- 28 Sept
The US Department of Justice filed its own motion on 25 September to stay the Colosseum injunction pending appeal, backed by a Department of War declaration citing national security. Dateline and the Government have both appealed; stay motions are set for hearing 26 October. Operations remain halted.
regulatory community update
- 12 Aug
The US court granted NPCA a preliminary injunction on 10 August, ordering Dateline to halt Colosseum operations in an orderly way until the injunction is lifted or final judgment. Dateline is considering an appeal; a status hearing is set for October 2026.
regulatory community update
- 29 July
At its own request, Dateline's shares were suspended from quotation so it could manage its disclosure obligations while a US federal court considered a motion for a preliminary injunction restraining activities at the Colosseum Project. The suspension was to last until an announcement on the outcome or status of the matter, or until trading on 30 July 2026.
other
- 15 July
First Music Valley rock chips all 33 returned anomalous rare earths, peaking at 7.13% TREO in the Southern target (Fermi claims); NW target gave 0.68-1.09% TREO over ~200m. Confirms the earlier geophysics targets carry rare earths; no drilling yet.
drilling result
- 16 June
The Federal Court trial over the 252 disputed REE tenements (USC/Gladiator v Dateline and CEO Baghdadi) concluded 16 June. Justice Beach reserved judgment with no timetable; Dateline agreed to maintain the status quo on the tenements meanwhile. Outcome still open.
regulatory community update
- 22 May
Alvarez & Marsal appointed construction manager and integrated owner's team for Colosseum, working with the FEED team on an EPC+M contract for the processing plant. Construction is to start once financing is settled, which is still outstanding.
contract award
- 19 May
Dateline appointed Vancouver-based GenCap Mining Advisory to lead Colosseum project financing. The data room is open to several financiers with indicative terms being considered. No financing is agreed yet; this follows the 11 May BFS and its US$249m start-up capital need.
material agreement
- 15 May
Two new Colosseum North Pit northeast holes hit broad gold: CM25-41 287.3m @ 1.05g/t (incl. 17.7m @ 6.13g/t) and CM26-42 214m @ 1.06g/t, outside the current resource. REE drilling expanded to 18 holes, nearly 3,000m done; third rig for gold.
drilling result
- 11 May
Colosseum BFS: at US$4,200/oz, pre-tax NPV5% US$785m, IRR 49.5%, US$249m start-up capital plus US$25m contingency, 573koz over 10.4 years, AISC US$1,825/oz. Mine life is longer than scoping (8.3 years) but total gold is lower (635koz scoping) and capex is higher. Now seeking project finance.
resource reserve update
- 17 Apr
Dateline responded to media coverage of US legal proceedings by the National Parks Conservation Association against federal agencies over mining rights at Colosseum. The company was not named and says its valid existing rights stand and activities continue as planned. New uncertainty to watch.
regulatory community update
- 1 Apr
Dateline raised A$50m in a placement at A$0.40 per share (125m shares, about 3.3%), lifting cash to about A$96m. Funds go to enabling works, equipment, and equity for future project finance. BFS now due April 2026, slipping from end March; Ernst & Young appointed international auditor for SEC registration.
capital raising announcement
- 11 Mar
Dateline expanded Music Valley heavy rare earths project by 969 claims (19,380 acres), now 1,026 claims over 20,520 acres with over 8km of prospective Pinto Gneiss. Previously 57 claims (1,140 acres). Airborne survey about 65% complete; mapping and sampling started.
asset acquisition disposition
- 27 Feb
Dateline acquired the Music Valley heavy rare earths project (57 claims, 1,140 acres, Riverside County, California) and, as part of the terms, invested US$1.0m in Fermi Critical Minerals. Historical USGS rock chips reported 6.69%-15.04% TREO. It adds a new heavy rare earth exploration project beyond Colosseum.
asset acquisition disposition
- 25 Feb
Combined geophysics defines three carbonatite rare earth targets at Colosseum. Hole RC25-038 gave the first drill-based confirmation of anomalous rare earths, which the company says matches Mountain Pass. Twelve diamond holes are planned on Targets 1 and 2. Only anomalous, not economic, grades are reported.
drilling result
- 12 Feb
Diamond hole CM25-41 in the North Pipe northeast extension returned 149.65m at 1.39 g/t Au from surface, including 55.2m at 2.83 g/t, ending in ~1 g/t mineralisation. It is outside the current resource boundary. Larger rigs will test whether mine life can extend beyond the ~8.5-year scoping case.
drilling result
- 23 Jan
Dateline raised A$35m in an institutional placement at A$0.31 per share (112.9m shares, 3.1% of capital), lifting cash to over A$58m. Directors committed A$1.35m, subject to shareholder approval. Funds go to the Colosseum BFS, drilling and long-lead items; it also plans a shift to US reporting standards. This explains the 21 January trading pause.
capital raising announcement
- 21 Jan
ASX paused trading in Dateline's shares pending a further announcement. No reason is given in the notice.
other
- 12 Jan
Colosseum drilling reports wide gold intercepts, including 295.64m at 1.04 g/t Au (RC25-035) from surface, several outside the current resource envelope. The breccia pipe is still mineralised at ~300m RC depth and open northeast; diamond drilling will test deeper.
drilling result
- 5 Jan
George Brack (Wheaton Precious Metals chair, 30+ years in mining finance) and Phillips Baker Jr (Hecla Mining CEO for 23 years) join as non-executive directors, lifting the board to six. The chairman says this adds experience as Colosseum moves toward production.
director officer appointment
2025
- 29 Dec
Dateline signed an option, costing up to US$200,000 in total, to lease ~27 acres at the base of the Colosseum mine road, including two wells the company says can supply 100% of project water. Lease runs 10 years plus a 5-year extension. BFS reaffirmed for Q1 2026.
material agreement
- 9 Dec
Dateline responds to US 1 Critical Minerals (formerly Gladiator) starting legal proceedings against CEO Baghdadi over US rare earth tenements. The board denies any contract with USC, says it will defend vigorously, and that any tenements secured would benefit Dateline shareholders.
other
- 18 Nov
First BFS infill assays at Colosseum: 85.34m at 1.33 g/t Au (RC25-020, below the pit) and 61.26m at 1.18 g/t Au (CM25-19, partial). Company says results match expectations and support upgrading Inferred resource (33% of the 1.1Moz) to higher confidence.
drilling result
- 16 Sept
Dateline completed its acquisition of 100% of the Argos Strontium Project in California, about 100km from Colosseum, finalising the 80% term sheet noted earlier. Company calls it the largest known US strontium deposit. Price and terms are not given in the excerpt.
asset acquisition disposition
- 10 Sept
Drilling began at Colosseum in a program expected to exceed 10,000m of RC and diamond drilling through the rest of 2025. A Major Drilling RC rig is contracted to join company rigs, covering resource extension, geotechnical work and new gold and REE targets.
drilling spud
- 1 Sept
Dateline raised A$25m from institutions at A$0.215 per share (116.3m new shares, ~3.5% of enlarged capital), lifting cash to over A$35m. Shaw and Partners led for a 6% fee. Funds go to Colosseum; the company also begins SEC registration steps.
capital raising announcement
- 19 Aug
Combining the 3D MT survey with gravity data, Dateline identifies six new breccia pipe targets within 1.5km of the Colosseum resource, four comparable to or larger than known pipes. MT suggests known pipes extend ~300m below prior drilling. Drilling targeted from September. Not drill results.
drilling result
- 11 Aug
The 3D MT model identifies several high-priority REE drill targets at Colosseum, led by the 2200N resistive anomaly under fenite outcrops in an area with no historical drilling. The company calls it a possible carbonatite source. Gold targets are also flagged; drill planning is next, with no drilling yet.
drilling result
- 15 July
Simon Slesarewich, a mining engineer with 25+ years' experience and previously at Thiess, will join as Chief Operating Officer from 4 August 2025 to lead the Colosseum BFS and development. He holds about A$1m of Dateline equity, per the announcement.
director officer appointment
- 1 July
The Colosseum MT survey finished on 29 June with 167 stations. Line 2200N shows a high-resistivity zone to surface under REE-bearing fenite dykes, and the company says the signature resembles Mountain Pass. First soil assays confirm anomalous REE; 916 of about 1,200 samples collected. Not drill results.
drilling progress report
- 25 June
Managing Director Stephen Baghdadi exercised 53,000,208 options, putting over A$1.06m of cash into Dateline and lifting his holding to 396,890,307 shares (12.85%). He says cash at bank plus option exercise commitments is almost A$9m, following earlier option exercises.
capital raising announcement
- 23 May
Re-running the October 2024 Colosseum scoping study at US$2,900/oz gold (was US$2,200) lifts NPV6.5 to US$550m from US$235m and IRR to 61% from 31%. Costs and production are unchanged; still scoping-level (+/-35%), with about US$152m funding needed.
resource reserve update
- 19 May
Cash at bank is about A$1.95m, including about A$1.1m from option exercises, rising to about A$2.3m after the Udu cash payment. Dateline says this fully funds the Colosseum feasibility study, easing the low-cash concern from December.
capital raising announcement
- 13 May
Dateline sold its Udu copper project in Fiji to Viva Metals for up to A$4.35m: A$350k cash, A$1m in shares on a future listing, and up to A$3m in milestones and a capped 1% royalty. This resolves the long-running search for a Udu partner.
asset acquisition disposition
- 22 Apr
The Colosseum bankable feasibility study has started, led by Kappes, Cassiday & Associates (processing) and AMDAD (mining), based on the open-pit case at 2Mtpa and about 75koz a year over 8.5 years. Completion is expected by end of 2025.
material agreement
- 16 Apr
A second placement of 100 million shares at A$0.007 to an institutional investor raised A$700,000, with 50 million options at A$0.02. Total from the two placements is A$1.4m; no further placements are currently planned.
capital raising announcement
- 15 Apr
Dateline placed 100 million shares at A$0.007 to a US strategic investor, raising A$700,000, with 50 million options at A$0.02 expiring 2 August 2026. No fees paid; funds go to the Colosseum feasibility study.
capital raising announcement
- 9 Apr
The US Department of the Interior publicly confirmed Dateline's valid existing rights to mine gold and explore for rare earths at Colosseum under its approved Plan of Operations. Dateline will now add rare earth exploration to its work program, advancing the earlier rare earths thread.
regulatory community update
2024
- 23 Oct
Colosseum scoping study released: open-pit Case 2 preferred, 75koz a year for 8.4 years, NPV6.5 US$235m, IRR 31% at US$2,200/oz gold. Needs about US$152m funding against market cap of about US$10m. Moves to project selection ahead of a bankable feasibility study.
investor presentation
- 27 Aug
The rights issue shortfall was placed, raising $1.27m, plus a $392,610 follow-on placement on the same terms. Total tranche is $1.663m, on top of the $4.56m rights issue, bringing the total to $6.22m at $0.006 with attaching options.
capital raising announcement
- 27 Aug
First Dateline drilling at Colosseum's North Pipe returned 203.6m @ 1.03g/t gold (incl. 10.7m @ 8.17g/t) and 192m @ 1.00g/t, confirming 1980s drilling. Results feed a scoping study of open pit and underground options; North Pipe holds 603koz of the 1.1Moz resource.
drilling result
- 31 July
The rights issue closed with valid applications for $4.56m, leaving 212.1m shares of shortfall that may be placed with strategic investors. Rare earths exploration timing depends on pursuing non-dilutive funding. That is short of the up to $5.8m targeted.
capital raising announcement
- 24 July
After ASX discussions, Dateline retracts slide 12 ('Pathway to Production') of its same-day presentation. It says it has no reasonable basis for stating a life of mine or production targets, and investors should not rely on it.
regulatory community update
- 8 July
Dateline replaces the withdrawn offer with a 2-for-3 renounceable rights issue at $0.006 to raise up to about $5.8m, with a free 1-for-2 attaching option at $0.02 over 24 months. Johnson (about $1.17m) and Baghdadi (about $0.8m) commit to take up in full. Funds are for exploration, mine planning and debt reduction.
capital raising announcement
- 5 July
The board withdraws the $0.01 rights issue announced 12 June and will return subscribed funds. Further funding details are promised for 8 July. This reverses the earlier raise, leaving the funding need unresolved for now.
capital raising announcement
- 12 June
Dateline launches a partially underwritten 1-for-3.5 non-renounceable rights issue at $0.01 to raise up to about $4.2m, for exploration, a mine planning study and debt reduction. Chairman Johnson (about $0.84m) and MD Baghdadi (about $0.57m) commit to take up their entitlements in full.
capital raising announcement
- 6 June
Colosseum resource rises 35% to 1.1Moz gold (27.1Mt @ 1.26g/t) from 813koz in July 2022. Measured and Indicated make up 736koz, 67% of the total. This resolves the pending update; AMDAD is engaged for mine planning studies.
resource reserve update
- 16 May
Final Colosseum hole CM24-16 extends to 104.7m @ 3.65g/t gold; first RC results include 74.7m @ 4.27g/t. This continues April's partial result. The updated resource is due early June, with the RC results left for a later update.
drilling result
- 2 Apr
Colosseum hole CM24-16 returned 88m @ 4.18g/t gold, including 22.8m @ 8.17g/t, and CM24-15 returned 19.8m @ 4.19g/t. Both hit high grade in the felsite breccia, the largest unit, not just the sedimentary breccia, so the geology model will be revised.
drilling result
- 21 Feb
Dateline raised A$1.478m via a placement of 123.2m shares at $0.012, a 20% discount to five-day VWAP, with a 1-for-2 three-year option at $0.03 (options need shareholder approval). Funds go to Colosseum drilling and working capital, easing the low cash position.
capital raising announcement
- 13 Feb
Colosseum hole CM23-14 returned 70.1m @ 6.53g/t gold, including 25.9m @ 15.31g/t. This confirms the January breccia sighting with a grade result, and sits behind only CM23-08's 76.2m @ 8.62g/t. Next hole CM24-15 is due in March.
drilling result
2023
- 31 Oct
The 1-for-1 rights issue at $0.01 closed with applications for 427.5m shares, raising $4.275m against the up-to-$8.85m target. Chairman Johnson and MD Baghdadi took up their entitlements and underwrote $1.5m of shortfall. About half the maximum was raised.
capital raising announcement
- 9 Oct
Dateline launches a 1-for-1 partially underwritten rights issue at $0.01 to raise up to about $8.85m, for Colosseum and Argos exploration, debt reduction and working capital. Directors Johnson and Baghdadi will take up entitlements and underwrite up to $1.5m of shortfall. The price is half the 2023 raise price of $0.02.
capital raising announcement
- 20 July
Second Colosseum hole CM23-11a returned 81.35m at 2.57g/t gold, including 36m at 3.97g/t. First hole CM23-08 was revised down after final assays to 76.2m at 8.62g/t from 63.2m at 10.28g/t. Third hole is still in mineralisation past 306m.
drilling result
- 5 July
Dateline signs a binding term sheet for 80% of the Argos strontium project in California, about 100km from Colosseum. It pays 5m shares, 10m options at 3 cents and US$550k in instalments; completion needs due diligence and approvals by 2 September 2023.
asset acquisition disposition
- 19 June
First Colosseum diamond hole CM23-08 returned 63.2m at 10.28g/t gold, including 23.5m at 21.8g/t, well above the 1.2g/t resource average. Second hole is under way, results due in 2-3 weeks; eight holes planned and rare earth drilling targeted for September quarter.
drilling result
- 13 June
Dateline signs a binding sale of Gunnison Gold, holding Gold Links and Lucky Strike, to MW Sorter, replacing the earlier 50% JV structure. It gets US$2.275m cash plus US$5.5m performance payments; about US$11.8m of liabilities go with it. Colosseum drilling has begun; rights issue shortfall of $955k placed.
asset acquisition disposition
- 2 Mar
Dateline raises $2.71m through a placement of 135.5m shares at $0.02, with 67.75m options at $0.03 attached. Directors will convert up to $900k of debt to shares, and a ~$1m rights issue at $0.02 is planned. Funds go to Colosseum exploration and working capital.
capital raising announcement
- 24 Feb
San Bernardino County approved certification of Colosseum's pre-existing vested rights to mine, so no mining County Use Permit is needed. The certificate is still to be recorded. Dateline is finalising gold and rare earth drilling plans for the coming months; the 813koz resource is unchanged.
regulatory community update
- 23 Feb
Dateline agrees a Gold Links JV with MW Sorter: a new US entity owned 50% Dateline, 40% MW, 10% a private Australian investor, combining Gold Links, Lucky Strike mill and London stockpiles (800kt at 2g/t, not JORC compliant). MW pays US$825k monthly toll fee and US$700k for mill upgrade. This answers the JV partner search.
joint venture update
2022
- 6 Dec
Dateline puts Gold Links into care and maintenance, which halts mining begun in January 2022, and seeks a joint venture partner and more US bank debt. Its stated aim is no further capital contribution. Focus shifts to Colosseum.
asset acquisition disposition
- 29 Nov
AGM address says the board will prioritise Colosseum as the main US asset, with a gold and rare earth drilling program planned for the first quarter of 2023. It describes a Gold Links contractor dispute over missed deadlines; the extract is cut off.
other
- 3 Oct
ASX suspended Dateline's shares from 3 October 2022 for failing to lodge its periodic report by the due date. The text does not say which report. Shareholders cannot trade until it is lodged.
listing compliance notice
- 19 Aug
Placement of 62.5m shares at $0.10 to raise $6.25m, a 17% discount, with 15.625m options at $0.135 over three years. Funds go to Colosseum gold and rare earths exploration and working capital. Part needs shareholder approval at a late September meeting.
capital raising announcement
- 6 July
Maiden JORC-2012 resource for Colosseum: 20.9Mt @ 1.2g/t gold for 813,000oz, 71% Measured or Indicated. It is open at depth, with drilling below planned. This resolves the pending Colosseum resource thread, built largely on historical data validated by the 2022 drilling.
resource reserve update
- 6 June
Final assays for Colosseum hole CM22-05 returned 100.6m @ 4.16g/t Au from 79.24m, including 7.6m @ 12.74g/t. The company says this shows grade continuing below the historic resource shell. It says the JORC-2012 resource estimate is well advanced.
drilling result
- 12 May
Colosseum validation drilling confirmed the historic geology. Best intercepts were 10.67m @ 13.71g/t Au (CM22-04) and 19.81m @ 5.19g/t Au (CM22-05), the latter below the historic model. Assays from deeper CM22-05 are still awaited; a JORC-2012 resource is being finalised.
drilling result
- 21 Apr
Lucky Strike has produced 12 tons of saleable gold concentrate; the first three tons averaged about 923g/t gold. Offtake is down to three bidders, with first sale expected late April/early May. Dateline signed a Komatsu equipment deal to become owner-miner, and 24/7 milling starts May 2022.
production update
- 4 Mar
Face sampling at the Gold Links 9900 resource returned up to 308g/t gold and 7,733g/t silver, well above the 14g/t resource grade. Gold concentrate is now being produced at Lucky Strike, and a 250tpd ball mill has been bought, with installation due by end June 2022.
production update
- 19 Jan
Gold Links mining began at about 100 tons a day on the 9900rl resource (14.73g/t Indicated), with ore trucked to Lucky Strike mill, being recommissioned. Another US$3m was drawn from the loan at 6% over 10 years. First concentrate sale is targeted for Q1 2022. A new drilling contractor replaced the previous one after reliability problems.
production update
2021
- 13 Dec
Gold Links' second escapeway is finished, which the company says legally allows stope mining to start. Mining of the 9900RL resource is expected late December or early January at about 100 tons a day, with milling at Lucky Strike once 4-6 weeks of stockpile exist.
production update
- 27 Oct
Dateline closed the Colosseum Gold Mine purchase from Barrick subsidiary LAC Minerals, with all conditions met. It provided US$770,000 of reclamation bonds to replace Barrick's. This completes the March 2021 deal; a field program is now being planned.
farm in farm out completion
- 23 July
Dateline raised about $4.1m via a placement of 45.6m shares at $0.09, a 14.3% discount to the last price. Directors Baghdadi and Ferguson will take $208k and $100k, subject to approval. Cash is stated at over $10.5m, funding Colosseum drilling and rare earths sampling.
capital raising announcement
- 8 June
Phase 2 ore-sorting test on 849kg of Gold Links material raised grade 41.6%, from 15.34 to 21.71g/t Au, with about a third of the mass rejected as waste and 2.6% of gold lost. This is a proof-of-concept test only. A further test is planned.
drilling result
- 3 June
Review of historical BP Minerals data for Colosseum cites a non-JORC resource of 1.1Moz at 0.5g/t cut-off to about 260m depth. Pipes reportedly continue another 530m deeper. Historical figures cannot be relied on as JORC resources. Post-consolidation shares are around $0.08.
resource reserve update
- 24 May
A mining contractor was appointed after a competitive tender, resolving the contractor shortlist. It will build about 1km of underground decline at Gold Links, mobilising from 27 May. Drilling of 4,000m starts in June. Both are expected to finish in Q4 2021.
contract award
- 26 Apr
Dateline announced a 25-for-1 share consolidation, cutting shares from about 8.83bn to about 353m. Option exercise prices rise 25 times. It depends on shareholder approval at the 21 May 2021 meeting, with new shares trading from 25 May on a deferred settlement basis.
security holder rights change
- 24 Mar
Dateline accepted a US$6.843m (about A$9m) loan from a US lender, resolving the funding search. It is a 10-year facility at 6% interest, interest-only for four years, secured on Gold Links. Funds are received. Underground development is expected Q3 2021 and milling at Lucky Strike Q4.
debt financing
- 15 Mar
Dateline agreed to buy 100% of the Colosseum gold mine in California from a Barrick subsidiary. It produced about 344,000oz in 1988-93 (historical, not JORC). Terms: replace about US$757,000 of reclamation bonds, plus US$1.5m after a feasibility study or site development starts.
asset acquisition disposition
- 15 Jan
Bill Lannen, a mining engineer who founded the mining contractor Mancala, joined as a non-executive director. The chairman links his underground mining experience to the plan to get Gold Links into production.
director officer appointment
2020
- 4 Dec
AGM address: Chairman says Covid-19 shifted strategy from aggressive exploration to limiting spending. Talks are under way with US institutions for a long-term working capital facility for Gold Links development, and a Udu bulk sample is planned if the Fiji leases are renewed.
other
- 30 Sept
Accounts for the year to 30 June 2020 show a loss of $3.84m. Cash fell to $158,362 from $4.82m a year earlier. Total liabilities eased to $7.4m from $7.7m and net assets were $16.6m.
annual report
- 21 Apr
Colorado granted mining permits for the Raymond and Carter mines at Gold Links, giving six permits in the Gunnison district and permitted capacity of 420,000 tonnes a year. This follows the Dec 2019 portal approval. Historical production figures are not JORC-compliant.
regulatory community update
2019
- 5 Sept
A new 'Hill' vein was found 120m south-east of Sacramento, with grab samples of 56.5g/t Au. At the 2150 vein, all six holes hit mineralisation; GL03 returned 1.6m @ 30.4g/t Au. An extra rig was added; company says it remains fully funded.
drilling result
- 13 Aug
First Sacramento results: 13 of 16 holes hit gold, best 1.75m @ 24.9g/t Au from SAC13, with mineralisation over 225m of strike and open. A new 65m-wide structure was found. Cash over A$4.8m at 30 June. Metal-equivalent figures later amended.
drilling result
- 4 June
Managing Director and CEO Glenn Dovaston resigns with immediate effect for personal reasons, about six months after appointment. Executive director Stephen Baghdadi takes over as Managing Director, on the day drilling was due to start.
director officer appointment
- 29 May
Dateline confirms an 8,000m, 41-hole surface drill program at Gold Links from 3 June, testing the Sacramento (20 holes) and 2150 (21 holes) veins over about 600m of strike. First assays expected July 2019. Funded, with cash retained after program.
drilling scheduled
- 2 Apr
Final ~$700,000 of the shortfall placed, completing the $14.5m rights issue at $0.002. Shares issued 1 April 2019. Company says it is fully funded for Gold Links exploration, aiming for a maiden JORC resource in the December 2019 quarter.
capital raising announcement
- 14 Mar
Shortfall placement raised a further $6.482m, 90% of the shortfall, bringing the rights issue total to about $13.8m against up to $14.5m sought at $0.002. About $700,000 remains to be placed. Company targets a maiden JORC resource in the December 2019 quarter.
capital raising announcement
- 11 Feb
Dateline releases the Gold Links exploration target backed by historical records: production of up to 150,000oz gold, sample grades up to 493 g/t. Figures are unverified. Drilling to test the target is planned for first half 2019. Follows the ASX-requested retraction of 11 Feb.
resource reserve update
- 11 Feb
At ASX's request, Dateline retracts and clarifies parts of its 30 November 2018 presentation and a CEO letter that were non-compliant with JORC rules, including the 'multi-million oz' potential statement and the exploration target. It reissues them with an exploration target released 8 February 2019.
admin correction
- 5 Feb
Rights issue closed raising $7,307,599 against up to $14.5m sought, for 3.65bn shares applied for. Underwriters add 1.06bn shares ($2,125,848). A shortfall of 2.53bn shares remains to be placed within 3 months. Directors and Southern Cross took up their entitlements.
capital raising announcement
- 22 Jan
Chairman Mark Johnson raises his rights issue underwriting from $500,000 to $1,613,472, bringing his total commitment to over $3.04m. If no one else subscribes, Southern Cross would reach 54.4% and Johnson 31.8%.
capital raising announcement
2018
- 30 Nov
Dateline launches a 10-for-1 renounceable rights issue at $0.002 to raise up to about $14.5m, partly underwritten by directors. Southern Cross and Mark Johnson will swap about $6.2m of loans into shares. Funds are for debt retirement, Gold Links and working capital. This replaces the withdrawn April 2018 raise.
capital raising announcement
- 27 Nov
Underground sampling of the 2150 vein at Gold Links returned 1.2m @ 250 g/t gold and 1.8m @ 38.1 g/t, with a 151 g/t grab sample. Company says it supports plans for a maiden JORC resource; consistent with hole C8 (91.12 g/t).
drilling result
- 22 Nov
Glenn Dovaston, ex-CEO of Millennium Minerals, is appointed CEO on a $475,000 package, part cash and part equity (split to be set). He is to lead Gold Links development, taking over the CEO role held by Stephen Baghdadi.
director officer appointment
- 21 Sept
Raymond and Carter price was cut to US$1m from US$2m, funded by Southern Cross and Mark Johnson at a 5% facility fee and 15% annual interest. The company owes them about $6.6m in total, unsecured and repayable on demand. Capital management to repay the loans is being considered.
debt financing
- 20 Sept
Dateline completes the Raymond and Carter acquisition, about 1,300 acres freehold, paid in full and funded by Southern Cross and director Mark Johnson. Holdings now about 1,700 acres freehold and 400 leasehold. Board is considering funding options so all shareholders can participate. Closes the March 2018 deal.
farm in farm out completion
- 4 May
Dateline withdraws the 1-for-10 rights issue at $0.03; applications will not be accepted and money is refunded without interest. The stated reason is the need to raise funds for Raymond and Carter. It is discussing possible non-dilutive funding and will seek approval to place shares to sophisticated investors.
capital raising announcement
- 18 Apr
Visible gold seen in grab samples from a newly exposed vein at Mineral Hill, 1.6km from Lucky Strike, on company freehold land. Early surface finding only; no assays given. Trenching and sampling planned to test whether it links to the Lucky Strike vein.
drilling result
- 16 Apr
Dateline launches a 1-for-10 non-renounceable rights issue of up to 71.8m shares at $0.03 to raise up to about $2.16m. Not underwritten. Funds for working capital, Gold Links development, drilling and a second egress at Lucky Strike. Closes 4 May 2018.
capital raising announcement
- 13 Mar
Dateline agrees to buy the Raymond and Carter mines, about 1,300 acres adjoining Gold Links, for US$2m cash, settling in about 90 days. A 10% refundable deposit is paid, with a 30-day walk-away right. An old non-JORC estimate of 750,000oz is unverified.
asset acquisition disposition
- 21 Feb
Assays from 67 underground holes (2,072m) and 74 channel samples at Gold Links show high grades, best 0.3m @ 223 g/t gold equivalent. CSA Global retained for a JORC resource estimate; 60-100m more decline needed to reach the 9900 zone. Delivers the mid-February sampling results.
drilling result
- 19 Feb
Dateline renegotiated the Gold Links and Lucky Strike acquisitions, swapping US$24m of near-term cash payments for 60m shares and deferring US$2.5m per vendor to 2023. It also bought the Gold Links freehold land for 30m shares and 10m options, cutting cash liabilities from US$34m to US$5m per vendor.
material agreement
2017
- 3 Oct
Dateline completes the Sooner Lucky Strike mine and mill acquisition, owning 100% of 19 claims over about 350 acres. Terms: 30m shares, US$150k cash, US$250k quarterly from April 2018, US$10m in April 2022, plus a US$10m production royalty. Resolves the completion thread.
asset acquisition disposition
- 3 Oct
The rights issue shortfall of 91,006,146 shares ($1,815,165) has been placed with sophisticated investors, bringing the total raised to about $4.0m at $0.02. Resolves the open question of whether the raise would be filled.
capital raising announcement
- 14 Aug
Rights issue closed raising $2,184,835 at $0.02 (applications for 109.2m shares), about half the $4.0m maximum. Chairman, CEO and Southern Cross took up full entitlements. A shortfall of 91.0m shares may be placed to investors within 3 months.
capital raising announcement
- 21 July
1-for-2 non-renounceable rights issue of up to 200.2m shares at $0.02 to raise up to about $4.0m, not underwritten. Funds are for working capital including the Colorado gold project. Chairman Johnson (11.85%) and Southern Cross (39.95%) are expected to take up their full entitlements.
capital raising announcement
- 20 July
Dateline relinquishes all five Mt Augustus copper exploration licences in Western Australia. The $910,639 carrying value will be fully expensed in the year to 30 June 2017. Ends the company's last Australian project.
asset acquisition disposition
- 20 July
June 2017 quarter: mining contractor mobilised and development started at Upper Gold Links; Hazen outlined a plan to lift Lucky Strike Mill capacity to 180tpd. Dateline is seeking a party to develop Udu, using PCF Capital, and has relinquished Mt Augustus.
quarterly activities report
- 26 June
Four-hole, 440m diamond drilling at Gold Links intersected the 2150 vein in all holes, consistent with the earlier non-JORC interpretation. Best intercept was 0.5m at 10.02 g/t Au equivalent. Resolves the drilling thread; mining is still said to be on track for next month.
drilling result
- 15 June
Small Mine Development LLC appointed underground mining contractor at Gold Links after competitive bidding. Dateline targets small-scale production in early July 2017, with ore trucked about 50km to the Lucky Strike Mill. Follows the March sampling and tender process.
contract award
- 30 Mar
Channel sampling at Gold Links returned an average 22.75 g/t Au over 30m, with a best sample of 151 g/t Au. Dateline says this gives confidence to begin small-scale mining and has started tendering to contractors. Rock sampling, not a resource.
drilling result
- 14 Feb
MSHA approval lets Gold Links site works and drilling begin; an eight-hole, 1,000m program is due from March 2017. Colorado DRMS approved two new mining permits with no objections. Cash is about $1.4m; Sooner Lucky Strike completion expected in about 60 days.
regulatory community update
- 6 Feb
Placement of 33.3m shares at $0.03 to Gleneagles clients raises $1.0m for working capital, about 8.32% of the enlarged capital. It is issued under existing placement capacity, without shareholder approval.
capital raising announcement
- 31 Jan
December 2016 quarter: shareholders approved all Gunnison resolutions at the 30 November AGM. 265.9m shares were issued at $0.01, taking capital to 367.2m, and about $560k of debt was retired. A 167m surface hole at Gold Links awaits assays.
quarterly activities report
2016
- 29 Nov
Non-binding agreement to buy the Sooner Lucky Strike mine and 150-200tpd mill in Colorado, about 50km from Gold Links. Terms include 28.25m shares, US$125k cash and later payments including about US$9.5m in April 2022; completion targeted by April 2017, subject to due diligence.
asset acquisition disposition
- 19 Oct
Southern Cross (SXX) will take 100m Dateline shares at $0.01 for $1m, plus shares for about $400k debt owed to it, giving it about 43% of Dateline. Linked to Dateline taking over Gunnison Gold; subject to Dateline shareholder approval.
capital raising announcement
- 19 Oct
Dateline will take over Gunnison Gold from Southern Cross, giving it the Gold Links Mine and 50tpd mill in Colorado. This is a major strategy shift away from Fiji and WA. Terms: US$200k upfront, US$3m in two years and US$7m later, plus $250k fee and 25m options at $0.04. Needs shareholder approval.
asset acquisition disposition
2015
- 16 Oct
Acquisition of 99.76% of Golden Phoenix completed on 16 October 2015, with about 24.9m new shares issued at $0.05, roughly 9.9m to trusts related to director Greg Hall (escrowed 12 months). Shares on issue rise to 101.24m; remaining GPR shares to be compulsorily acquired.
farm in farm out completion
- 25 May
Dateline agreed to buy all of unlisted Golden Phoenix Resources, holder of the Augustus sedimentary copper project in WA, for $1.25m in about 25m shares at $0.05. This is the outside-Fiji deal long flagged. Director Greg Hall is a GPR director and substantial shareholder; completion is conditional on approvals.
asset acquisition disposition
2014
- 15 Oct
Stephen Baghdadi became Executive Director, and Mark Johnson gave up his executive role but stays Chairman. Baghdadi gets $5,000 a month, accrued and paid as cashflow allows, plus 7.5m options at $0.04 expiring May 2016, subject to AGM approval.
director officer appointment
- 7 July
Exploration update: strategy now centres on regional porphyry copper exploration, with targets over 20km of strike and the 8,868 hectares of new applications. Dateline will seek a joint venture or other partners. Shares on issue shown as 68.8 million.
investor presentation
- 2 July
Dateline agreed a placement of 15 million shares to Southern Cross Exploration at $0.04, raising $600,000 for working capital. It gives Southern Cross 19.7%. First 7.5m shares complete 4 July, second 7.5m by 31 December 2014. This follows the flagged capital raising.
capital raising announcement
- 30 Apr
March 2014 quarter: drilling put on hold due to budget constraints, with the resource update no longer a near-term priority. Lone Wolf divestment has started, and applications for 8,868 hectares of new licences were lodged. A capital raising is expected to be announced in May 2014.
quarterly activities report
2013
- 27 Nov
Assays from Udu margin drilling: UDH067 10.3m at 1.82% Cu, 1.41% Zn from 33m; UDH068 7m at 2.96% Cu, 5.2% Zn from 45m. Mineralisation remains open down dip south of the 4.5Mt inferred resource. Several other holes had no significant intersections or failed to reach target.
drilling result
- 25 Oct
Conto began drilling Udu targets from the 3D-IP survey. Of four holes, two hit massive sulphides: UDH066 a 20m zone at 83m, UDH067 9m from 43m. Assays are due mid-November, with an updated resource later in 2013. Programme budget is $200,000, covered by existing cash.
drilling result
- 24 Oct
Steve Gemell and George Niumataiwalu joined the board, replacing Ralston, De Souza and King, who resigned (King stays as consultant). John Smith became joint company secretary. Johnson says the change supports progressing the Udu Project in Fiji.
director officer appointment
- 19 Sept
Conto's board will exercise its option to buy the rest of Dateline, citing the strong IP results. Mark Johnson and nominees get 30.65m shares and 4.5m options, as approved on 15 April 2013, making him the largest shareholder.
business combination
- 17 Sept
The completed 3D-IP survey at Udu defined several new copper-zinc targets near the old pit and at Nagasauva and Mikeles Ridge. Drilling is planned for the fourth quarter of 2013. Management says there may be potential for another deposit of similar size to the existing resource.
drilling result
- 31 July
Udu Phase 2 drilling of 13 holes (1,337m) is complete. UDH057 hit 12.5m at 1.4% Cu and 4.34% Zn, outside the current resource, and 3D-IP is nearly done. The board also cut directors' fees and non-essential overheads, citing tough markets for juniors.
drilling result
- 24 Apr
The Dateline joint venture over the Udu project in Fiji has started after the final conditions were met. Shareholders approved the terms on 15 April 2013. This completes the October 2012 heads of agreement. A 2013 Phase 2 exploration program is underway.
farm in farm out completion
- 22 Apr
After shareholders approved the Dateline acquisition the previous week, Mark Johnson became Executive Chairman, replacing Michael Ralston, who stays as a non-executive director. Simon Penney replaced Tanya Woolley as Company Secretary.
director officer appointment
2012
- 22 Oct
Conto signed a conditional binding heads of agreement to acquire up to 100% of Dateline Resources, owner of the Nukudamu copper-zinc project in Fiji (Inferred Resource 4.5Mt at 1.2% Cu, 3.9% Zn). Mark Johnson, Dateline's owner, would become Executive Chairman, subject to shareholder approval. This is the first acquisition after the stated search for projects.
business combination
2011
- 29 Apr
Conto Resources (later Dateline) lodged an IPO prospectus to raise $3m at 20 cents a share (minimum $2.5m), with up to $1m more in oversubscriptions. It holds an option and farm-in deal with Sammy Resources, a Cazaly Resources subsidiary, over gold tenements.