Stockle - the stock oracle

St George Mining

ASX:SGQ
No current share price held for this company.
No price history held for this listing yet.
Market cap
—
Shares on issue
—
Story beats
220 since 2010
Last event
27 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

8 Oct 2013drilling scheduled● Neutral

Following the 100% consolidation, St George picks six priority nickel targets across the three ultramafic belts and plans ground EM surveys, starting the following week, with initial results due this month. EM would identify conductors for later drilling; no drilling is scheduled yet.

Discuss in chat

3 Oct 2013other● NeutralMajor

After BHP's exit, St George holds 100% of all nickel rights at East Laverton, including the northern part of the Cambridge dunite body, and will run a property-wide programme. The company cites almost $3m of BHP-funded work and 35 RC holes (8,560m). This is a strategy change.

Discuss in chat

3 Oct 2013material agreement termination▼ BadMajor

BHP Billiton Nickel West withdrew from the Project Dragon farm-in, five months after exercising its option in May 2013. St George keeps 100% of the seven tenements and BHP pays a cash amount to maintain them. This reverses the BHP earn-in.

Discuss in chat

25 Sept 2013other▲ Good

St George lodged its 2012/13 R&D tax incentive claim for about $600,000, expected to be processed in 4 to 6 weeks. This follows the $796,130 rebate received in January 2013 and will help fund Cambridge drilling, subject to review.

Discuss in chat

18 Sept 2013drilling result▲ Good

A geochemical review of the 2013 Cambridge drilling says the eastern and western margins are basal contacts and a high-MgO zone looks similar to Perseverance. Newexco is hired for geophysics. No new assay grades; the nickel sulphide potential remains untested.

Discuss in chat

11 Sept 2013other▲ Good

The company names the Oxford Nickel Prospect on the Minigwal belt, on tenement E39/982 (100% owned, over 15 strike-km), based on a review of earlier drilling and geophysics. An airborne EM survey is planned. This is a new target, not a drill result.

Discuss in chat

3 Sept 2013investor presentation● Neutral

September 2013 investor presentation repeats known Cambridge and East Laverton results. It shows 71,981,000 shares and a market cap of about $9m at 12c. No new announcements of substance.

Discuss in chat

28 Aug 2013drilling progress report● Neutral

Most lab assays from the first 2013 Cambridge drilling are in, and a supplementary soil survey has started to pick targets for phase two. The company says preliminary geochemistry supports nickel sulphide potential; no new grades are given, and a detailed review is promised.

Discuss in chat

16 Aug 2013annual report● Neutral

Annual report for the year to 30 June 2013 is released. The chairman's letter restates 2012 Stella Range nickel sulphide results, BHP's May 2013 Stage One election at Project Dragon, and 100%-owned Stella Range coverage of over 30 km. No new results in the extract.

Discuss in chat

7 Aug 2013other● Neutral

Notice that a Kalgoorlie Miner article of 5 August 2013, 'St George Confident in Nickel Find', is on the company website. No new information.

Discuss in chat

5 Aug 2013asset acquisition disposition▲ GoodMajor

Exploration licence E39/1722 was granted, extending 100%-owned coverage of the Stella Range nickel belt by 12 km north of Cambridge. East Laverton now holds over 60 strike-km of the belt. This resolves the pending application; an initial RC drill programme is planned.

Discuss in chat

29 July 2013drilling result▲ GoodMajor

Lab assays from the 2013 Cambridge drilling gave 19m @ 0.56% Ni in CAMRC-010 and 42m @ 0.26% Ni with over 40% MgO at the bottom of CAMRC-011. The company calls it a breakthrough that favours the central body. These are secondary enrichment results, not a sulphide discovery.

Discuss in chat

24 July 2013other● Neutral

Notice that a July 2013 Australia's Paydirt article, 'Project Dragon Ready to Breathe Fire', is on the company website. No new information.

Discuss in chat

29 May 2013farm in farm out completion▲ GoodMajor

BHP Billiton Nickel West exercised its option to start earning into Project Dragon, nominating seven exploration licences. It can earn 51% of the nickel rights by meeting Stage One spend. This resolves the option decision that had been extended to 28 May.

Discuss in chat

29 May 2013drilling progress report● Neutral

First phase of 2013 Cambridge drilling finished: 10 RC holes, 2,295m, with extensive ultramafic and anomalous nickel on field XRF. Results point to the central body for deeper testing. Two holes deferred for groundwater; lab assays due in about four weeks. Two possible gold areas noted.

Discuss in chat

8 May 2013capital raising announcement● Neutral

The 5,000,000 shares at $0.16 from the 30 April placement were allotted on 8 May 2013. Shares on issue are 71,981,000. Administrative completion with the Appendix 3B and cleansing notice.

What it means for a shareholder

5.0m new shares at $0.160 to raise about $800,000. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.

Create a free account to see this worked out for your own holding.

Discuss in chat

30 Apr 2013capital raising announcement● NeutralMajor

St George placed 5,000,000 shares at $0.16 to sophisticated investors, raising $800,000, capped despite oversubscription. Funds extend the 2013 Cambridge drilling. Shares on issue rise to 71,981,000; the price is below the 21c October 2012 placement.

What it means for a shareholder

5.0m new shares at $0.160 to raise about $800,000. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.

Create a free account to see this worked out for your own holding.

Discuss in chat

29 Apr 2013joint venture update● Neutral

St George granted BHP Billiton Nickel West a one-month extension of the Project Dragon option to 28 May 2013. This pushes out BHP's decision on earning a Stage One interest in the nickel rights.

Discuss in chat

23 Apr 2013drilling spud▲ GoodMajor

The 2013 drilling campaign started on 23 April, with 14 RC holes planned, each to 250m, beginning at Cambridge South on strike from earlier nickel sulphide intersections, then moving north. This follows the rig mobilisation flagged on 19 April; no results yet.

Discuss in chat

19 Apr 2013drilling scheduled▲ Good

Preparation is underway for the 2013 deep RC drilling at 100%-owned Cambridge, with 250m design holes and a rig arriving early the following week. Targets include new Cambridge South and North prospects on E39/1667 and E39/1666. Final targets are still to be announced.

Discuss in chat

11 Apr 2013drilling result▲ GoodMajor

Re-analysis found visible nickel sulphides in Desert Dragon hole DDNRC-002, with lab assay of 2m @ 1.08% Ni, the highest-grade nickel at East Laverton so far. Cambridge MgO is higher than first inferred. 2013 drilling is planned for late April or early May.

Discuss in chat

12 Mar 2013half year report● Neutral

Half-year to 31 December 2012: loss of $327,954 after $777,801 exploration spend written off, $358,086 administration costs and a $794,984 R&D tax refund. Operations text repeats known Cambridge and Project Dragon results.

Discuss in chat

30 Jan 2013drilling result▲ GoodMajor

Lab assays confirm Cambridge holes hit long nickel-bearing ultramafic, e.g. 160m @ 0.25% Ni (CAMRC-001) and 150m @ 0.22% Ni (CAMRC-002). The company says this supports nickel sulphide potential at depth. Holes were cut short; no sulphide discovery is reported.

Discuss in chat

22 Jan 2013drilling scheduled▲ Good

Infill soil sampling confirmed strongly anomalous rare earths over a 2km x 1.5km priority area at Red Dragon. Four 250m RC holes are planned for Q2 2013, with a $122,000 WA Government grant towards drilling costs.

Discuss in chat

15 Jan 2013other▲ Good

St George received a $796,129.62 cash R&D tax incentive payment for 2011/12, the rebate expected earlier. It comprises $794,984.40 rebate plus $1,145.22 interest. This resolves the open rebate thread.

Discuss in chat

17 Dec 2012drilling result● Neutral

Preliminary XRF on the two Cambridge holes shows long ultramafic intervals, best 14m @ 0.503% Ni and 8m @ 0.61% Ni. The company calls this likely shallow secondary enrichment, and says the holes only tested an upper, lower-MgO unit. Lab assays are due late January 2013.

Discuss in chat

26 Nov 2012drilling progress report● Neutral

Gold holes at Athena and Desert Dragon finished, showing strong alteration. Preliminary XRF gave 7m @ 0.53% Ni at Desert Dragon. Cambridge hole 1 finished (168m) and hole 2 stopped at 150m; drilling suspended by heavy rain. Assays still pending.

Discuss in chat

20 Nov 2012drilling scheduled▲ Good

Final EM and magnetic modelling at Cambridge shows the ultramafic body keeps its original orientation, implying a larger prospective basal contact. Three priority holes are set, two on the newly recognised western margin, with drilling due about 22 November 2012.

Discuss in chat

19 Nov 2012other● Neutral

A company-commissioned initiating research report by Independent Investment Research is available on the website. It is based on public information and is not company guidance. No new information.

Discuss in chat

12 Nov 2012drilling spud▲ Good

The 2012 RC drilling programme began at East Laverton, starting with gold targets at Desert Dragon and Athena, then Cambridge nickel. Preliminary EM results show several nickel drill targets at Cambridge; final targets are due within the week.

Discuss in chat