Each one in plain English, with the numbers worked through for a shareholder.
5 Oct 2022annual report● Neutral
Audited full-year accounts to 30 June 2022 lodged, which is the overdue periodic report behind the 3 October suspension. The extract shown covers only contents and directors' details, so no financial figures are visible here.
John Smith, previously Company Secretary/CFO from 2013-2021, is reappointed Company Secretary/CFO; Mark Ohlsson is terminated as Company Secretary. This fills the open CFO succession thread. Shares on issue are shown as 539.8m.
ASX will lift the suspension from the start of trading on 6 October 2022, after Dateline lodged its full-year accounts. This resolves the suspension that began on 3 October.
ASX suspended Dateline's shares from 3 October 2022 for failing to lodge its periodic report by the due date. The text does not say which report. Shareholders cannot trade until it is lodged.
19 Aug 2022capital raising announcement● NeutralMajor
Placement of 62.5m shares at $0.10 to raise $6.25m, a 17% discount, with 15.625m options at $0.135 over three years. Funds go to Colosseum gold and rare earths exploration and working capital. Part needs shareholder approval at a late September meeting.
What it means for a shareholder
62.5m new shares at $0.100 to raise about $6.3m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
A gravity survey found a dense unit about 1km from the Colosseum pit, over 2,000m of strike and 150-250m deep, with density similar to Mountain Pass carbonatite. Company is planning rare earth drill testing. It is a target, not a discovery.
Amendment to the June quarterly report adding a required disclosure: $120,000 of salary was paid to a director during the quarter. Administrative correction only.
Further detail on Colosseum rare earth work: fenite outcrops over 1.6km, 86% of fenite samples anomalous in REE, top reading 0.391% TREE. The company says this suggests a large underlying carbonatite. Exploration stage only; gravity data will refine drill targeting.
Notice of a 20-30 minute webinar on 5 August 2022 on Colosseum's rare earth potential, presented by management and the two REE advisors. Repeats known facts; no new results.
Maiden JORC-2012 resource for Colosseum: 20.9Mt @ 1.2g/t gold for 813,000oz, 71% Measured or Indicated. It is open at depth, with drilling below planned. This resolves the pending Colosseum resource thread, built largely on historical data validated by the 2022 drilling.
Terms notice for 10,000,000 unlisted options disclosed in an Appendix 3G: exercisable in multiples of 10,000, not quoted, non-transferable without consent. Exercise price and expiry are not in the text. Administrative only.
20 June 2022security holder rights change● Neutral
961,992 convertible notes were converted into 9,619,920 shares at $0.10 on 16 June 2022. 1,000,000 notes remain outstanding, all held by Chairman Mark Johnson. This reduces the outstanding notes noted earlier and adds shares.
Final assays for Colosseum hole CM22-05 returned 100.6m @ 4.16g/t Au from 79.24m, including 7.6m @ 12.74g/t. The company says this shows grade continuing below the historic resource shell. It says the JORC-2012 resource estimate is well advanced.
Colosseum validation drilling confirmed the historic geology. Best intercepts were 10.67m @ 13.71g/t Au (CM22-04) and 19.81m @ 5.19g/t Au (CM22-05), the latter below the historic model. Assays from deeper CM22-05 are still awaited; a JORC-2012 resource is being finalised.
Phase 1 diamond drilling at Colosseum is complete: 5 holes totalling 2,200 feet, to validate historical data and test groundwater. Assays are expected in 4-6 weeks, followed by a JORC-2012 resource estimate in the June quarter. No results yet.
February 2022 Colosseum field work and lab analysis confirmed fenite and trachyte outcrops over about 1.6km. The experts say this suggests a possible large carbonatite beneath. Detailed mapping of all claims is planned for Q2 2022 before drilling is planned. Exploration-stage only.
Lucky Strike has produced 12 tons of saleable gold concentrate; the first three tons averaged about 923g/t gold. Offtake is down to three bidders, with first sale expected late April/early May. Dateline signed a Komatsu equipment deal to become owner-miner, and 24/7 milling starts May 2022.
Two Mountain Pass-linked rare earth experts, Dr Anthony N. Mariano and Anthony Mariano Jr, were appointed senior advisors for Colosseum. They say its radiometric anomaly is 3-5 times background and genetically related to Mountain Pass. More mapping and sampling is planned for Q2 2022.
Half-year accounts to 31 December 2021, repeating the known story: Gold Links production decision, Lucky Strike commissioning from February 2022, Colosseum completed and REE work planned for H1 2022. Financial figures were not visible in the text provided.
Face sampling at the Gold Links 9900 resource returned up to 308g/t gold and 7,733g/t silver, well above the 14g/t resource grade. Gold concentrate is now being produced at Lucky Strike, and a 250tpd ball mill has been bought, with installation due by end June 2022.
Further Gold Links core results extend Discovery Zone 1, including 1.54m @ 18.44g/t gold and 0.5m @ 30.04g/t gold. 21 holes are now complete there. Drilling continues north and down-dip from stations 5 and 6; the company says this could expand the resource.
Dateline replied to an ASX query that found its December quarter funding answers inadequate (under one quarter of funding left). It says higher spending was one-off Colosseum and capital-raising costs, and the extra US$3m loan plus major shareholder support cover funding.
Gold Links mining began at about 100 tons a day on the 9900rl resource (14.73g/t Indicated), with ore trucked to Lucky Strike mill, being recommissioned. Another US$3m was drawn from the loan at 6% over 10 years. First concentrate sale is targeted for Q1 2022. A new drilling contractor replaced the previous one after reliability problems.
Two more Gold Links holes returned up to 94.34g/t gold over 0.1m, within 2.0m @ 8.54g/t Au. The company says results are in line with expectations. The program was expanded from 10 to 13 holes in the Discovery Zone, with five results still pending.
Gold Links' second escapeway is finished, which the company says legally allows stope mining to start. Mining of the 9900RL resource is expected late December or early January at about 100 tons a day, with milling at Lucky Strike once 4-6 weeks of stockpile exist.
Underground drilling at Gold Links hit up to 56.74g/t gold and 384g/t silver over 0.6m, within 1.6m @ 29.2g/t Au. Management says results match expectations for the 2150 vein. Decline is 70% done (700m of 1,000m); a decision to produce is still expected by end 2021.
Mark Ohlsson became Company Secretary on 1 November 2021, and John Smith resigned after eight years. This resolves the succession flagged for Smith's retirement. The announcement says nothing about who takes over as CFO.
Dateline closed the Colosseum Gold Mine purchase from Barrick subsidiary LAC Minerals, with all conditions met. It provided US$770,000 of reclamation bonds to replace Barrick's. This completes the March 2021 deal; a field program is now being planned.