Each one in plain English, with the numbers worked through for a shareholder.
5 Aug 2026auditor change● Neutral
On August 5, 2026 the company formally engaged CBIZ CPAs P.C. as its independent auditor for the fiscal year ending November 30, 2026, after the audit committee approved it on August 4. The filing says there were no disagreements or reportable events with CBIZ and it does not name a prior auditor or give a reason for the change. The attached press release says the Aurora Uranium Project pre-feasibility study is scheduled for completion in late 2027.
On February 24, 2026 the merger of the SPAC Spring Valley Acquisition Corp. II with Eagle Energy Metals Corp. closed, making Eagle Nuclear Energy Corp. (Nevada) the listed parent. Eagle stockholders received 23,350,000 new shares plus up to 1,500,000 earn-out shares if the stock trades at $16.00 or more (VWAP) for 20 of 30 trading days within five years; redemptions of 1,803,227 public shares cost about $21.8 million from the trust, leaving 29,580,033 shares outstanding. The company also got $29.7 million from selling 29,700 Series A convertible preferred shares with 2,500,000 warrants, acquired Oregon Energy LLC under its option agreement with Aurora Energy Metals, and began trading on Nasdaq as NUCL and NUCLW on February 25, 2026.
On February 23, SVII shareholders approved the Eagle merger agreement (8,135,098 shares for, 71,722 against) and all other proposals voted on, including advisory governance changes limiting some shareholder powers. The deal had not closed and still required conditions including Nasdaq listing approval.
Eagle filed another promotional article published on its behalf, repeating the February 23 vote, the planned Nasdaq symbols NUCL and NUCLW, the BBA hire and the Aurora resource figures. It says nearby Cordex could add to the resource as old drill data is digitized, but gives no Cordex estimate. It also labels Eagle "NASDAQ: SVIIF," although SVIIF is SVII's over-the-counter symbol and the Nasdaq listing still depended on the merger closing.
Eagle filed its social media communications along with a February 18 Wall Street Journal article on tightening uranium supply that quotes CEO Mark Mukhija on U.S. reliance on foreign uranium. The article says first production from the Aurora project in southeastern Oregon is expected in 2032. This is a long-range expectation, and the text provided gives no supporting schedule or cost.
Eagle filed a promotional article published on its behalf that gives February 23 as the date of the shareholder vote on the merger. It also repeats the effective registration, the BBA drilling-design hire and the existing Aurora resource figures. The portion provided shows no new project results, and its news about other nuclear companies, including a federal award to Centrus, is not about Eagle.
Eagle filed a notice covering posts it made on LinkedIn and X on February 2. The text provided doesn't show what the posts said. The visible merger background repeats that the registration statement is effective and the final proxy has been filed, with no new deal terms.
The SEC declared the merger registration statement effective on January 30, 2026, and Spring Valley II (SVII), the shell company merging with Eagle, filed its final proxy statement on February 2. This is a key step in the merger announced in 2025, clearing the way for SVII shareholders of record on January 5 to vote, although the deal had not yet been approved or completed.
Eagle filed a further promotional article published on its behalf, this one focused on U.S. federal nuclear funding, which again repeats the BBA hire and Aurora resource figures. The federal awards it highlights include one to another company, Centrus, and the portion provided reports no award to Eagle. It gives the expected ticker as both "NUCLR" and "NUCL," while earlier company releases used NUCL.
Eagle filed another article published on its behalf that ties AI power demand to nuclear energy and repeats the BBA hire and Aurora resource figures. The portion provided shows no new Eagle development; although the article calls Eagle a "uranium miner," it also describes drilling still being designed for an eventual pre-feasibility study.
Eagle filed a promotional news commentary issued on its behalf that links AI-driven power demand to uranium and repeats the BBA drilling-design hire and the existing Aurora resource figures. It cites over 500 drill holes at Aurora and over 100 at nearby Cordex; the operating results it reports for other uranium companies are not Eagle's.
Eagle hired BBA USA, which wrote the August 2025 Aurora resource report, to design a limited drilling campaign for an eventual pre-feasibility study. The work is meant to support processing, water and rock studies, raise confidence in the resource and expand it, which is a next step for the project. The text provided gives no cost or drilling dates, and no new drill results.
Eagle filed a January 5 TheInvestmentJournal.com piece that promotes demand for small nuclear reactors and uranium and presents Eagle as positioned to benefit. The portion provided adds no new company development, and its investment claims are the article's own.
In a Canadian Mining Journal interview, CEO Mark Mukhija said merger proceeds are planned for company and deal costs, mining work and early reactor development, with the Aurora uranium project the near-term driver; the text provided gives no dollar split. He said cultural studies had started and aimed to begin pre-feasibility work by the end of 2026 and complete the study by 2027, with a definitive feasibility study starting in 2028. This wording differs from the earlier target of starting pre-feasibility in the second half of 2026.
Eagle filed a December 5 Mining.com article, which it shared on social media, about the appointments of its new finance, operations and reactor licensing leaders, already announced on December 2. The text provided shows no new deal terms or project results.
Ahead of the planned Nasdaq listing, Eagle named Ajay Toor as Chief Financial Officer, Vishal Gupta as VP of Operations and Benjamin Egnew as Head of Reactor Licensing, adding finance, mining and nuclear licensing experience. The release also describes the deposit as the largest "open pit-constrained" measured and indicated uranium deposit in the U.S., a narrower wording than the November 12 release used.
Eagle filed a podcast excerpt in which Spring Valley II's CEO describes his general approach to SPAC deals, including a focus on having two years or more of cash at closing and using cash on hand and/or private investment to offset shareholder redemptions. The excerpt gives no new terms or funding amounts for the Eagle merger.
Eagle filed a reposted Mining.com article repeating the November 12 Aurora test results, including high-80% uranium recovery and what the article calls an approximately 60% cut in acid use. It adds no material new company information in the text provided.
Eagle reported test results announced by Aurora Energy Metals: uranium recovery in the high-80% range, matching prior best results, with less acid and a leach time of about 12 hours instead of 24, which the release says strengthens the project, though it gives no dollar savings. It lists 32.75 million pounds of Indicated and 4.98 million pounds of Inferred resource, below the "over 50 million pounds" in earlier reposted articles; this release does not reconcile the two.
Eagle filed the transcript of an August Fox Business interview that it reposted on social media, in which its CEO promotes the Aurora uranium rights and reactor designs of up to about 3 and 33 megawatts. He says baseline environmental and cultural studies come next, followed by permitting; the interview announces no new deal terms.
A reposted Mining.com article about the pending merger puts the combined company's pro forma equity value at $312 million and describes Eagle's uranium deposit and small reactor technology, which it says was developed at the University of New Mexico. It says Eagle is focused on environmental and cultural baseline studies and plans to start a pre-feasibility study in the second half of 2026.
Eagle filed a reposted Hart Energy article on its planned merger with the SPAC Spring Valley II, and the filing notes the deal was restructured on September 29, 2025 to add a new parent company, Eagle Nuclear Energy Corp. The article cites over 50 million pounds of uranium at Aurora and reactor technology Eagle is working to license, says Eagle had not done its own exploration at the site, and says any firm annual production figure would probably await a pre-feasibility study.