Stockle - the stock oracle

St George Mining

ASX:SGQ
No current share price held for this company.
No price history held for this listing yet.
Market cap
—
Shares on issue
—
Story beats
220 since 2010
Last event
27 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

10 Nov 2015drilling progress report▲ Good

Four more Windsor holes completed (ten total, 3,231m), all with thick high-MgO ultramafic and some elevated nickel on XRF. The ultramafic now extends 1.5km, open north and south. The rig will then move to Desert Dragon conductors. WINRC012 was abandoned a second time at 120m.

Discuss in chat

9 Nov 2015capital raising announcement● NeutralMajor

St George raised $1.6m through a placement of 20,000,000 shares at $0.08, with one free option per two shares; RM Capital was lead manager. Funds go to more East Laverton drilling, Hawaii and Mt Alexander North and working capital. Shares on issue rise to 157,395,226.

What it means for a shareholder

20.0m new shares at $0.080 to raise about $1.6m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.

Create a free account to see this worked out for your own holding.

Discuss in chat

2 Nov 2015asset acquisition disposition▲ GoodMajor

Acquisition of 100% of the Hawaii and Mt Alexander North nickel projects from BHP Nickel West is completed, after conditions in the 17 September agreement were satisfied. It completes the deal announced 18 September for $40,000. Hawaii RC drilling is due in late November.

Discuss in chat

28 Oct 2015drilling progress report● Neutral

Six Windsor holes completed (1,998m), including WINRC016 with 215m of high-MgO ultramafic. Mineralisation extends north and south of discovery hole DRAC38. Interim XRF only; the rig will move to Desert Dragon while downhole EM surveys run. WINRC012 was abandoned after groundwater collapse.

Discuss in chat

21 Oct 2015drilling scheduled● Neutral

First field exploration has started at the Hawaii Project, with an 11 line-km moving loop EM survey. A first-ever RC drilling programme is scheduled for November 2015. The project was being acquired from BHP Nickel West; no results yet.

Discuss in chat

16 Oct 2015drilling result▲ Good

Second Windsor hole WINRC011 intersected 116m of mineralised ultramafic; interim XRF showed 8m averaging 0.44% Ni, peak 0.73% Ni over 1m. Lab assays are pending. The company says all holes on the eastern basal contact have hit nickel sulphides and/or PGE enrichment.

Discuss in chat

14 Oct 2015drilling result▲ Good

First Windsor hole WINRC010 reached 468m and hit thick high-MgO ultramafic with disseminated nickel sulphides on interim handheld XRF. Lab assays are pending. It is a first result from the campaign started 5 October; no massive sulphide reported.

Discuss in chat

14 Oct 2015investor presentation● Neutral

Presentation for the 121 Mining Investment Conference in Hong Kong. Repeats known project and capital structure information (137,395,226 shares, $10.9m market cap at 8c). No new results.

Discuss in chat

9 Oct 2015quarterly activities report● Neutral

Quarterly report to 30 September 2015: diamond drilling (11 holes, 4,119m) found nickel sulphide zones at Desert Dragon Central, with strong EM conductors to be tested. RC drilling began 5 October; Hawaii and Mt Alexander North acquired. Mostly repeats known results; no massive sulphide yet.

Discuss in chat

8 Oct 2015investor presentation● Neutral

New presentation for the Australian Nickel Conference in Perth, noting the drilling campaign started on Monday. Mostly repeats known facts; market cap shown as $10.9m at 8c on 137,395,226 shares.

Discuss in chat

7 Oct 2015drilling scheduled▲ Good

The North Dragon 1 conductor (2,396 Siemens, about 300m deep) found by DHEM at DDNDD0001 will be drilled after Windsor. It may relate to the nickel stringers in DDNRC002 (2m @ 1.08% Ni). A target, not a nickel result.

Discuss in chat

6 Oct 2015drilling spud▲ GoodMajor

Drilling has started at East Laverton: over 7,000m of RC planned, expected to take 6-7 weeks. Windsor is being drilled first (13 holes, about 4,000m), then Desert Dragon EM conductors. No new results yet.

Discuss in chat

30 Sept 2015other● Neutral

Notice that RM Research, retained by the company, has produced a research report on St George. No new exploration or financial information.

Discuss in chat

30 Sept 2015investor presentation● Neutral

New presentation for the RIU Resources conference, featuring targets for the 7,000m drilling campaign starting next week. Repeats known project and capital structure information (137,395,226 shares, $9.6m market cap at 7c).

Discuss in chat

29 Sept 2015other● Neutral

Notice that Breakaway Research has issued a report on the company, which the company has retained and paid for. No new exploration or financial information in the announcement itself.

Discuss in chat

29 Sept 2015drilling scheduled▲ Good

Five priority EM conductors at Desert Dragon Central will be drilled, including the 61,000 Siemens off-hole conductor near DDRDD0005, in a 7,000m programme starting 5 October. These are targets, not nickel results. Follows the earlier DHEM findings.

Discuss in chat

22 Sept 2015investor presentation● Neutral

New investor presentation for the Proactive forums, updating East Laverton progress and introducing the newly acquired Hawaii and Mt Alexander North projects. Capital structure shows 137,395,226 shares and market cap $9.6m at 7c. Largely repeats known facts.

Discuss in chat

18 Sept 2015asset acquisition disposition▲ GoodMajor

St George agreed to buy 100% of the Hawaii and Mt Alexander North nickel sulphide projects from BHP Billiton Nickel West for $40,000, plus tenement applications. Nickel West keeps offtake rights and 1% royalty, with a further 1% if 25,000t contained nickel is defined. Drilling planned for October.

Discuss in chat

14 Sept 2015investor presentation● Neutral

Invitation to shareholder briefings: Proactive forums in Melbourne (22 Sep) and Sydney (23 Sep), RIU conference 1 Oct and Australian Nickel Conference 8 Oct, tied to drilling restarting in early October 2015. No new exploration or financial information.

Discuss in chat

11 Sept 2015drilling scheduled▲ Good

The company says Windsor's nickel-bearing ultramafic runs over 2km but only 200m of its eastern contact has been tested; all holes there hit nickel sulphides and/or PGE enrichment. Over 4,000m of RC drilling is planned in the coming campaign.

Discuss in chat

8 Sept 2015other▲ Good

The company received $1,326,000 in cash from the R&D tax incentive for 2014/15, matching the claim lodged on 10 August (about $1.3m). It is the largest rebate in the record and boosts cash ahead of drilling resuming late September.

Discuss in chat

2 Sept 2015drilling result▲ Good

Final DDRDD0005 assays show more nickel sulphide in two ultramafic units, e.g. 5.6m @ 0.44% Ni from 231m. A very strong off-hole conductor (61,000 Siemens) sits below the hole. RC drilling is now due late September.

Discuss in chat

17 Aug 2015drilling result▲ GoodMajor

First assays at Desert Dragon Central confirm a wide disseminated nickel sulphide zone in the ultramafic found by DRAC35, e.g. DDRDD0004 7m @ 0.39% Ni from 43m. Zone extends over 300m down dip and remains open. No massive sulphide yet; follow-up drilling planned for September.

Discuss in chat

10 Aug 2015drilling result▼ BadMajor

Dragon 9 hole DDRDD0001 (436m) found no massive sulphide where the conductor was modelled, only pyrrhotite, magnetite and thin sulphide layers, with spot XRF up to 4.2% Cu. A data review will decide further testing. Drilling moved to Dragon 5; North Dragon 1 modelling supported.

Discuss in chat

10 Aug 2015annual report● Neutral

Annual Report for the year to 30 June 2015, repeating known exploration history. The chairman says registered shareholders grew from about 500 to over 1,400 and cites the October 2014 and June 2015 raisings. Financial figures not captured from the extract.

Discuss in chat

10 Aug 2015other● Neutral

Appendix 4G and corporate governance statement for FY to 30 June 2015, signed by the company secretary. Administrative filing with no new information on exploration or finances.

Discuss in chat

10 Aug 2015other▲ Good

Company lodged an R&D tax incentive claim for about $1,300,000 cash, which it expects the ATO to process in 4–6 weeks. The claim is subject to eligibility and possible review. Continues the annual rebate pattern.

Discuss in chat

3 Aug 2015drilling spud▲ GoodMajor

Drilling began on Dragon 9 (DDRDD0001), the 4900 Siemens, 443ms conductor the chairman called the standout target. A strong DHEM conductor was also found at DDRDD0004, DDRDD0002 finished at 550m, and a 5,000m+ RC programme is planned from late August or September.

Discuss in chat

29 July 2015drilling result▲ Good

Downhole EM on DDNDD0001 found a strong off-hole conductor, 'North Dragon 1', possibly the source of the 2m @ 1.08% Ni stringers in DDNRC002. Extending the hole would miss it, so a new hole will be designed after assays. A target, not a nickel result.

Discuss in chat

27 July 2015drilling result▲ Good

DDRDD0007 finished at 490m at the Dragon 8 gravity anomaly, with provisional spot XRF up to 6.5% Cu and a thick base-metal-rich unit over at least 500m strike, supporting the VMS idea. New targets Dragon 5 and Dragon 13; drilling began at Dragon 13 (DDRDD0002). Assays pending.

Discuss in chat