Each one in plain English, with the numbers worked through for a shareholder.
30 Apr 2014quarterly activities report● Neutral
Quarter to 31 March 2014 restates the MLEM survey progress, DDN1 and Desert Dragon conductors, and McCarthy's arrival. Phase 1 drilling is still planned for mid-May 2014. Text is truncated, so no cash figures were captured.
Phase 1 drilling of EM conductors on the Stella Range belt is planned to start around 22 May 2014 with DDH1 Drilling, the company's first test of these conductors. FLEM over the DDN1 conductor refined its position along strike from DDNRC002. Phase 2 is scheduled for the second half of 2014.
The company announces a research report on it by RM Capital, which the company retains for research services. The announcement itself carries no new information about the projects.
New strong EM conductors were identified at Desert Dragon, Desert Dragon North and Windsor, with Windsor 2 rated Category One and recommended for immediate drilling. The Plan of Works for 2014 drilling is approved, but the drilling contract is still being finalised. The MLEM survey has reached Bristol.
Matthew McCarthy, a senior nickel geologist from BHP Billiton Nickel West who started last month, was granted 100,000 Class B options (25c, expiring 28 Nov 2014) and 100,000 Class C options (40c, expiring 28 Nov 2015) for nil consideration under the incentive plan.
Assays for Desert Dragon holes DDD001 and DDD002 did not find nickel sulphides comparable to DRAC35 (18m @ 0.40% Ni), though they narrowed the search area. Modelling gives two new Category One DHEM conductors at 130m, with two diamond holes designed. DDD003 assays are still pending.
Half-year to 31 December 2013 shows a loss of $224,411 after a $595,579 R&D tax refund, with $782,047 exploration expenditure written off and $336,685 administration costs. Review of operations repeats known events, and consulting geologist Matthew McCarthy (ex-BHP Nickel West) is mentioned as engaged.
A Category One EM conductor at Desert Dragon North, about 500m south of DDNRC002 (2m @ 1.08% Ni), has a modelled strike length of about 800m and coincides with a magnetic high and elevated Ni-Cu soil values. Drilling is planned later in Q1 2014. It is a target, not a discovery.
Quarter to 31 December 2013: the moving loop EM survey found several strong anomalies on the Stella Range belt, and three Desert Dragon diamond holes (968m) hit komatiite with strong downhole conductors at 130-140m. Assays are now expected early February 2014. The $825,000 placement is restated.
Moving loop EM survey restarts after Christmas, with 643 stations read so far. Desert Dragon assays are due late January and drilling is aimed to restart this quarter once targets are modelled. No new results.
Ground moving loop EM has found several strong anomalies on the Stella Range belt, including near DDNRC002 (2m @ 1.08% Ni) and east of the Cambridge dunite. They may be massive sulphides but could have other sources. Modelling comes before 2014 drill targets are chosen.
Three Desert Dragon diamond holes (968m) hit thick komatiite with visible sulphides, and downhole EM found strong conductors in all three that could be massive sulphides. No assays yet, expected late January 2014; more holes planned after modelling.
6 Dec 2013capital raising announcement● NeutralMajor
The placement is completed: 7,500,000 shares issued at $0.11 to raise $825,000, taking shares on issue to 79,481,000. Funds go to the East Laverton nickel drilling underway. Confirms the 29 November announcement.
What it means for a shareholder
7.5m new shares at $0.110 to raise about $825,000. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Deep diamond drilling began at Desert Dragon, with three holes planned to test for massive nickel sulphides beneath the DRAC35 zone (18m @ 0.40% Ni). Nickel specialist Travis Kerslake joined, receiving 500,000 unlisted options. EM conductor results are due shortly.
29 Nov 2013capital raising announcement● NeutralMajor
St George announced an over-subscribed placement to sophisticated investors at $0.11 a share, up to 7,500,000 shares, to fund ongoing nickel exploration at East Laverton. The release header is dated 2012 but the content fits November 2013 (likely a typo). Follows the 2013 R&D rebate and earlier placements.
November 2013 presentation repeats known East Laverton results and says deep diamond drilling starts in the last week of November. It shows a market cap of about $10m at 14c on 71,981,000 shares. No new information of substance.
The company lists two recent media articles, one on WA nickel and one profiling the chairman, available on its website. No new information about the company's projects.
Deep diamond drilling of priority nickel targets is to start the following week, first at Desert Dragon near DRAC35 (18m @ 0.40% Ni, 2012). The programme is planned to run into 2014 after a Christmas break. EM results on the Stella Range belt are still being analysed.
Quarterly report to 30 September 2013 covers the 3 October consolidation of 100% of East Laverton nickel rights after BHP's exit, a combined database and new targets. It restates known drilling results and reports Stella Range tenure of over 60 strike-km. Text is truncated, so no cash figures captured.
A moving loop EM survey has started over the rest of the Cambridge dunite body and about 12 km of the Stella Range belt, where DRAC35 (18m @ 0.4% Ni) and DRAC38 sit. Test drilling is planned for November 2013. No new results.
A more powerful fixed loop EM survey has started over three Cambridge anomalies first seen by an older, weaker survey. Results will shape a targeted drill programme, with test drilling scheduled for next month. This follows the 17 October announcement that the survey was imminent.
St George received $595,000 from the R&D tax rebate (claimed at about $600,000) and $270,000 under the Project Dragon termination. It says it is fully funded for the rest of its 2013 exploration programme.
A soil survey and regolith mapping identified a new nickel prospect in southern Cambridge, where an EM anomaly coincides with anomalous soil nickel. A more powerful fixed loop EM survey is due within days, with a moving loop survey later in October, before any drilling.
Australian Nickel Conference presentation of 10 October 2013 repeats known Cambridge and Stella Range results and the 100% nickel ownership. It shows a market cap of about $7m at 10c, with 71,981,000 shares. No new information.
Following the 100% consolidation, St George picks six priority nickel targets across the three ultramafic belts and plans ground EM surveys, starting the following week, with initial results due this month. EM would identify conductors for later drilling; no drilling is scheduled yet.
After BHP's exit, St George holds 100% of all nickel rights at East Laverton, including the northern part of the Cambridge dunite body, and will run a property-wide programme. The company cites almost $3m of BHP-funded work and 35 RC holes (8,560m). This is a strategy change.
3 Oct 2013material agreement termination▼ BadMajor
BHP Billiton Nickel West withdrew from the Project Dragon farm-in, five months after exercising its option in May 2013. St George keeps 100% of the seven tenements and BHP pays a cash amount to maintain them. This reverses the BHP earn-in.
St George lodged its 2012/13 R&D tax incentive claim for about $600,000, expected to be processed in 4 to 6 weeks. This follows the $796,130 rebate received in January 2013 and will help fund Cambridge drilling, subject to review.
A geochemical review of the 2013 Cambridge drilling says the eastern and western margins are basal contacts and a high-MgO zone looks similar to Perseverance. Newexco is hired for geophysics. No new assay grades; the nickel sulphide potential remains untested.