Each one in plain English, with the numbers worked through for a shareholder.
18 June 2026drilling result▲ Good
Endeavour reported high-grade silver and gold drill results at its Terronera operation, now past the commercial production announcement of October 2025. Only the headline and cover form are shown, so no results are given.
Endeavour reported high-grade silver-lead-zinc drill results at its Kolpa operation, the asset acquired in May 2025. Only the headline and cover form are shown, so no results are given.
Endeavour said its 2024/2025 Pitarrilla drill program continues to confirm high-grade structures, building on the project acquired in 2022. Only the headline and cover form are shown, so no results are given.
Endeavour reported more high-grade polymetallic drill results in the San Patricio vein system at Parral, continuing earlier Parral reports. Only the headline and cover form are shown, so no results are given.
Endeavour reported continued high-grade drill results at the Guanacevi mine, including 3.43 g/t gold and 1,265 g/t silver, or 1,540 g/t silver equivalent, over 2.2 metres. The grades come from the headline; other results are not shown.
This is the filing that carries the amended NI 43-101 feasibility study report for Terronera, plus consents from eight qualified persons. The filing only lists exhibits, so no figures are given.
Endeavour filed an amended technical report for the Pitarrilla project, amending the one filed in December 2022. Only the title and cover form are shown, so what was changed is not given.
Endeavour filed the NI 43-101 technical report with updated mineral resource and reserve estimates for the Guanacevi project in Durango, with consents of three qualified persons. The filing only lists exhibits, so no figures are given.
Endeavour filed the NI 43-101 technical report with updated mineral resource and reserve estimates for the Bolanitos project in Guanajuato, with consents of three qualified persons. The filing only lists exhibits, so no figures are given.
Endeavour announced the filing of NI 43-101 technical reports for the Guanacevi and Bolanitos mines, the 2023 update to the reports filed in January 2022. Only the title and cover form are shown, so no resource or reserve figures are given.
Endeavour announced an initial mineral resource estimate and filed an NI 43-101 technical report for the Pitarrilla project in Durango, the project it announced acquiring in January 2022. Only the title and cover form are shown, so the resource figures are not given.
Endeavour reported that it continues to intersect positive drill results at the Parral project, building on the December 2021 and April 2022 reports. Only the title and opening line are shown, so no results are given.
Endeavour reported more positive drill results for the Parral project, continuing the December 2021 report. Only the title and cover form are shown, so no results are given.
Endeavour announced the filing of NI 43-101 reports on the Guanacevi and Bolanitos projects, the press release behind the two technical reports filed the same day. Only the title and cover form are shown, so no resource or reserve figures are given.
Endeavour filed an NI 43-101 technical report with updated mineral resource and reserve estimates for the Guanacevi project in Durango. The filing only lists exhibits, so no figures are given.
Endeavour filed an NI 43-101 technical report with updated mineral resource and reserve estimates for the Bolanitos project in Guanajuato. The filing only lists exhibits, so no figures are given.
Endeavour reported positive drill results for the Parral project. Parral has not appeared in the earlier context, so this is a new property in the story; how Endeavour holds it is not shown. Only the title and cover form are shown, so no results are given.
Drilling intersected high-grade silver-gold mineralization at the Guanacevi and Bolanitos operations, continuing the 2020-2021 drilling programs. Only the title and cover form are shown, so no grades or widths are given.
Endeavour announced the filing of the NI 43-101 technical report on the Terronera feasibility study in Jalisco. Only the title and cover form are shown, so economics, reserves and capital cost are not given. It accompanies the technical report filed the same day.
Endeavour filed the NI 43-101 technical report on the Terronera feasibility study (with consents of the qualified persons), the study awarded to Wood plc in September 2020. This filing only lists the exhibits; the study's results are not shown in the text.
Drilling intersected high-grade silver-gold mineralization in multiple veins at the Terronera project in Jalisco, which is going through a feasibility study. Only the title and cover form are shown, so no grades or widths are given.
Drilling intersected high-grade gold-silver mineralization at the Bolanitos mine, continuing the drilling reported there since 2020. The headline places Bolanitos in Durango, but it was earlier recorded as being in Guanajuato; this is a discrepancy in the headline. Only the title and cover form are shown, so no grades or widths are given. The signatory on this filing is now Dan Dickson as CEO.
Drilling intersected high-grade silver-gold mineralization at the Guanacevi mine in Durango, continuing the exploration there reported in 2020. Only the title and cover form are shown, so no grades or widths are given.
Endeavour reported updated mineral reserve and resource estimates for 2020. Only the title and cover form are shown, so no figures are available to compare with earlier estimates.
Drilling intersected high-grade gold-silver mineralization at the Bolanitos mine. Only the title and cover form are shown, so no grades or widths are given.
Drilling continues to hit high-grade gold-silver mineralization at Guanacevi in Durango. Only the title and cover form are shown, so no grades or widths are given.
Endeavour appointed Don Gray as COO and awarded the feasibility study for Terronera to Wood plc. Only the title and cover form are shown, so the study scope, cost and timing are not given. This moves Terronera beyond the prefeasibility stage.