Each one in plain English, with the numbers worked through for a shareholder.
12 Mar 2024half year report● Neutral
Half-year to 31 December 2023: loss of $4.97m (prior year $4.87m), with exploration expenditure of $3.19m written off and administration costs of $1.64m. Operations section recaps Destiny, Mt Alexander, Lithium Star and Ajana. Cash balance not shown in the excerpt.
6,064,435 shares issued for the March 2023 Chariot/Stallion lithium tenement acquisition come out of 12-month voluntary escrow on 21 March 2024, so they become freely tradable. Administrative notice only.
Follow-up aircore drilling (minimum 26 holes, over 1,000m) has started at Destiny after December's rare earths discovery. An auger soil survey is complete with assays pending, six circular magnetic features up to 2.5km may be carbonatites, and a new 200 sq km licence (E63/2350) was granted.
Mt Alexander soil sampling (1,421 samples) found several large lithium anomalies, the biggest over 2.7km long, including one 1.7km x 1.3km along strike from the Manta 121m pegmatite. Drilling at these untested targets is set for March 2024; ERM engaged to help target.
December quarter report recaps Mt Alexander soil sampling, the Destiny rare earths discovery, ATL's $3m Lithium Star investment and Jayson's $3m at $0.038 plus $2m placement, lifting cash by $8m. Mt Alexander drilling and Destiny follow-up are scheduled for Q1 2024. No new results.
17 Jan 2024asset acquisition disposition▲ GoodMajor
St George acquired the Prince of Wales licence (E15/1687) next to Destiny, adding about 8km of the Ida Fault to the ~90km already held. Price is 4,411,765 shares plus a 1% net smelter royalty. Destiny drilling is due to start later in January.
Kecheng Cai, Jayson's Head of Investment & Strategy, joined the board as a non-executive director from 1 January 2024. Jayson became largest shareholder (11.73%) in November 2023, so this gives it a board seat. Fee in line with other non-executives.
Exploration update: Mt Alexander soil and rock-chip assays due mid-January, with 2024 drilling set for February. Destiny drilling starts January. ATL's $3m Lithium Star investment is completed. No new results.
Maiden aircore drilling at the Destiny (formerly Woolgangie) Project found a clay-hosted rare earths system over 7km: best 30m @ 1,885ppm TREO, and up to 5,125ppm TREO over 2m. Less than 10% of the target is tested. A new commodity for the company.
Presentation to a batteries conference in Shenzhen on the Western Australian lithium industry and St George's lithium strategy, aimed at battery-sector investors. Mostly industry background; no new results.
AGM presentation restating the lithium strategy, Mt Alexander field work, the ATL investment and Destiny and Ajana progress. Says Mt Alexander assays are due shortly with drilling in early 2024, and cites a market cap of about $35 million. No new results.
ASX notice that the suspension will be lifted immediately after St George releases its announcement on the strategic investment. Administrative; no new information.
Shanghai Jayson invests a further $3 million at $0.038 per share (78,947,368 shares), becoming largest shareholder with 11.73%. A further $2 million placement of 52,631,578 shares at $0.038 was committed, lifting cash by $8 million this quarter. This resolves the suspension. Price is well below the $0.068 of 2022.
What it means for a shareholder
52.6m new shares at $0.038 to raise about $2.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
St George asked to extend its voluntary suspension to finalise discussions on a material transaction including a strategic investment. The extension runs until an announcement or normal trading on 10 November 2023. No terms are given yet.
At its own request, St George's shares were suspended from trading pending an announcement about a material corporate transaction that includes a strategic investment in the company. The request ran until the earlier of an announcement or trading on 7 November.
September quarter report restates Mt Alexander field work, Lithium Star completion and the post-quarter ATL $3m investment for 10% of Lithium Star. Says talks continue with other battery players on a strategic investment in St George. Quarter cash figures not shown in the excerpt.
Lithium field work (soil, mapping, outcrop sampling) restarted at Mt Alexander, covering an 8km zone around Manta and a 4km zone at Jailbreak, after drilling was paused in May. First assays are expected in about four weeks. No new results.
Amperex Technology (ATL) will invest $3 million for a 10% stake in subsidiary Lithium Star, leaving St George with 90%. Funds will accelerate exploration of the seven lithium projects acquired in August; field work starts this month. Further ATL investment possible on terms to be agreed.
2023 Annual Report (year to 30 June 2023) with Chairman's letter: strategy unchanged, focus on Mt Alexander lithium, 121m Manta pegmatite, new Woolgangie and Lithium Star projects, Ajana drilling begun after year end. Financial figures not shown in the excerpt.
Appendix 4G confirming the corporate governance statement for the year to 30 June 2023, approved by the board. Administrative; no financial or exploration information.
Administrative notice: Computershare's Perth office moves to 221 St Georges Terrace from 18 September 2023. No impact on shareholders beyond the address for lodging documents.
Field exploration started at Woolgangie, optioned in February: 2,500m aircore for rare earths, plus magnetic and EM surveys and lithium sampling. Landholding is now 3,350 sq km, including 13 further licence applications. Mt Alexander and Lithium Star lithium programmes are planned for Q4.
First drilling at Ajana found zinc, lead and silver, best 11m @ 1.2% Zn+Pb from 138m (AJRC009), over 2.2km x 2.5km at Perseverant. The nickel-copper target's magnetic source is not yet explained. Four diamond holes await assays in 4-6 weeks.
St George completed the acquisition of seven lithium projects (14 licences, 653 sq km) through subsidiary Lithium Star, now 100% owned. This completes the deal announced 22 March 2023. Exploration is planned in 2023, prioritising Split Rock, Buningonia and Myuna Rocks. Price not shown in the excerpt.
June quarter report restates Jailbreak lithium (peak 1.77% Li2O), the fractionated 121m Manta pegmatite, and Ajana drilling start. Lithium Star completion is due early Q3. Woolgangie and Paterson work are planned for Q3. No new results are shown in the excerpt.
Assays for MAD213 at Manta indicate locally fractionated pegmatites across the 120.8m interval, possibly the distal part of a lithium system. Jailbreak assays peak at 1.28% Li2O. Pegmatites now found across 2km of a 15km corridor. Manta lithium grades appear low (max 200ppm Li2O).
Maiden drilling began at the 100%-owned Ajana Project, north of Perth: 17 holes for about 3,000m testing two nickel-copper-PGE targets (a 25km and a 2km magnetic anomaly). This starts the Ajana drilling previously awaiting access. No results yet.
St George answered ASX's 25 May price query. It said it held some incomplete Mt Alexander assay information but did not believe it explained trading, and planned to report once all results were in. It released the exploration update on 29 May. Drilling paused 19 May.
Further 2023 Jailbreak RC assays show lithium peaks of 1.77% and 1.49% Li2O, with anomalous lithium, caesium, tantalum and tin up to 16m thick. 851 samples are still pending, including MAD213 (Manta). Drilling is paused pending review. This follows the 25 May trading pause.