. A first JORC coal resource estimate is expected by end of March quarter 2013.
resource reserve update
- 4 Sept
Taso Arima, a Coalspur co-founder, joins as Executive Director from mid-September 2012. He will take a placement of 3.0m shares at 30c ($900,000) with one-for-two 40c options expiring 2016. Funds go to Prairie Downs and the Polish coal project.
director officer appointment
- 9 Aug
Prairie secured four coal licences covering 182km² in Poland's Lublin Coal Basin, next to the Bogdanka mine. A new direction after Ivernia's exit. The first step is reviewing 1970s-80s government data, with drilling possible later; no resource exists yet.
asset acquisition disposition
- 13 June
Ivernia withdrew immediately from the Prairie Downs earn-in without earning any interest, so Prairie again owns 100%. This ends the June 2010 deal, which would have brought $10m. Prairie cites about $12m in cash and listed securities and will assess options.
material agreement termination
2011
- 24 Aug
Plans to raise about $2.25m via a placement of up to 22.5m shares at 10c, with 13.75m attaching 15c options expiring 2015. Ian Middlemas becomes Chairman, and Shervington and Hall resign. Funds go to exploration, Papillon option exercise and new projects.
capital raising announcement
- 12 July
Ivernia completed its $2m minimum spend within 12 months and intends to spend a further $1m over six months. That would earn it the option to buy 60% of Prairie Downs for $10m in cash or shares. Continues the June 2010 earn-in.
joint venture update
- 15 June
Phase Two (20 holes) confirmed high grade at Wolf: 13m at 6.5% zinc, 6.1% lead and 162g/t silver in PDP404, and 14.4m at 7.7% zinc and 6.2% lead in PDD410. Zinc mineralisation about 100m thick over 1km suggests a large system.
drilling result
- 21 Jan
Ivernia's phase one drilling (30 RC holes, 3,258m) found a new high-grade zone at Wolf: 8m at 11.1% zinc, 8.0% lead and 73g/t silver in PDP379, within a broad low-grade halo. Resolves the awaited results; further drilling is planned.
drilling result
2010
- 19 Oct
Ivernia began reverse circulation drilling at Prairie Downs: at least 20 holes (about 3,000m) testing the Wolf Prospect and footwall of the existing resource, taking three to four weeks. First drilling under the Ivernia deal; results to follow.
drilling spud
- 7 July
Gordon Barratt joins as non-executive director. John Welborn's Managing Director role ends 6 August 2010 because Ivernia will manage exploration; he stays as a non-executive director. A management restructure following the Ivernia deal.
director officer appointment
- 15 June
Binding heads of agreement with Ivernia (TSX-listed): it must spend at least $2m on exploration within 12 months, and can earn 60% of Prairie Downs for $10m cash or shares after $3m spend over 18 months. A further $5m could lift it to 80%. Resolves the JV talks.
farm in farm out agreement
- 8 June
Optiro's updated Prairie Downs resource is 3.0m tonnes at 4.9% zinc, 1.6% lead, 15g/t silver, down from 4.7m tonnes at 6.3% zinc. Inferred tonnage fell from 2.4m to 0.7m; indicated rose slightly to 2.28m tonnes. Resolves the pending resource update, with a smaller headline resource.
resource reserve update
- 5 Mar
Soil survey (922 samples) found 22 targets, 8 high priority, along 20km of the fault, including the Wolf Prospect 2km from the main resource. Drilling is being planned. These are soil anomalies, not drilled discoveries, so the base metals resource is unchanged.
drilling result
2009
- 21 Dec
Prairie will receive 5m Colonial Resources shares and 5m 15c options as a fee for finding and nominating Colonial as buyer of Malian gold assets (US$5m price). Also, licence E52/1758 was extended two years to December 2011, and the office moved.
asset acquisition disposition
- 4 Feb
John Welborn, a chartered accountant and former Investec lender, is appointed Managing Director, ending the search since Mark Hansen left. He gets 4m options at 10c, subject to shareholder approval.
director officer appointment
2008
- 16 Oct
Costean Seven assays show only intermittent narrow base-metal intercepts (up to 19.5% lead, 0.9% copper), below the surface copper grades. Company also reports surface vanadium above 1% V2O5 over 3.7km; 25 pre-collars are done at Main and Zed, with results due November.
drilling result
- 2 Oct
Mark Hansen resigned as a director, following the August end of his Managing Director agreement. The company intends to appoint a replacement non-executive director once a candidate is found.
director officer appointment
- 19 Aug
The executive services agreement providing Mark Hansen as Managing Director has been terminated. He stays on as a non-executive director. No reason is given.
director officer appointment
- 29 July
June 2008 quarter: feasibility study complete for a 500,000tpa zinc-silver-lead plant. Capex is $86m including infrastructure (earlier plant-only estimate was $43m); commissioning December 2010. Five Costean Seven holes did not find the source of the surface copper; most missed target depth.
quarterly activities report
- 27 June
A diamond rig arrived and began drilling at Costean Seven, the first hole of the planned 20,000m programme to define a first copper resource. An RC rig is expected next month; at least two rigs are planned to run to year end.
drilling spud
- 23 May
Mapping links copper from Costean Seven to the Main Lode: 3.7km of copper mineralisation, open both ways, of 17km prospective. Lab assays confirm Costean Seven (7m at 7.4% copper, 1g/t gold, 34.2g/t silver); bornite suggests a possible premium concentrate.
drilling result
- 6 May
Second copper discovery at Kerrs Find, 500m southeast of Costean Seven: 152 rock chip samples (handheld XRF) returned copper up to 29.4% and lead up to 19.5%. Company sees Mt Isa-style similarities; drilling of the planned 20,000m programme expected from June, subject to rig availability.
drilling result
- 17 Apr
Surface sampling at Costean Seven, the 3.2km-west prospect first flagged for lead, found copper: a 7m channel averaged 5.6% copper, 0.9% lead. Company calls it a spectacular discovery and makes copper a priority target; drilling starts when a rig is available.
drilling result
- 13 Feb
Resource updated to 4.7m tonnes at 6.3% zinc, 1.8% lead (down from 4.9m t at 5.4% zinc in August). A new high-grade subset is 1.6m tonnes at 12.3% zinc. Company says it should cover five years at 300,000tpa.
resource reserve update
- 17 Jan
Final 2007 results, e.g. Main PDP301 4m at 11.0% zinc, 6.4% lead. East and Main Lodes are continuous and now called Main Lode; Zed lies beneath it. Resource update due mid-February, also the basis for the first reserve; drilling resumes in March.
drilling result
2007
- 15 Nov
New high grades include Main PDP247 4m at 12.4% zinc and East PDP252 2m at 11.5% zinc, plus a new lead find in outcrop at Costean 7, 3.2km from Main Lode (up to 16.6% lead, surface only). Resource update expected early December; a Costean 7 drill test is planned.
drilling result
- 4 Oct
A Bankable Feasibility Study began, with Abesque Engineering designing a 300,000tpa plant expandable to 1m tpa; about 6 months for the study, then 12 months to build. Resource target raised to 10m tonnes; initial capex estimated at A$70-90m (vs $55m scoping); production targeted 2009. No new ball mill order yet.
material agreement
- 4 Sept
Routine secondary trading notice for the 6m placement shares. It discloses that an unnamed Australian listed company has made a very preliminary takeover or merger approach; no pricing discussed, no proposal in contemplation, and no assurance any offer will emerge.
other
- 29 Aug
Resource rose to 4.9m tonnes at 5.4% zinc, 2.0% lead, 14g/t silver (269,000t zinc) from 1.03m tonnes, including 2.5m tonnes at 7.3% zinc. Company says it supports a 250,000tpa mine; ball mill order expected September and decline procedure started.
resource reserve update
- 8 Aug
Charlie Karelse, former Mining Manager at MIM's McArthur River zinc-lead mine, was appointed Chief Operating Officer to lead the shift from explorer to miner. The updated resource is expected this month.
director officer appointment
- 25 July
Placement of 6.0m shares at $0.91 to raise $5.46m before costs, via Southern Cross Equities institutional clients, subject to shareholder approval around 27 August. Funds cover exploration, an exploratory decline, early ball mill purchase and working capital. The January placement was at 45c.
capital raising announcement
- 12 July
Diamond hole PDD196 found a new zinc lode below Zed (7.1m at 11.0% zinc, 4.3% lead) and the first economic copper at the project (3.4m at 2.8% copper). Drilling restarted this week, targeting Zed extensions.
drilling result
- 26 June
Final RC assays of the program found two new lodes, one above Main Lode West and one above Zed, e.g. PDP187 5m at 9.8% zinc. Zinc now spans 1.1km of strike. Seven diamond holes are still awaited.
drilling result
- 31 May
Scoping studies found mechanised underground mining of Main and East Lodes economically feasible. Capital cost is estimated at $55m for a 250,000tpa operation, with first-year grade of 11% zinc. This resolves the scoping study awaited since March; an exploratory decline and early ball mill purchase are being considered.
investor presentation
- 8 May
First 2007 assays: Zed Lode hole PDP168 hit 22m at 4.3% zinc, 3.5% lead, including 2m at 25.2% zinc. Zed may continue the Main Lode, which would give over 1km of mineralisation. Diamond drilling is brought forward and ball mill financing talks begun, with mining targeted by 2009.
drilling result
- 21 Feb
Western Uranium signed a JV on the Jillary Uranium Project, on the eastern part of Prairie Downs tenements. It can earn 50% by spending $350,000 and 85% with a further $400,000. Prairie Downs keeps 15% free carried to decision to mine.
farm in farm out agreement
- 22 Jan
Placement of about 5.6m shares at $0.45 to raise about $2.5m via ABN AMRO Morgans, funding Prairie Downs drilling and the scoping study. Drilling to resume next month, aiming to double the 1m tonne resource.
capital raising announcement
- 10 Jan
Lycopodium Engineering engaged for a scoping study on a smaller ~250,000tpa operation making ~20,000tpa zinc, using the 1m tonne resource plus Zed Lode. Results due by early March; they will decide between expansion drilling and development drilling.
material agreement
2006
- 6 Dec
First Zed Lode assays: hole PDP157 hit 16m at 5.1% zinc, including 6m at 10.1% zinc. Lode is wider than other lodes and may link to Gabbro Lode. Company says it is on track for the 2m tonne target; no resource has been booked.
drilling result
- 23 Nov
RC drilling found a new zinc lode, Zed Lode, 170m west of Main Lode. Only 2,948m of the planned 4,000m was drilled due to rain and rig breakdowns. East Lode best result 3m at 10.8% zinc; the Zone 2 anomaly was not intersected. Target remains 2m tonnes.
drilling result
- 16 Oct
RC drilling began 16 October at Prairie Downs, testing extensions to the Main, East and Gabbro Lodes and Zone Two. About 4,000m runs to November, then a further 6,000m after the rig visits Coppermine Bore. Follows the earlier delay.
drilling spud
- 25 Sept
Western Uranium (ASX: WTN) lists on 26 September after raising $3.0m. It can earn 50% of Coppermine Bore for $1m, and a further 25% for $2m, leaving Prairie Downs 25% free carried. First drilling awaits a rig.
joint venture update
- 10 July
Resource upgraded to 1.03m tonnes at 8.3% zinc, 1.7% lead, 22g/t silver, up from 5.7% zinc previously. All Main Lode (802,000t at 8% zinc) is now Indicated. East Lode is a new high-grade 11.9% zinc. Next drilling is August.
resource reserve update
- 6 June
Drilling completed with best Main Lode hits like 8m at 10.1% zinc; results suggest higher grade. New East Lode found, and hole PDP117 hit a 50m-wide zone of zinc mineralisation that may be a primary source. Resource update expected within weeks.
drilling result
- 5 June
Sempra Metals & Concentrates agreed to invest $2m by placement at a minimum $0.60 per share, with up to $6m more in convertible notes. Sempra will buy all concentrate under an offtake subject to due diligence, and receive 4m options at $0.80 or more.
material agreement
- 4 May
Company intends to joint venture Coppermine Bore with Western Uranium, which would earn 50% for $1m spend and a further 25% for $2m, leaving Prairie Downs 25% free carried. Western Uranium plans a $2.5m listing. Prairie Downs wants to focus on zinc.
farm in farm out agreement
- 14 Mar
Main Lode resource upgraded to 820,000t at 6.8% zinc, including 300,000t Indicated, replacing the earlier 500,000t at 13.1% Inferred. Tonnage is higher, grade lower, metal similar. Two new lodes found and metallurgical testwork looks encouraging.
resource reserve update