Each one in plain English, with the numbers worked through for a shareholder.
29 Mar 2022drilling scheduled▲ Good
A project-wide review identified five large conceptual targets at Mt Alexander, including the Ida Fault, Radar/Fish Hook and the granite-greenstone contact. A larger seismic survey is planned from April. A 22,800 Siemens West End conductor suggests mineralisation is open towards the Ida Fault. These are targets, not discoveries.
The placement completed with 92,307,692 shares issued at $0.052; the Prineas $200,000 portion awaits shareholder approval. 1,923,077 shares also went to drilling contractor DDH1. Shares on issue are now 683,421,706. The SPP is open.
What it means for a shareholder
92.3m new shares at $0.052 to raise about $4.8m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Share Purchase Plan offer letter: eligible holders can buy $2,000 to $30,000 of shares at $0.052, a 9.4% discount to the five-day VWAP, closing 13 April 2022. Targets $1.0m, up to $2.0m. Terms of the previously announced raising; no new figures.
17 Mar 2022capital raising announcement● NeutralMajor
Placement raises $5.0m at $0.052 per share (96,153,846 shares), led by Canaccord. A Share Purchase Plan up to $30,000 per holder at the same price targets $1.0m, up to $2.0m. Prineas ($200,000, subject to approval) and Hanna ($100,000) are participating. This is below the May 2021 raise price of $0.082.
What it means for a shareholder
96.2m new shares at about $0.052 to raise about $5.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Half-year to 31 December 2021: loss of $4.48m (prior period $4.75m), including $3.40m exploration expense, $0.97m administration and revenue of $34,363. Operations review restates known Mt Alexander results; cash balance not in the text provided.
Julian Hanna, co-founder and former Managing Director of Western Areas (2000-2012) and ex-MOD Resources MD, joins as General Manager, Growth and Development. Not a board appointment.
XPS metallurgical testwork on Stricklands ore produced a nickel concentrate of 11.5% Ni and a copper concentrate of 27.8% Cu, with palladium, platinum, cobalt and gold credits and no deleterious elements. This supports the starter mine concept; a massive sulphide lens about 350m west is prioritised for drilling.
A downhole survey in MAD204 found a 76,000 Siemens conductor at West End, near the earlier 81,000 Siemens conductor, suggesting a possible 70m+ horizon open at depth. Flora surveys found no issues for mining. MAD207 (S2) is at 272m of 660m.
MAD206 reached 1,003.9m and hit the Cathedrals Belt fault where seismic predicted, but only a thin 0.5m mafic intrusive with no sulphides, too small to explain the S1 reflector. MAD207 is drilling S2. More seismic lines and Stricklands metallurgy and EM targets planned.
Final seismic modelling adds three more drill targets, S3, S4 and S5, to S1 and S2. S3 sits in the 75%-owned E29/638 and the others are on 100%-owned E29/548. MAD206 testing S1 is at 398m, with two crews drilling 24/7. No drilling results yet.
Notice that the registered office and principal administrative address changes to Suite 2, Level 2, 28 Ord Street, West Perth, effective immediately. Contact numbers are unchanged. Administrative only.
Diamond drilling of seismic target S1 (hole MAD206, planned 990m) has started at Mt Alexander, the first drilling of seismic targets. Interim CSIRO work dates the Cathedrals Belt intrusions at about 1.1Ga, linking them to the Warakurna Large Igneous Province.
The 2022 diamond program is brought forward, with a rig due at Mt Alexander about 6 January 2022 to drill S1 then S2. MAD205 finished at 622.2m with no sulphides seen, so the MAD200 conductor target went untested by a successful hole.
Seismic interpretation identified a second large target, S2, in the Transits Belt north of the Cathedrals Belt. It has a 400m dip extent from about 350m depth and the same seismic properties as S1. It will be drilled in the late January program. MAD205 is nearly complete.
Seismic identified a large target (S1) down-dip of the shallow Investigators massive sulphides, with the same signature as the known sulphides. It has a modelled dip-extent of over 450m, lies about 800m deep on 100%-owned E29/548, and drilling is planned for late January. It is a target, not a discovery.
Appendix 4G for the year ended 30 June 2021, a routine corporate governance compliance form dated 1 September 2021. It has no operational or financial news and appears to be a re-lodgement of the earlier filing.
Diamond drilling of deeper targets has started at Mt Alexander, running 24/7. Four holes are planned (MAD203-206) to test the 81,000 Siemens MAD202 conductor, the MAD200 conductor and step-outs from the MAD199 discovery (11.07m @ 1.58% Ni). No new results yet.
Presentation for the Australian Nickel Conference, where SGQ is a major sponsor. It restates known Mt Alexander results, including MAD199 and MAD201; no new information is evident in the text provided.
RC drilling at Carnac intersected mafic-ultramafic rocks up to 85m thick, and at Jailbreak (E29/962) komatiite up to 270m thick, based on logging only. Assays are pending. A seismic survey has started, and diamond rigs are due at Mt Alexander and Paterson.
Appendix 4G and corporate governance statement for year ended 30 June 2021, a routine compliance filing lodged with the annual report. No operational or financial news.
2021 annual report. The chairman's letter highlights the MAD199 deep discovery, Paterson maiden drilling, Stricklands scoping study and the new Broadview Project in the Wheatbelt. Financial figures are not in the text provided.
Downhole EM in MAD202 at West End found a strong 81,000 Siemens conductor, consistent with massive sulphides. MAD201 assays confirmed 2.4m @ 1.66% Ni, 0.55% Cu, 125m down-plunge of MAD199. The conductor is untested; drilling is needed to confirm mineralisation.
RC drilling resumed at Mt Alexander, testing the Carnac, E29/972 magnetic and E29/962 soil targets on 100%-owned ground. Infill drilling at the shallow Cathedrals Prospect will also test continuity ahead of a potential resource estimate.
Paterson maiden program: 35 holes (6,264m) done, with chalcopyrite and pathfinder elements by XRF and petrography; first assays due next month. The RC rig moves to Mt Alexander, and diamond drilling is set for October after an airborne EM survey.
Soil assays at 100%-owned E29/1041 show a nickel-copper-chromium anomaly over 1,600m (peak 544ppm Ni, 97ppm Cu), above levels seen at the Cathedrals Belt. Named the Carnac Prospect, drilling is planned for mid to late August. Early-stage; no drilling yet.
Paterson maiden drilling: 18 holes (3,338m) done. Basement rocks include chalcopyrite-bearing intrusives and gossanous sediments, with elevated pathfinder elements by XRF. Cover is under 180m. Assays are pending; a diamond rig is being sought.
Downhole EM in MAD200 found three weak-to-moderate conductors, the largest 75m to the north-west; MAD196's three strong conductors remain untested. A seismic survey starts next week, and Stricklands scoping is trialling ore-sorting and glycine leaching.
Assays confirm the MAD199 discovery: 11.07m @ 1.58% Ni, 0.71% Cu from 333.5m, including 1.28m @ 6.54% Ni. This resolves the pending assays, replacing XRF-only readings. Deep radar survey is underway and a seismic survey is scheduled for next month.
Maiden drilling began at the 100%-owned Paterson Project: about 10,000m of reverse circulation drilling, roughly 50 holes over eight weeks, targeting copper and gold on E45/5226. This follows the planned June quarter start.
Notice that an audiovisual presentation by the Executive Chairman was published by The Assay on 2 June. It is a pointer to a video and carries no new results.