Stockle - the stock oracle

Dateline Resources

ASX:DTR
No current share price held for this company.
No price history held for this listing yet.
Market cap
—
Shares on issue
—
Story beats
134 since 2011
Last event
28 Sept 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

17 Mar 2026drilling progress report● Neutral

The 2,172 line-km airborne magnetic and radiometric survey at Music Valley finished ahead of schedule; data is with Mitre Geophysics. Field mapping and rock chip sampling continue, with assays expected in 5-7 weeks. 252 claims remain in the Federal Court dispute. No results yet.

Discuss in chat

11 Mar 2026asset acquisition disposition▲ GoodMajor

Dateline expanded Music Valley heavy rare earths project by 969 claims (19,380 acres), now 1,026 claims over 20,520 acres with over 8km of prospective Pinto Gneiss. Previously 57 claims (1,140 acres). Airborne survey about 65% complete; mapping and sampling started.

Discuss in chat

9 Mar 2026half year report● Neutral

Half-year to 31 Dec 2025: net loss A$6.24m, cash A$26.6m (up from A$8.9m at June), net assets A$39.0m. Notes the A$35m placement, Music Valley acquisition (US$1.05m) and Argos purchase agreement completed 6 March 2026 as post-period events. Largely financial confirmation of known items.

Discuss in chat

6 Mar 2026other▲ Good

S&P Dow Jones Indices will add Dateline to the S&P/ASX 300 effective 23 March 2026. It was already in the All Ordinaries since September 2025. This is an index notice, not a company announcement.

Discuss in chat

4 Mar 2026drilling scheduled● Neutral

Dateline begins exploration at Music Valley: a helicopter magnetic and radiometric survey of 2,172 line-km starting the following week (8-10 days), plus geological mapping and rock chip sampling by specialists. Results are expected 3-4 weeks after the survey. Early-stage work only.

Discuss in chat

27 Feb 2026asset acquisition disposition▲ GoodMajor

Dateline acquired the Music Valley heavy rare earths project (57 claims, 1,140 acres, Riverside County, California) and, as part of the terms, invested US$1.0m in Fermi Critical Minerals. Historical USGS rock chips reported 6.69%-15.04% TREO. It adds a new heavy rare earth exploration project beyond Colosseum.

Discuss in chat

25 Feb 2026drilling result▲ GoodMajor

Combined geophysics defines three carbonatite rare earth targets at Colosseum. Hole RC25-038 gave the first drill-based confirmation of anomalous rare earths, which the company says matches Mountain Pass. Twelve diamond holes are planned on Targets 1 and 2. Only anomalous, not economic, grades are reported.

Discuss in chat

12 Feb 2026drilling result▲ GoodMajor

Diamond hole CM25-41 in the North Pipe northeast extension returned 149.65m at 1.39 g/t Au from surface, including 55.2m at 2.83 g/t, ending in ~1 g/t mineralisation. It is outside the current resource boundary. Larger rigs will test whether mine life can extend beyond the ~8.5-year scoping case.

Discuss in chat

9 Feb 2026drilling progress report● Neutral

Dateline finished infill gravity, magnetic and radiometric surveys at Colosseum, following December's IP survey. Data are being integrated to pick drill targets, some interpreted at about 500-1,000m depth. Diamond rigs are due on site the following week. No new drilling results.

Discuss in chat

27 Jan 2026drilling progress report● Neutral

Dateline completed a five-line, ~13 line-km IP survey at Colosseum. Preliminary results show chargeability zones that coincide with earlier MT conductivity and thorium trends along a mapped fault. Data are being interpreted to refine deeper gold and rare earth drill targets. No drilling results.

Discuss in chat

23 Jan 2026capital raising announcement▲ GoodMajor

Dateline raised A$35m in an institutional placement at A$0.31 per share (112.9m shares, 3.1% of capital), lifting cash to over A$58m. Directors committed A$1.35m, subject to shareholder approval. Funds go to the Colosseum BFS, drilling and long-lead items; it also plans a shift to US reporting standards. This explains the 21 January trading pause.

What it means for a shareholder

113m new shares at about A$0.310 to raise about A$35.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.

Create a free account to see this worked out for your own holding.

Discuss in chat

21 Jan 2026other● NeutralMajor

ASX paused trading in Dateline's shares pending a further announcement. No reason is given in the notice.

Discuss in chat

19 Jan 2026investor presentation▲ Good

BFS update: leach tests confirm 91-92% gold recovery, in line with the Scoping Study's 92%, and geotechnical work supports a possibly better pit design. Gold now over US$4,600/oz versus US$2,900 used in the scoping update; BFS still due Q1 2026.

Discuss in chat

12 Jan 2026drilling result▲ GoodMajor

Colosseum drilling reports wide gold intercepts, including 295.64m at 1.04 g/t Au (RC25-035) from surface, several outside the current resource envelope. The breccia pipe is still mineralised at ~300m RC depth and open northeast; diamond drilling will test deeper.

Discuss in chat

5 Jan 2026director officer appointment▲ GoodMajor

George Brack (Wheaton Precious Metals chair, 30+ years in mining finance) and Phillips Baker Jr (Hecla Mining CEO for 23 years) join as non-executive directors, lifting the board to six. The chairman says this adds experience as Colosseum moves toward production.

Discuss in chat

29 Dec 2025material agreement▲ GoodMajor

Dateline signed an option, costing up to US$200,000 in total, to lease ~27 acres at the base of the Colosseum mine road, including two wells the company says can supply 100% of project water. Lease runs 10 years plus a 5-year extension. BFS reaffirmed for Q1 2026.

Discuss in chat

23 Dec 2025other● Neutral

A further hearing on 23 December set a final hearing for 20 April 2026 in the USC dispute; Dateline voluntarily keeps the tenements' status quo until then. The company says the tenements are unconnected to Colosseum, which it says is progressing well.

Discuss in chat

23 Dec 2025other● Neutral

USC's version of the 23 December hearing: Baghdadi and Dateline, including subsidiaries, gave a further undertaking to hold the tenements' status quo on 14 business days' notice. The trial is listed to begin 20 April 2026 for about 5 days.

Discuss in chat

15 Dec 2025drilling result▲ Good

Twelve more Colosseum RC holes reported, with highlights of 62.48m at 2.52 g/t Au (RC25-002) and 108.20m at 1.18 g/t (RC25-006). The company says high-grade cores exceed the resource grade in the North Pit, the planned first mining area. One rig is running until the Christmas break.

Discuss in chat

12 Dec 2025other● Neutral

Dateline reports the 11 December preliminary hearing: no findings, a timetable was set for USC to give more detail on its claim, and Baghdadi agreed to maintain the status quo on the tenements until the 23 December hearing. The company will defend vigorously.

Discuss in chat

12 Dec 2025other▼ Bad

USC (another company's announcement) says Dateline has been joined to the Federal Court case over the REE tenements. Baghdadi gave an undertaking, for himself and Dateline, not to dispose of the tenements; the next hearing is set for 23 December 2025.

Discuss in chat

9 Dec 2025other▼ BadMajor

Dateline responds to US 1 Critical Minerals (formerly Gladiator) starting legal proceedings against CEO Baghdadi over US rare earth tenements. The board denies any contract with USC, says it will defend vigorously, and that any tenements secured would benefit Dateline shareholders.

Discuss in chat

3 Dec 2025drilling result▲ Good

Two more Colosseum North Pipe RC holes: 64.0m at 1.24 g/t Au from surface (RC25-001) and 132.58m at 0.95 g/t (RC25-004). Company says both beat the grade of the Indicated resource blocks they hit; a new resource estimate is expected early 2026.

Discuss in chat

1 Dec 2025security holder rights change● Neutral

Shareholders approved on 28 November 2025 the repeal and replacement of Dateline's constitution; the new K&L Gates-prepared constitution is attached. Administrative; the visible text does not describe specific changes to shareholder rights.

Discuss in chat

28 Nov 2025other▲ Good

Chairman's AGM address says BFS remains on track for completion in Q1 2026, with construction to follow shortly after and mining approvals already secured. Notes gold above US$4,100/oz versus the US$2,900 used in the May scoping update. Mostly repeats known facts.

Discuss in chat

28 Nov 2025admin correction● Neutral

Amended re-release of the 18 November drilling announcement, adding a plan view of the holes and a table of results. The intercepts (85.34m at 1.33 g/t and 61.26m at 1.18 g/t, both from 0m) are unchanged.

Discuss in chat

28 Nov 2025investor presentation● Neutral

2025 AGM presentation on the Colosseum Gold-REE Project. The visible text is only the title slide and disclaimers; no new figures or results are shown, and the rest is truncated.

Discuss in chat

18 Nov 2025drilling result▲ GoodMajor

First BFS infill assays at Colosseum: 85.34m at 1.33 g/t Au (RC25-020, below the pit) and 61.26m at 1.18 g/t Au (CM25-19, partial). Company says results match expectations and support upgrading Inferred resource (33% of the 1.1Moz) to higher confidence.

Discuss in chat

27 Oct 2025drilling progress report▲ Good

Colosseum BFS drilling is 67% done (32 holes, 4,257m), due to finish about 7 November, with three rigs on site. Sonic drilling found the tailings facility foundation stable. Stockpile drilling (~1Mt at ~1 g/t, ~30koz) is planned; gold and REE target drilling starts early November.

Discuss in chat

22 Oct 2025other▲ Good

Managing Director Stephen Baghdadi exercised 13.86m options, paying about A$277,000, lifting his holding to 410.75m shares (~12%). He has put in almost A$1.35m since June 2025. Company states cash is over A$32m.

Discuss in chat