Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

7 May 2008drilling progress report● Neutral

Beach weekly report: Coonatie-12 (Origin 10.54%) is cased and suspended as a future gas producer, and Bindah-2 (13.19%) is drilling ahead. Beach's own Bodalla South-19 and Basker-6 ST1 are not Origin wells.

Discuss in chat

1 May 2008drilling progress report● Neutral

NZOG reports production tubing and monitoring gear were installed on Kupe KS-7 ST1 on 30 April and the tree fitted. The rig has moved to KS-6 for completion work. Mid-2009 completion unchanged.

Discuss in chat

1 May 2008drilling progress report● Neutral

Origin reports Kupe KS-7 ST1 completion is done, with tubing installed and the tree fitted. The rig has moved to KS-6. Duplicates NZOG's notice.

Discuss in chat

30 Apr 2008drilling progress report● Neutral

Beach weekly report: Santos-operated McKinlay-9 (Origin 13.19%) is cased and suspended as a future oil producer. Coonatie-12 (Origin 10.54%) reached 3,165m TD and is preparing a drill stem test. Bindah-2 is drilling ahead.

Discuss in chat

24 Apr 2008drilling progress report▲ Good

NZOG reports Kupe KS-7 ST1 was logged and its 5 inch liner set and cemented on 23 April, completing the drilling phase of all three wells. Completion work starts on KS-7 ST1, then KS-8. Mid-2009 completion unchanged.

Discuss in chat

24 Apr 2008drilling progress report▲ Good

Origin reports the Kupe drilling phase is complete, with KS-7 ST1 logged and its 5 inch liner cemented on 23 April. Completion work (tubing and monitoring gear) now begins. This closes out the sidetrack delay. Duplicates NZOG's notice.

Discuss in chat

23 Apr 2008drilling progress report● Neutral

Beach weekly report: in Santos-operated Cooper wells, Cooba-3 (Origin 13.19%) is cased as a future gas producer and Mudera-14 is plugged and suspended. Coonatie-12 (Origin 10.54%) is drilling ahead. Coolangatta-1 is Beach's own, not Origin's.

Discuss in chat

17 Apr 2008drilling progress report▲ Good

Origin reports the Kupe KS-7 sidetrack reached 3,503m on 16 April, redrilling the reservoir section lost to the stuck pipe. This resolves the stuck-pipe problem; logging and a 5 inch liner follow.

Discuss in chat

17 Apr 2008drilling progress report● Neutral

NZOG reports the redrilled Kupe KS-7 sidetrack reached its final depth of 3,503m on 16 April, after the abandoned section was sidetracked. Logging and a 5 inch liner come next. Duplicates Origin's release.

Discuss in chat

16 Apr 2008drilling progress report● Neutral

Beach weekly report: Santos-operated McKinlay-7 (Origin 13.19%) will be a McKinlay oil producer, and Cook-13 (25%) found 13 feet of net oil pay. Mudera-13 is to be a gas producer. Beach's Basker-6 ST1 (not Origin) is a future oil producer.

Discuss in chat

10 Apr 2008drilling progress report▼ Bad

NZOG reports attempts to free the stuck pipe in Kupe KS-7 were abandoned by 9 April. The reservoir section will be sidetracked and redrilled. Mid-2009 completion is still stated. Duplicates Origin's release.

Discuss in chat

10 Apr 2008drilling progress report▼ Bad

Origin says efforts to recover the stuck pipe in Kupe KS-7 are abandoned and the reservoir section will be sidetracked and redrilled. This resolves the 2 April fishing attempt, but adds work to the campaign.

Discuss in chat

9 Apr 2008drilling progress report● Neutral

Beach weekly report: in Santos-operated Cooper wells, Cook-10 (Origin 25%) was plugged and abandoned at 2,042m. Mudera-12 (13.19%) is now cased as a gas producer after strong gas shows, and Coonatie-13 is suspended as a future gas producer.

Discuss in chat

3 Apr 2008drilling progress report▼ Bad

Origin reports pipe stuck at 3,454m in Kupe KS-7's reservoir section after the Farewell top was reached with gas shows; a fishing assembly is being run. The third and last Kupe development well is therefore delayed.

Discuss in chat

3 Apr 2008drilling progress report▼ Bad

NZOG reports Kupe KS-7 hit the Farewell reservoir top on 29 March with gas shows, but pipe stuck at 3,454m in the 8-1/2 inch section; fishing is under way. Mid-2009 completion unchanged. Duplicates Origin's release.

Discuss in chat

2 Apr 2008drilling progress report● Neutral

Beach weekly report: in Santos-operated Cooper wells, Fly Lake-24 (Origin 13.19%) is cased as a gas producer with 27m of gas pay, and McKinlay-8 was unsuccessful. Coonatie-13 (Origin 10.54%) reached 3,091m. Mudera-12 is still under rig repairs.

Discuss in chat

1 Apr 2008drilling progress report● Neutral

QGC weekly report: Matilda-John #1 (Origin CSG 40.625%) finished at 804.6m with 32.8m of coal, was released 29 March and is suspended for possible conversion to a monitoring well. Other wells listed are QGC-only.

Discuss in chat

28 Mar 2008drilling scheduled▲ GoodMajor

The Kupe JV (Origin 50% operator) will drill the Momoho exploration well from May, 6km south of the Kupe field, to about 3,150m, before the Ensco 107 rig is released. A discovery could possibly connect to the Kupe platform.

Discuss in chat

27 Mar 2008drilling progress report▲ Good

NZOG reports Kupe KS-8's 5 inch liner is set and cemented and the well suspended. The rig moves to KS-7 to drill its reservoir section. Mid-2009 completion unchanged. Duplicates Origin's release.

Discuss in chat

27 Mar 2008drilling progress report▲ Good

Origin reports Kupe KS-8 has its 5 inch liner set and cemented and is suspended; the rig moves to KS-7. Two of three development wells now have their reservoir sections drilled.

Discuss in chat

27 Mar 2008drilling progress report● Neutral

QGC weekly report: Jen #2 (Origin 31.25%) reached 625m with 37.8m coal and awaits a workover rig. Matilda-John #1 (Origin 40.625%) reached 804.6m with 32.8m coal and is logging. Woleebee Creek wells are QGC-only.

Discuss in chat

26 Mar 2008drilling progress report▲ Good

Beach weekly report: Santos-operated Cook-11 (Origin 25%) cased as a future oil producer with a 24m gross oil column, and Squalo-1 (13.19%) with 4.5m oil pay. Mudera-12 still awaits top drive parts.

Discuss in chat

20 Mar 2008drilling progress report▲ Good

Origin reports Kupe KS-8 hit the Farewell reservoir top with elevated gas shows, finished coring and reached its 3,834m planned depth. Logs and a 5 inch liner follow. Second Kupe development well nearing completion.

Discuss in chat

20 Mar 2008drilling progress report▲ Good

NZOG reports Kupe KS-8 intersected the Farewell reservoir top with elevated gas shows and reached 3,834m. Logging then a 5 inch liner come next. Mid-2009 completion unchanged. Duplicates Origin's release.

Discuss in chat

19 Mar 2008drilling progress report● Neutral

Beach weekly report: Santos-operated Cooper wells Cook-11 and Squalo-1 (Origin 25% and 13.19% respectively per the table) are in progress, with Fly Lake-24 and Mudera-12 also listed. Mudera-12 is still awaiting top drive repair parts.

Discuss in chat

13 Mar 2008drilling progress report▲ Good

Origin reports Kupe South 6 reached its planned 3,385m, with logs completed and the 5 inch liner cemented, and the well suspended. First of three development wells is finished; KS-8's 8-1/2 inch section is starting.

Discuss in chat

13 Mar 2008drilling progress report▲ Good

NZOG reports Kupe KS-6 reached its planned 3,385m, was logged, had its 5 inch liner set and cemented, and was suspended. Rig now drilling out KS-8's shoe-track. Mid-2009 completion unchanged. Duplicates Origin's release.

Discuss in chat

12 Mar 2008drilling progress report● Neutral

Beach weekly report: Santos-operated Mudlalee-5 (Origin 13.19%) was plugged and abandoned after a water-heavy test. Coonatie-9 (10.54%) was cased as a future gas producer. Cook-12 was a success, and Murrippi-1 is not an Origin well.

Discuss in chat

12 Mar 2008drilling progress report● Neutral

QGC weekly report: Bellevue #15 (Origin 29.375%) reached 527m with 33.9m coal and awaits a workover rig. Matilda-John #1 (Origin 40.625%) is coring at 504.7m. Teviot #1 and Woleebee Creek #4 are QGC-only wells.

Discuss in chat

6 Mar 2008drilling progress report▲ Good

NZOG reports Kupe South 6 (Origin 50% operator) drilled its 8-1/2 inch section to 3,313m with a hydrocarbon column in the Farewell Formation, as anticipated. Planned depth is 3,385m. Mid-2009 completion unchanged. Duplicates Origin's release.

Discuss in chat