Each one in plain English, with the numbers worked through for a shareholder.
31 Aug 2006drilling progress report▲ Good
Jingemia 8 reached total depth of 2,565m on the Perth Basin's L14 licence. The Dongara Sandstone top is interpreted at 2,478m, about 34m above the field's original oil-water contact, subject to wireline logging. Logging is next.
ARC Energy (44.141%) relays Origin's 31 August report: Jingemia 8 at 2,565m, with the Dongara Sandstone interpreted at 2,478m. ARC says the implications can only be judged after logging and evaluation. No new information.
Origin reported FY2006 profit of $332m, up 10%, on revenue of $5,950m, with a final dividend of 9c (18c for the year). Exploration and Production EBITDA fell 11% to $205m. Guidance is for production to reach about 100 PJe a year by year end, from 78 PJe.
Slide presentation for the FY2006 result, repeating the figures already reported: revenue $5,950m, EBITDA $1,087m (+18%), profit $332m (+10%), gearing 42%. Adds that over 200 PJe was added to 2P reserves and that safety targets were missed.
Contact Energy, 51.36% owned by Origin, reported EBITDAF of NZ$557.0m (up 14%) and a profit of NZ$280.9m for the year to June 2006, with a final dividend of 16c. Contact warns future gas supply will be costlier than cheap Maui gas.
Victoria Petroleum relays that Jingemia 8 was at 2,281 metres on 25 August, preparing to drill ahead; the Dongara Sandstone target is at about 2,438m. Routine partner repeat with no result.
Contact Energy's June 2006 quarter operating statistics show total generation of 3,051 GWh, up from 2,916 GWh a year earlier, and 515,000 electricity customers. Relayed by Origin, which holds 51.36%.
Jingemia 8 was drilling ahead at 2,264 metres on 24 August, after 1,728 metres that week, with surface casing set at 532m. Target is 2,560m. Routine update with no result yet.
Partner ARC Energy relays Origin's announcement that Jingemia 8 has spudded in L14 (ARC 44.141%). Its managing director says it is the first well for the refurbished Century 18 rig. Same facts as Origin's release.
Partner Victoria Petroleum (5%) relays the Jingemia 8 start. It says success could lift field output to a targeted 4,000 barrels a day, and it estimates the field could hold 4-8 million barrels recoverable. These figures are Victoria's, not Origin's.
Origin began drilling the Jingemia 8 oil appraisal/development well in Perth Basin licence L14 on 13 August. It targeted the Dongara Sandstone at about 2,438m, with planned total depth of 2,560m; Origin holds 49.189% and ARC 44.141%.
June quarter production rose 2% to 19.2 PJe, but sales revenue fell 10% to $101.4m on lower Perth Basin oil sales. BassGas reached 67 TJ/d after quarter end; Otway start-up slipped to Q4 2006; Ogilvie Creek 1 flowed only 0.1 MMscfd.
Origin will spend a further $114m to double Spring Gully coal seam gas capacity to about 85 TJ/d, supplying QAL, Incitec Pivot and Energex. This follows the Phase 3 and 4 expansion already noted. It is also seeking approval for a 1,000 MW power station on the site.
Contact Energy, 51.36% owned by Origin, will hold its annual meeting in Auckland on 19 October 2006 and release its annual result on 25 August. Director nominations close 21 August. Administrative.
The Victorian Government endorsed Origin's proposed gas-fired Mortlake power station in southwest Victoria. Final approvals are still needed, and the Origin board expects to decide later this year whether to build, depending on electricity supply and demand.
BassGas has begun selling gas (mid-May) and liquids (June), with ramp-up continuing. Cost has risen from $450m to about $750m after rectification work. Arbitration against builder Clough is not expected to conclude until late 2007; Origin's claim is about $100m.
AWE, a 30% BassGas partner, relays Origin's 5 July update: gas and liquids sales have started, cost has risen from $450m to about $750m, and the Clough arbitration (claim about $100m) won't conclude until late 2007. Repeats Origin's own release.
Origin, as 50% operator, announced the Kupe joint venture's go-ahead: cost now estimated at NZ$980m, reserves up about 15% to 389 PJe, online mid-2009 at about 20 PJ a year of gas. Resolves the pending decision; production is a year later than the 2008 previously expected.
Partner New Zealand Oil & Gas announced the Kupe joint venture's unanimous final investment decision: budget NZ$980m, reserves 389 PJe, first gas by mid-2009, construction from September 2006. Same decision as Origin's release; this is NZOG's version.
28 June 2006material agreement termination▼ BadMajor
Origin and Contact agreed to terminate the dual-listed merger agreement signed 20 February 2006, because Origin saw insufficient support from key Contact shareholders. Origin would not improve terms for Contact minorities. Origin keeps its 51.4% Contact stake and Kupe operatorship.
Ooline 1, an oil exploration well in ATP470P (Origin 90%, Santos 10%), began drilling 18 June and was at 1,435 metres, targeting 1,554 metres. It is 8 km east of the Emu Apple 1 discovery. Routine progress update.
Grant King's UBS conference presentation restates Origin's strategy: steady cashflows and EPS growth of 10-15% a year on average, gas close to markets, and 2P reserves with over 25 years of production. No new information evident in the readable text.
Emu Apple 1 (Origin 90%, Santos 10%) is a new oil pool discovery: Boxvale Sandstone recovered 10.5 barrels of 35.5 API oil on test. A deeper zone flowed water. The well is cased and suspended pending completion as an oil producer; the rig moves to Ooline 1.
Contact Energy CEO David Baldwin named his senior management team; trading general manager Steve Cross leaves 30 June 2006 and will consult. Follows Baldwin's May secondment from Origin to Contact. Relayed by Origin, which holds 51.36%.
Contact Energy, 51.36% owned by Origin, will cancel 27.3 million non-voting treasury shares (4.52% of its capital), leaving 576,633,982 shares on issue. Housekeeping; the shares carried no votes, and no tax impact was assessed.
Emu Apple 1, an oil exploration well in ATP470P (Origin 90% via subsidiaries, Santos 10%), began drilling 5 June and was drilling ahead at 839 metres. Routine progress update with no result yet.
Grant King presented an overview of strategy and operations to institutional investors, ahead of a site visit to Spring Gully. Text is largely background on markets and past results (FY2005 revenue $4.9bn, profit $266m); no new announcements evident.
Karen Moses' investor-day presentation on Australian operations restates the integrated gas and power model, with over 1,900 PJe reserves and about 2 million customers. Largely known background; no new figures or decisions visible in the readable text.
Origin released its Sustainability Report for the year to 30 June 2005, sent to shareholders who elected to receive it. It covers environment, social and economic performance; no financial or operational news for shareholders.