History
Blaze moved from video technology to uranium, copper-gold, gold, nickel, lithium and zinc-lead, funded by heavy dilution, and by September 2026 was pursuing Botswana copper and Ugandan tungsten.
2006-2009: From technology to uranium
The record opens with Blaze as a technology company built around PIXe video technology and Kemeleon animation tools. In the half-year to 31 December 2005 it wrote $5.82m off PIXe's carrying value, and for the year to June 2006 the loss was $9.2m, including an $8.8m impairment because PIXe missed its target of a 100% improvement. Kemeleon was launched in China in May 2006, though no revenue figures were given.
In February 2007 Blaze agreed to buy Yeelirrie Minerals, which held uranium tenements around BHP Billiton's 52,000t U3O8 deposit. The purchase was completed for 75m shares. The 2007 profit of $3.58m came entirely from a $4.375m cancellation of unallotted shares and options. By 2008 the board said PIXe and Kemeleon were performing below expectations, and the Managing Director resigned. In 2009 shareholder Colbern Nominees moved to remove the board. The contest ended in October with three directors replaced by new ones who wanted a 'new direction'.
2010-2013: Yeelirrie and a long fade
The new management dropped the earlier shallow drilling plan, saying better targets existed. It raised $240,000 in April 2010 and completed a placement of over $1.2 million by July. In September 2012 Blaze raised $11,280,000 by placing 1.6 billion shares at 0.08c. That sharply increased the share count. Site visits found no notable mineralised outcrop, while Cameco was acquiring BHP's adjacent project for over $410m. By mid-2013 no fieldwork was being done, a licence had been relinquished and three licences of 108.3 sq km remained.
2013-2015: Barkly copper-gold
In September 2013 Blaze signed a farm-in with Meteoric Resources over the Barkly copper-gold project near Tennant Creek, raising $420,000 at 0.04c. Its first drilling at Bluebird, in June 2014, hit 25m at 1.9% copper, and a diamond hole in July returned 20m at 8.17 g/t gold. Blaze then placed 349 million shares at 0.08c for $279,200 and arranged up to $1.25 million of convertible notes. ASX found the placement breached a listing rule, and Blaze undertook not to issue equity without shareholder approval until 31 March 2015. The last Yeelirrie licence was relinquished. Later drilling gave thick copper intersections but left the high-grade gold contact untested. In May 2015 Blaze lifted its interest to 70% and chose to fund to feasibility for 80%.
2015-2017: Lithium attempt and a clean-out
Cash was thin. Blaze placed shares in 2015 and early 2016, including $1.52 million at 4 cents, and the board was overhauled. In August 2016 it took an option on the Marble Bar Lithium Project. Drilling began in November but 12 holes hit pegmatite only 2-4m wide, and in December the option lapsed. In May 2017 Blaze finished transferring Colour Minerals and K2Fly to KMM to settle a management dispute, which also ended its Barkly interest.
2017-2022: Gold, then nickel
After a period with no projects, Blaze bought the Thundelarra licence in December 2017. It then bought Everest Minerals for 48,520,012 shares, gaining the Kirkalocka gold option, which it exercised for $100,000 in May 2018. A $1,587,666 placement at 5c followed, and the March 2018 quarter showed cash of $3.334m. In 2019 it added the Leonora gold project through new director Simon Coxhell, but aircore drilling found little. A placement in July 2020 lifted shares by a quarter. Mt Magnet South drilling in January 2021 disappointed. Blaze turned to nickel, but Jimberlana RC drilling in June 2022 found no anomalous results. In April 2022 327,491,754 options lapsed unexercised, raising nothing.
2021-2024: Zinc-lead and Canadian lithium
In May 2021 Blaze agreed to buy owners of Earaheedy Basin tenement applications next to Rumble's zinc-lead discovery. Stage one drilling in 2022 found anomalous base metals in 9 of 21 holes. In 2023 Blaze signed for the North Spirit Lithium project in Ontario, with rock samples up to 4.04% Li2O. Rumble bought the Earaheedy tenements for 2,291,047 Rumble shares (about $250,000), completed in March 2024. Blaze terminated North Spirit in June 2024, citing results and ongoing costs.
2024-2026: Uganda, Congo, Botswana
In October 2024 Blaze agreed to buy 60% of Gecko Minerals Uganda and raised about $1.25M at $0.004 to drill. Ntungamo drilling produced a gallium-rubidium discovery, with low absolute grades, and a strategic review began. Blaze agreed to buy 80% of the Loulombo project in Congo and raised $2.422M at $0.002. Drilling was halted in November 2025 when site security could not be guaranteed, and Blaze withdrew in December. Shares on issue rose to 2,925,000,000.
In March 2026 Blaze agreed to acquire up to 90% of three Botswana copper projects, completing the initial 70% by June. Trenching at Krokodil sent 89 samples to a laboratory, with results not yet seen. On 3 September 2026 it agreed to acquire up to 90% of two Ugandan tungsten projects, with sampling up to 20.78% WO3 over 1m, and secured commitments for a $2.25M placement of 4.5 billion shares at $0.0005. A 20-for-1 share consolidation was proposed, to be voted on around 21 October 2026.
Written from the 85 story beats below (2006 to 3 Sept 2026), which come from the company's own announcements and filings.