29 July 2013drilling result▲ GoodMajor
Lab assays from the 2013 Cambridge drilling gave 19m @ 0.56% Ni in CAMRC-010 and 42m @ 0.26% Ni with over 40% MgO at the bottom of CAMRC-011. The company calls it a breakthrough that favours the central body. These are secondary enrichment results, not a sulphide discovery.
BHP Billiton Nickel West exercised its option to start earning into Project Dragon, nominating seven exploration licences. It can earn 51% of the nickel rights by meeting Stage One spend. This resolves the option decision that had been extended to 28 May.
First phase of 2013 Cambridge drilling finished: 10 RC holes, 2,295m, with extensive ultramafic and anomalous nickel on field XRF. Results point to the central body for deeper testing. Two holes deferred for groundwater; lab assays due in about four weeks. Two possible gold areas noted.
The 2013 drilling campaign started on 23 April, with 14 RC holes planned, each to 250m, beginning at Cambridge South on strike from earlier nickel sulphide intersections, then moving north. This follows the rig mobilisation flagged on 19 April; no results yet.
Preparation is underway for the 2013 deep RC drilling at 100%-owned Cambridge, with 250m design holes and a rig arriving early the following week. Targets include new Cambridge South and North prospects on E39/1667 and E39/1666. Final targets are still to be announced.
Re-analysis found visible nickel sulphides in Desert Dragon hole DDNRC-002, with lab assay of 2m @ 1.08% Ni, the highest-grade nickel at East Laverton so far. Cambridge MgO is higher than first inferred. 2013 drilling is planned for late April or early May.
Lab assays confirm Cambridge holes hit long nickel-bearing ultramafic, e.g. 160m @ 0.25% Ni (CAMRC-001) and 150m @ 0.22% Ni (CAMRC-002). The company says this supports nickel sulphide potential at depth. Holes were cut short; no sulphide discovery is reported.
Infill soil sampling confirmed strongly anomalous rare earths over a 2km x 1.5km priority area at Red Dragon. Four 250m RC holes are planned for Q2 2013, with a $122,000 WA Government grant towards drilling costs.
Preliminary XRF on the two Cambridge holes shows long ultramafic intervals, best 14m @ 0.503% Ni and 8m @ 0.61% Ni. The company calls this likely shallow secondary enrichment, and says the holes only tested an upper, lower-MgO unit. Lab assays are due late January 2013.
Gold holes at Athena and Desert Dragon finished, showing strong alteration. Preliminary XRF gave 7m @ 0.53% Ni at Desert Dragon. Cambridge hole 1 finished (168m) and hole 2 stopped at 150m; drilling suspended by heavy rain. Assays still pending.
Final EM and magnetic modelling at Cambridge shows the ultramafic body keeps its original orientation, implying a larger prospective basal contact. Three priority holes are set, two on the newly recognised western margin, with drilling due about 22 November 2012.
The 2012 RC drilling programme began at East Laverton, starting with gold targets at Desert Dragon and Athena, then Cambridge nickel. Preliminary EM results show several nickel drill targets at Cambridge; final targets are due within the week.
Full Project Dragon results: DRAC35 returned 20m @ 0.39% Ni from 100m. Other intercepts, such as 36m @ 0.25% Ni and 20m @ 0.28% Ni, are described by the company as not economically significant. Most holes had no significant intersection.
BHP's 35-hole, 8,560m reconnaissance programme at Project Dragon found nickel sulphides in two holes (DRAC35 and DRAC38), the first at the project. 28 of 35 holes hit komatiite ultramafics. Further plans are to be discussed with BHP.
The refined Cambridge EM survey is underway, a drilling Programme of Works has been approved, and drilling is still planned for about 8 November 2012. Soil sampling on the new nickel tenements is complete, with assays pending.
New soil surveys expanded the Red Dragon rare earth alteration footprint to about 60 sq km, and a 2km x 1.5km high-priority target was identified. Drilling is scheduled for Q2 2013. This builds on the June 2012 Red Dragon finding; it is still an exploration target.
Cambridge nickel work is being accelerated: a refined EM survey in October and RC drilling scheduled for November 2012. Two new tenements (E39/1666 and E39/1667) were granted, adding 76 sq km of 100%-owned ground with anomalous nickel and copper soil values.
A new nickel target was identified at Cambridge, East Laverton (100% owned): a 4,000m x 1,500m ultramafic body with an EM anomaly over 1,000m. Past shallow drilling hit 24m @ 0.54% Ni in weathered rock. Drilling is yet to be scheduled; this opens a nickel thread.
Pine Creek review says soil surveys confirm a large gold system, and PCDD001 is strongly altered with anomalous rare earths. FEND14 (lower grade) is closer to the system core than FEND18, and a new northern gold target was identified. No PCDD001 gold assays are given in the readable text.
2011 assays at East Laverton returned numerous anomalous, low-grade gold intervals at Desert Dragon and Balmoral. The company says these confirm large gold systems open along strike, and names Athena and Green Dragon as new targets. RC drilling continues in H2 2012.
Soil and magnetic review at Red Dragon, East Laverton, indicates a 7km x 4km carbonatite alteration system that may host rare earths, similar in setting to Lynas's Mt Weld, 130km away. It is a new rare earth thread with no drilling yet.
Soil sampling identified a new Golden Dragon gold trend at East Laverton, with a 5km gold anomaly within an inferred 15km strike. It is untested by drilling and follows the Red Dragon survey. It remains an exploration target, not a resource.
The first 2011 Pine Creek diamond hole (PCDD001) reached 550m and met the target formation higher than discovery hole FEND18, consistent with local folding. Early wet weather suspended the rest of the programme until 2012. Core goes to HyLogger, then assay.
East Laverton drilling so far totals 873m air-core and 851m RC. Seven air-core holes at Desert Dragon had no significant gold, but were too shallow (about 70m), so an RC rig replaced the air-core rig. RC assays are pending. Airborne magnetic survey is complete.
Drilling has started at East Laverton, an initial 3,000m programme at Balmoral first, then Desert Dragon. First assays are expected in 4 to 6 weeks, and an airborne magnetic survey is set for October. This resumes drilling suspended after 1,925m in the 2010 wet season.
Re-scanning of old Pine Creek core found visible gold in FEND 18, the earlier discovery hole at Blue Thunder, at 424m depth. CSIRO analysis is under way and new oriented diamond drilling is planned for October 2011. This is a re-examination of old core, not a new drill result.
The last condition on the BHP Nickel West farm-in over East Laverton nickel rights, signed 4 April, has been met, so the agreement is now fully binding. BHP's exploration can be scheduled for the 2011 field season.
BHP Billiton Nickel West signed a farm-in over the nickel rights at East Laverton. It has a 2-year option over 9 tenements (about 498 sq km) with $600,000 of spending, then can earn 51% for $3m over 3 years and 70% by funding a feasibility study. St George keeps gold and other metals. The deal is conditional on a tenement transfer.
Regional soil survey over 850 sq km and 50m infill sampling are complete, defining new drill targets at Balmoral, Desert Dragon and Desert King, plus nickel targets. Final sample results are still awaited, with drilling to include the new targets.
The maiden 3,600m RC drilling programme has started at East Laverton, testing Desert Knight, Desert King and Desert Dragon gold targets. This delivers the Q4 2010 drilling planned at the IPO. Assay results are expected in early 2011.