Geovic spent years designing its Cameroon cobalt-nickel-manganese mine, but financing never arrived, and by August 2014 it faced delisting, costly related-party loans and a small equity line.

2007-2011: Designing the Nkamouna mine

Geovic's main project was Nkamouna, a cobalt-nickel-manganese deposit in Cameroon held through Geovic Cameroon (GeoCam), then 60% owned. In October 2007 it said a final feasibility study was due that November, with production targeted for the second quarter of 2010. The study arrived in December 2007, prepared by Washington Group International. It put pre-production capital at $398 million, up from $129 million in an earlier 2006 study, while the after-tax return fell from 77% to 33%. Major construction was pencilled in for mid-2008, subject to debt financing and permits.

That timetable did not hold. In November 2008 Geovic reported cash of $73.3 million, helped by a $15.2 million contribution from Cameroonian minority shareholders in GeoCam, but said financing and construction would be delayed by turmoil in credit and capital markets. It added that it did not expect to need the equity markets in the foreseeable future. In October 2009, after a 2008 drilling program of 2,045 holes, estimated mineralized material at Nkamouna and Mada rose 97% to 120.6 million tonnes, and GeoCam was now described as 60.5% owned.

The updated study slipped again in December 2010, with capital now expected at $600-$650 million. In April 2011 the final study by Lycopodium arrived: reserves of 68.132 million tonnes, initial capital of $617.2 million, an after-tax value of $669.6 million at an 8% discount rate (Geovic's share $405.1 million) and a 22% return. The refinery was dropped in favour of selling a mixed sulfide product. Financing was to be secured later in 2011, with construction planned for early 2012. Shares on issue rose only modestly over this period, from 104.3 million at the end of 2010 to 106.4 million in 2011, and the record does not explain the change.

2012-2014: Borrowing, delisting and a sale pending

The record is quiet for 2012 and most of 2013, and the project financing planned for 2011 does not appear to have been completed. Shares on issue stood at about 106.7 million by the end of 2013. In October 2013 the company disclosed its first debt in the record: $120,000 of one-year notes issued to related parties, including Richard G. Buckovic and Norman C. Rose, father of director Paul D. Rose. A further $100,000 followed in November. The notes carried interest of 200% a year and had to be prepaid within five business days after the announced acquisition of Geovic's 60.5% GeoCam stake by Jiangxi Rare Metals Tungsten Holdings Group. Completion of that sale is not confirmed.

The notes drew regulatory attention. On May 1, 2014 the Toronto Stock Exchange opened a review, saying it had not approved the notes, the key terms had not been announced, and it did not consider the interest rates commercially reasonable. On June 2 it decided to delist the shares effective at the close of market on July 3, 2014, citing financial condition, working capital, capital structure, compliance and disclosure.

On July 22, 2014 Geovic signed with Tangiers Investment Group an agreement to buy up to $3.0 million of stock over 36 months, at 85% of a recent low average price, subject to an effective SEC registration. Geovic also issued a $44,000 convertible note, convertible at 50% of a recent low trading price, and owed commitment-fee shares. As of August 8, 2014, the Jiangxi sale remained unconfirmed, and no share counts for the new issues had been given.

Written from the 11 story beats below (2007 to 8 Aug 2014), which come from the company's own announcements and filings.

Beat by beat

The events that changed the company's story, in plain English, each written against everything known about the company at the time. The dot shows whether it was good, bad or neutral for shareholders.

shares on issue market cap (log scale)

2014107m shares · US$1.6m market cap

  1. 8 Aug

    On July 22, 2014 Geovic signed agreements with Tangiers Investment Group, LLC under which Tangiers committed to buy up to $3.0 million of Geovic common stock over 36 months, in requests of up to $100,000 each at 85% of the lowest daily volume weighted average price in the five trading days after a request. Sales depend on an effective SEC registration. Geovic also issued Tangiers a $44,000 4% convertible note due July 22, 2015 for $40,000 in cash, convertible at 50% of the lowest trading price in the prior 20 trading days, and must issue commitment-fee shares equal to 2.5% of the $3.0 million. For shareholders, the filing's terms mean new shares would be issued below market price (85% for the stock purchases, 50% for the note conversion), which would dilute existing holders; this is an inference, as the filing gives no share counts.

    debt financing

    107m shUS$1.6m
  2. 3 June

    The Toronto Stock Exchange told Geovic on June 2, 2014 that it has decided to delist the company's shares, effective at the close of market on July 3, 2014. The TSX cited failure to meet continued listing requirements on financial condition and/or operating results, working capital and capital structure, compliance with the listing agreement, and disclosure. This resolves the review opened May 1, 2014 against the company; the filing does not say what happens to the OTCBB quotation (GVCM), which the press release still lists.

    listing compliance notice

    107m shUS$3.4m
  3. 5 May

    The Toronto Stock Exchange notified Geovic on May 1, 2014 that it is reviewing whether the company can stay listed, and gave it until June 3, 2014 to show compliance or face delisting within 30 days after. The TSX says the review concerns the related-party promissory notes issued in 2013 and the first quarter of 2014: no prior TSX approval or disinterested shareholder approval was sought, the key terms were not announced, and it does not consider the interest rates commercially reasonable. Geovic says it will make written submissions to the TSX. This puts the TSX listing at risk because of the related-party notes described in the October and November 2013 filings.

    listing compliance notice

    107m shUS$4.9m

2013107m shares · US$5.3m market cap

  1. 6 Nov

    Geovic issued a further $100,000 of one-year notes (due October 31, 2014) to Richard G. Buckovic and director Paul D. Rose, again at 200% annual interest. These notes also must be prepaid within five business days after the Jiangxi Rare Metals Tungsten Holdings acquisition of Geovic's 60.5% Geovic Cameroon stake. This continues the related-party borrowing begun in September 2013.

    debt financing

    107m shUS$5.3m
  2. 4 Oct

    Geovic issued $120,000 of one-year promissory notes (due September 30, 2014) to Richard G. Buckovic, Norman C. Rose and M N Rose Credit Shelter Trust; Mr. Rose is the father of director Paul D. Rose. The notes carry interest of 200% per annum and must be prepaid within five business days after the previously announced acquisition of Geovic's 60.5% interest in Geovic Cameroon by Jiangxi Rare Metals Tungsten Holdings Group. This is the first debt in the record and shows a pending sale of the Cameroon stake to Jiangxi, which the earlier context did not mention.

    debt financing

    107m shUS$5.7m

2011104m shares · US$61.7m market cap

  1. 19 Apr

    Geovic said the final Nkamouna feasibility study (by Lycopodium) was received and accepted by it and by Geovic Cameroon, resolving the thread that slipped to end-April 2011. It shows proven and probable reserves of 68.132 million tonnes, initial capital of $617.2 million, an after-tax NPV of $669.6 million at an 8% discount rate (Geovic's 60.5% share $405.1 million) and a 22% after-tax IRR. The refinery is dropped from the plan, with a mixed sulfide product to be sold instead. Financing is to be secured later in 2011, with construction planned for early 2012.

    resource reserve update

    104m shUS$61.7m

2010

  1. 21 Dec

    Geovic said the updated Nkamouna feasibility study will not finish by end of 2010 as planned, and is now projected for end of April 2011. Initial capital plus working capital is now expected around $600-$650 million, versus a $417 million estimate in the September 2008 study, excluding a refinery that would cost at least $150 million more; deferring the refinery is being considered. This continues the earlier project delay and the mid-2010 update timing given in October 2009 has slipped.

    resource reserve update

2009

  1. 16 Oct

    Geovic reported that, after a 2008 drilling program of 2,045 holes, estimated mineralized material at Nkamouna and Mada combined rose 97% to 120.6 million tonnes. This is non-reserve material (includes existing reserves), not proven reserves; updated reserve estimates are expected in early 2010 and a Feasibility Study Update by mid-2010. GeoCam is now described as 60.5% owned.

    resource reserve update

2008

  1. 14 Nov

    Geovic announced it filed its third-quarter 2008 report: cash rose to $73.3 million, helped by a $15.2 million contribution from Cameroonian minority shareholders in GeoCam. It said debt and equity financing and construction for Nkamouna will be delayed because of turmoil in commodity, capital and credit markets, reversing the mid-2008 construction timing in the 2007 plan. The company says it does not expect to need the equity markets in the foreseeable future.

    auditor change

2007

  1. 5 Dec

    Geovic reported the Nkamouna feasibility study, prepared by Washington Group International, delivered as promised in the October filing. Compared with the 2006 pre-feasibility study, it shows pre-production capital of $398 million (up from $129 million), after-tax IRR of 33% (down from 77%), and higher annual cobalt (9.2 million lb) and nickel (7.0 million lb) output. GeoCam plans a further optimization study to cut costs, with major construction starting mid-2008 subject to debt financing, board approvals, a water use permit and a land lease.

    resource reserve update

  2. 15 Oct

    Geovic said its 60%-owned Geovic Cameroon (GeoCam) expects to release the Final Feasibility Study for the Nkamouna cobalt-nickel-manganese project in November 2007. The study assumes processing 2,000 tonnes of concentrate per day, 33% above the 2006 pre-feasibility study, and capital costs are stated to be significantly higher than in that earlier study. Production is targeted for the second quarter of 2010, with a construction contract to be awarded by December 2007.

    resource reserve update