6 May 2015investor presentation● Neutral
Macquarie conference presentation repeating known points: GLNG nearly 95% complete with first LNG around end-Q3 2015 within the US$18.5bn budget, 2015 capex 44% lower, production costs 10% lower. No new figures in the visible text.
Beach's April report is mostly its own wells. In Santos-operated Cooper work, Narie-4, Coonatie-23 and Barrolka-17 were cased as future producers, Swan Lake-13 reached depth, and Barrolka-16 was drilling. Continues the campaigns; no major Santos news.
Emery-1 in PEL 513 (Santos 60% op, Drillsearch 40%) found about 18.6 m net Patchawarra pay and was cased as a future gas producer. It is the sixth discovery from seven wells in the joint venture campaign; Moonanga South-1 is the last well.
Presentation for an investor site visit (20-23 April 2015) to Moomba, GLNG Fairview and the LNG tanks. Covers Eastern Australia operations, safety and cost savings. The visible text repeats known themes and gives no new results.
Drillsearch's March report: Spinel-1 in PEL 513 (Santos 60% op) found about 11.3 m net Patchawarra pay and will be cased as a gas producer. That makes five discoveries from six wells in the Santos joint venture campaign; Kyanite-1 repeated.
Beach's March report is mostly its own wells. In Santos-operated Cooper work, the nine-well Mudera/Marabooka/Strzelecki program finished with all wells cased, and Narie, Coonatie and Barrolka wells progressed. No major Santos news.
Santos published its 2014 Sustainability Report covering its operations, environment, community and safety approach. A routine report with no new financial or operational results.
Santos published its 2014 Annual Report, restating known results: A$935m net loss after A$1.6bn impairments, A$533m underlying profit, 54.1 mmboe production, 35c dividend. Chairman says GLNG first LNG is on track for 2H 2015. No new information.
Santos released its 2014 Shareholder Review, a summary of the annual report with the same results: A$4,037m sales revenue, A$1,843m operating cash flow, A$935m net loss and 35c dividend. No new information.
Santos issued 5.4m DRP shares at A$7.4192 and 14.3m shares to the underwriter at A$7.53. The notice also discloses a significant Bestari-1 oil discovery in Malaysia's Block R, with 67 m net oil pay; Santos acquired 20% in January 2015. Appraisal is being planned.
Santos set the DRP issue price at A$7.4192 for the 15c final dividend, being the 10-day average price less the 1.5% discount. Administrative follow-up to the February dividend announcement.
Kyanite-1 in PEL 513 (Santos 60% op, Drillsearch 40%) was a wet gas discovery with 24.2 m net Patchawarra pay, cased as a future producer near existing infrastructure. It is the fourth discovery from five wells in the campaign; Spinel-1 is next.
11 Mar 2015asset acquisition disposition▲ GoodMajor
New Guinea Energy completed the sale of its 50% of PPL 269 to Santos' subsidiary Barracuda, for US$32m cash on completion plus up to US$8m if retention or development licences are granted. This completes the deal pending since February.
Drillsearch's February report: Nulla North-1 (PRL 133, Santos 60% op) was cased as a wet gas discovery with about 4.8 m net pay, resolving the pending test. Kyanite-1 spudded in PEL 513. Stanleys-1 and Bauer wells are Beach-operated, not Santos.
Santos signed a contract to supply 82 PJ of gas from the John Brookes field to Alcoa of Australia, starting 2018, over an initial five years with two five-year extension options by mutual agreement. Adds a domestic WA customer; no contract value is stated.
Hides F1 (Hides Deep) reached 4,633 m but the Koi-Iange Formation exploration target lacked reservoir quality. Santos (24% in the exploration component) will abandon that part; the development section will be completed as a PNG LNG gas producer.
Beach's February report is mostly its own wells. In Santos-operated Cooper work, Nephrite South-13, Mudera-19/-21/-22, Correa-2 and Coonatie-24 were cased as future gas producers, and Gaschnitz-2 was cased with fracture stimulation deferred until the joint venture agrees timing. No major Santos news.
3 Mar 2015director officer appointment● NeutralMajor
Chairman Ken Borda will retire at the 30 April 2015 AGM. Peter Coates, a director who was chairman from December 2009 to May 2013, will resume as chairman.
Santos' full-year results presentation repeats known figures: A$935m net loss, A$533m underlying profit, 54.1 mmboe production. It adds cost-cutting detail: 2015 capex 44% lower, unit production costs down 10%, Cooper rigs cut from 7 to 3, and 520 positions removed to date.
Santos reported a 2014 net loss of A$935m after previously advised A$1,563m impairments, but underlying profit rose 6% to A$533m. Final dividend held at 15c (35c for the year), with a DRP underwritten at a 1.5% discount; about A$2.9bn cash and undrawn facilities at year-end.
Santos' audited 2014 accounts show a net loss of A$935m after A$1,563m of impairments, on revenue of A$4,099m. The final dividend is 15c, making 35c for the year, with record date 27 February 2015.
Santos' 2P reserves fell 9% to 1,245 mmboe at end-2014 (from 1,368), mainly a 62 mmboe cut in Gunnedah Basin as flagged in November. 1P reserves rose slightly to 622 mmboe; reserves life 23 years. GLNG 2P reserves rose 4%.
New Guinea Energy said Papua New Guinea government approval was received for the sale of its 50% of PPL 269 to Santos' subsidiary Barracuda. Consideration is US$32m on completion, plus up to US$8m more if licences are granted. Completion is still to occur.
Santos expects a non-cash impairment of about A$1.6bn after tax in its 2014 accounts due to lower oil prices, including A$482m for Cooper Basin oil and A$566m for Gunnedah Basin. GLNG is not impaired; investment grade rating and debt facilities are not expected to be affected.
Drillsearch's January report is mostly its own wells. In PEL 632 (Santos 60% op), Nulla North-1 spudded 27 January and showed multiple wet gas shows, with a drill stem test under way. Aquamarine-1 and earlier results repeated; no confirmed new Santos discovery.
Beach's January report is mostly its own wells. In Santos-operated Cooper work, Big Lake-133 and Nephrite South-11 and -12 were cased as gas producers, Kanowana-11 and Mudera-20 were cased, and Gaschnitz-2 reached total depth. No major Santos news.
Senex's December report confirms Jenners-1 in PEL 100 (Santos 25.835%) was plugged and abandoned at 2,525 m with poor oil shows, ending Senex's northern campaign without commercial discovery. Repeats the 2 January dry-hole result; nothing new for Santos.
Drillsearch's December report is mostly its own wells. It repeats the Yarowinnie South-1 discovery in PEL 513 (Santos 60% op, ~15 m net gas pay, 3,142 m). Aquamarine-1 in PEL 632 (Santos op) was plugged and abandoned as sub-commercial; Nulla North-1 due late January.
Beach's December report is mostly its own wells. In Santos-operated Cooper work, Big Lake-123 and -132 and Nephrite South-10 were cased as gas producers, Tennaperra-4 (Santos 70%) was cased as an oil producer, and Gaschnitz-2 kept drilling. No major Santos news.
Jenners-1 in PEL 100, Cooper Basin was plugged and abandoned at 2,525 m in basement. Santos holds 25.835%, so it is a dry hole for a non-operated exploration well. Resolves the 15 December spud.