24 July 2015quarterly activities report● Neutral
June quarter report: the 2015 diamond campaign (over 2,500m, at least seven targets) began 3 June at East Laverton. Early holes show base metal sulphides and nickel-bearing ultramafics, but no massive nickel sulphide yet. DDNDD0001 DHEM survey is due shortly. Capital raisings boosted cash.
DDRDD0004 (379m), drilled east from the DRAC35 collar, hit several ultramafic units with anomalous nickel on provisional XRF, which the company says supports the eastern prospectivity model. DDRDD0007 has begun at the Dragon 8 gravity anomaly centre. No assays yet.
DDNDD0001 at Desert Dragon North reached 225m with ultramafic and sulphidic sediments and anomalous Ni, Cu, Zn on spot XRF; a shear zone was noted. Drilling is paused pending a DHEM survey. DDRDD0004 has started at Desert Dragon Central.
Three Desert Dragon Central targets are lined up, including Dragon 9 (443ms, 4900S), with drilling due from that week. The company interprets the eastern area as more prospective for nickel sulphides. Targets and interpretation, not results.
Aphrodite 4 hole APHDD0001 (400m) explained the conductor with about 30m of massive magnetite; nickel sulphides were not observed. This conductor test did not find nickel. Drilling began at Desert Dragon North beneath the 2m @ 1.08% Ni intersection.
DDRDD0005 finished at 429m; a sulphide interval at 293-300m showed spot XRF of 2% Cu and 2.9% Zn, supporting a base metal target. Drilling began on the Aphrodite 4 conductor (176ms, 2947S). Indicative XRF only; no nickel body found.
Dragon 8 hole DDRDD0003 (497.7m) found copper and zinc sulphides suggesting a possible VMS (base metal) system; the conductor was explained by pyrrhotite, not nickel sulphide. A hole at the gravity anomaly centre is planned. Visual and XRF only; assays pending.
ASX queried a rise from 8.8c to an intraday 10.5c with higher volume. The company said it knew of no unannounced information, pointing to its 22 and 26 June drilling releases, and noted no massive nickel sulphide has yet been intersected.
First conductor test at Desert Dragon Central (DDRDD0005, 260m) hit thick ultramafic with sulphides; spot XRF showed 1.55% Ni in a massive sulphide stringer, but no massive nickel body yet. Hole to be extended about 120m; Dragon 8 now drilling. Preliminary XRF only.
Drilling of the first electromagnetic conductor, below DDD001 at Desert Dragon Central, began 20 June. Cambridge's second hole (400m) showed lower nickel and magnesium than the first on preliminary XRF. Aphrodite drilling is deferred after storms. Indicative only; assays pending.
Gold Coast conference presentation repeats the RIU deck with updated capital: 131,839,670 shares, 18,602,469 listed options, market cap about $11m at 9c. Sarah Shipway now listed as director. No new results.
16 June 2015capital raising announcement▲ GoodMajor
Placement of 5,555,556 shares at $0.09 raises $500,000 from UK trust City Natural Resources High Yield Trust, with one free option per three shares. A shareholder meeting will ratify this and the 9 June raising. Priced above the 7c placement.
What it means for a shareholder
5.6m new shares at $0.090 to raise about $500,000. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Company Secretary Sarah Shipway, secretary since March 2012, is also appointed non-executive director to fill the vacancy left by Marcus Michael's death. She holds no company securities per the notice.
First hole CAMDD001 at Cambridge reached 500m; preliminary XRF shows a 132m interval (92-224m) averaging 0.35% Ni and 35% MgO, sulphur up to 2%. Indicative only, pending lab assays. A second hole is under way; Aphrodite 4 follows.
Non-executive director and founding shareholder Marcus Michael died on 11 June 2015 after a short illness. A final director's interest notice is attached. A board loss, not a change to operations.
Computershare, the share registry, notifies that its Perth office moves to 172 St Georges Terrace from 15 June 2015. Administrative notice; no company news.
9 June 2015capital raising announcement● NeutralMajor
Placement completed: 20,007,864 shares and 6,669,288 options allotted, raising $1,400,550 in total (the earlier 15m shares at 7c plus the oversubscription). Fee is 6% cash plus 1,152,857 options. Shares now 131,839,670.
What it means for a shareholder
15.0m new shares at $0.070 to raise about $1.4m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
The 2015 drilling campaign has started at East Laverton: over 2,500m planned at 7+ targets over 6-7 weeks. Cambridge is drilled first (500m hole), then Aphrodite 4; Dragon 9 is last. Drilling begins the campaign flagged since April.
1 June 2015capital raising announcement● NeutralMajor
Placement of 15,000,000 shares at $0.07 raises $1,050,000, led by Alto Capital, with one free option per three shares. Funds go to East Laverton drilling. A further 5,405,962 shares may be placed. First raising since the Sep/Oct 2014 placement at 9c.
What it means for a shareholder
15.0m new shares at $0.070 to raise about $1.1m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
DDH1 Drilling's rig is due on site 2 June 2015 for over 2,500m of diamond drilling at least seven targets over 6-7 weeks. Planned depths are mostly 220-300m, deepest 500m. Scheduling update only; no results.
Drill campaign expanded to at least seven targets, about 2,100m of diamond drilling over 6-7 weeks from the last week of May 2015. New targets include a basal contact test below DDNRC002 (2m @ 1.08% Ni) and three conductors near DRAC35. Targets, not results.
RIU Sydney presentation repeats known points: 100% of East Laverton, the 2015 technical review, 111,831,806 shares and market cap about $8m at 7c. No new results.
Dragon 9 (443ms, 4900 Siemens) is picked as the first drill target, with Dragon 8 (190ms, 3500 Siemens) and Aphrodite 4 also to be tested. Drilling is due in the last week of May 2015. Targets only, not results; Dragon 9 was Target 5 in March.
March quarter report repeats Windsor assays, the technical review and the Desert Dragon, Desert Dragon North and Aphrodite EM targets. No new results in the extract; cash position not shown.
New strong EM conductor, Aphrodite 4 (176ms, 2947 Siemens), selected for immediate drilling at a structural embayment. DDH1 Drilling has been engaged, with drilling due to start by end of April 2015. Target only, not a result.
Restates BHP Nickel West's 2012 Project Dragon drill results (35 holes, 8,560m) under the 2012 JORC Code. Administrative reporting update; no new drilling or change in results.
Presentation repeats known facts: 111,831,806 shares, 11,183,181 listed options, market cap about $8m at 7c, and the technical review's conclusions. No new results.
Two strong EM conductors (Targets 4 and 5) at Desert Dragon Central are recommended by Dr Hronsky for drilling. Target 5 has a 443ms time constant and 4900 Siemens conductance. Drilling is due to start early April 2015. Targets only, not a result.