Each one in plain English, with the numbers worked through for a shareholder.
9 Nov 2023capital raising announcement▲ GoodMajor
Shanghai Jayson invests a further $3 million at $0.038 per share (78,947,368 shares), becoming largest shareholder with 11.73%. A further $2 million placement of 52,631,578 shares at $0.038 was committed, lifting cash by $8 million this quarter. This resolves the suspension. Price is well below the $0.068 of 2022.
What it means for a shareholder
52.6m new shares at $0.038 to raise about $2.0m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
St George asked to extend its voluntary suspension to finalise discussions on a material transaction including a strategic investment. The extension runs until an announcement or normal trading on 10 November 2023. No terms are given yet.
At its own request, St George's shares were suspended from trading pending an announcement about a material corporate transaction that includes a strategic investment in the company. The request ran until the earlier of an announcement or trading on 7 November.
Lithium field work (soil, mapping, outcrop sampling) restarted at Mt Alexander, covering an 8km zone around Manta and a 4km zone at Jailbreak, after drilling was paused in May. First assays are expected in about four weeks. No new results.
Amperex Technology (ATL) will invest $3 million for a 10% stake in subsidiary Lithium Star, leaving St George with 90%. Funds will accelerate exploration of the seven lithium projects acquired in August; field work starts this month. Further ATL investment possible on terms to be agreed.
2023 Annual Report (year to 30 June 2023) with Chairman's letter: strategy unchanged, focus on Mt Alexander lithium, 121m Manta pegmatite, new Woolgangie and Lithium Star projects, Ajana drilling begun after year end. Financial figures not shown in the excerpt.
Appendix 4G confirming the corporate governance statement for the year to 30 June 2023, approved by the board. Administrative; no financial or exploration information.
Administrative notice: Computershare's Perth office moves to 221 St Georges Terrace from 18 September 2023. No impact on shareholders beyond the address for lodging documents.
Field exploration started at Woolgangie, optioned in February: 2,500m aircore for rare earths, plus magnetic and EM surveys and lithium sampling. Landholding is now 3,350 sq km, including 13 further licence applications. Mt Alexander and Lithium Star lithium programmes are planned for Q4.
First drilling at Ajana found zinc, lead and silver, best 11m @ 1.2% Zn+Pb from 138m (AJRC009), over 2.2km x 2.5km at Perseverant. The nickel-copper target's magnetic source is not yet explained. Four diamond holes await assays in 4-6 weeks.
St George completed the acquisition of seven lithium projects (14 licences, 653 sq km) through subsidiary Lithium Star, now 100% owned. This completes the deal announced 22 March 2023. Exploration is planned in 2023, prioritising Split Rock, Buningonia and Myuna Rocks. Price not shown in the excerpt.
Assays for MAD213 at Manta indicate locally fractionated pegmatites across the 120.8m interval, possibly the distal part of a lithium system. Jailbreak assays peak at 1.28% Li2O. Pegmatites now found across 2km of a 15km corridor. Manta lithium grades appear low (max 200ppm Li2O).
Maiden drilling began at the 100%-owned Ajana Project, north of Perth: 17 holes for about 3,000m testing two nickel-copper-PGE targets (a 25km and a 2km magnetic anomaly). This starts the Ajana drilling previously awaiting access. No results yet.
St George answered ASX's 25 May price query. It said it held some incomplete Mt Alexander assay information but did not believe it explained trading, and planned to report once all results were in. It released the exploration update on 29 May. Drilling paused 19 May.
Further 2023 Jailbreak RC assays show lithium peaks of 1.77% and 1.49% Li2O, with anomalous lithium, caesium, tantalum and tin up to 16m thick. 851 samples are still pending, including MAD213 (Manta). Drilling is paused pending review. This follows the 25 May trading pause.
RIU Resources Conference presentation repeating known projects and partners. Corporate snapshot: 840,510,549 shares, $0.04 share price (5 May), about $36m market cap, $5.7m cash at 31 March 2023, no debt. No new results.
Diamond hole MAD213 at the Manta seismic reflector, once a nickel target, hit a continuous 120.8m pegmatite interval (225m total pegmatite in the hole). Visual logging only; assays are pending and lithium content is unknown. More Manta drilling is planned from April.
Presentation to the Ord Minnett East Coast Mining Conference, apparently largely the same as the Paydirt deck from two days earlier. No new results or financial information.
22 Mar 2023asset acquisition disposition▲ GoodMajor
St George agreed to acquire 100% of seven lithium projects (14 exploration licences, 653 sq km, 13 granted) from Chariot Corporation and Stallion Lithium via subsidiary Lithium Star. Adds to the Woolgangie option and Mt Holland agreement. Price is not shown in the excerpt.
Presentation to Paydirt's Battery Minerals Conference repeating known projects and partners. Corporate snapshot: 837,385,549 shares, $0.06 share price (17 Mar), about $50m market cap, $6.3m cash at 31 Dec 2022, no debt. No new results.
Half-year to 31 December 2022: loss of $4,867,394 (prior year $4,481,157), including $3,657,737 exploration expenditure written off. Revenue was $49,596. Report repeats lithium drilling results, and says nickel holes found massive sulphides but no apparent nickel sulphide mineralisation.
RC drilling began at Mt Alexander, with 20,000m planned in H1 2023. First assays from the 2022 maiden holes found anomalous lithium in every pegmatite tested, six intersections above 1% Li2O, peak 1.8%, thickest 14m. Five holes still await assays.
St George signed a binding Area of Influence agreement with private company Cacique giving it rights to potentially acquire 80% of lithium and nickel rights in tenements within 30km of the Bounty gold mine tailings, Mt Holland. Upfront cost is $150,000 cash plus 3,125,000 shares, subject to shareholder approval.
New rock chip assays at Jailbreak returned up to 2.8% Li2O, extending the high-grade area about 450m along strike. Field sampling resumed 15 January and 2023 drilling is due late February, with 20,000m planned in H1. These are surface samples, not drilling results.
2 Feb 2023asset acquisition disposition▲ GoodMajor
St George took a binding option, exercisable by 2 February 2025, to acquire 100% of the Woolgangie Project: nine exploration licences (two granted, seven in application) covering about 1,200 sq km in the Eastern Goldfields, prospective for lithium. Option price not shown in the excerpt.
Re-issue of the 21 December lithium release with an expanded cautionary statement that visual pegmatite logging does not confirm lithium grade or abundance. Results are unchanged; laboratory assays are still required.
Maiden lithium drilling: 20 of 23 holes (2,409m) hit pegmatites with visual lithium minerals, to 200m vertical depth along 1.7km strike. Laboratory assays are still pending, so grades are unknown. A 20,000m program is planned for 2023, with drilling from February.
21 Dec 2022capital raising announcement▲ GoodMajor
Sunwoda subsidiary Xinwei agreed to invest $2m in a placement at $0.086 per share, with a non-binding two-year MoU. It gives Sunwoda a first right to no more than 15% of potential Mt Alexander lithium product. A third battery-industry partner after Jayson and SVOLT.
Computershare top 20 optionholder list at 13 Dec 2022 for 37,188,238 listed options held by 116 holders. Cong Ming holds 26.89%, Hong Kong Jayson Holding 16.13% and Zenix Nominees 16.13%. Administrative, no new developments.