Stockle - the stock oracle

Origin Energy Limited

ASX:ORG
A$11.01Close 7 Oct 2026 · delayed

Past year: ▼ 10%(10.76 – 12.38 AUD)

Market cap
A$19.39bn
Shares on issue
1.76bn
Story beats
470 since 2006
Last event
13 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

19 May 2009drilling progress report● Neutral

Origin lodged AWE's 19 May Hovea-13 suspension update. Duplicate of the operator's release.

Discuss in chat

13 May 2009drilling progress report● Neutral

Beach weekly report: Origin's 13.19% Cooper wells Cowralli-10 (1,964m) and Tindilpie-8 (889m) are drilling ahead. Routine update with no result.

Discuss in chat

12 May 2009drilling progress report● Neutral

AWE reported Hovea-13 (Origin 50%) drilled ahead to 1,886m, 542m in the week, toward a planned 2,200m. Delays waiting on rig equipment and repairs continue. No result yet.

Discuss in chat

12 May 2009drilling progress report● Neutral

Origin lodged AWE's 12 May Hovea-13 update (1,886m). Duplicate of the operator's release.

Discuss in chat

6 May 2009drilling progress report▲ Good

Beach weekly report: Origin's 13.19% Cooper wells Cowralli-12 (3,239m) and Tindilpie-10 (3,214m) have been cased and suspended or are being cased as future Patchawarra gas producers. Routine update.

Discuss in chat

5 May 2009drilling progress report● Neutral

AWE reported Hovea-13 (Origin 50%) had run casing at 1,344m, with only 20m drilled in the week because of delays waiting on rig repairs. Planned depth remains about 2,200m. No result yet.

Discuss in chat

5 May 2009drilling progress report● Neutral

Origin lodged AWE's 5 May Hovea-13 update (casing run at 1,344m). Duplicate of the operator's release.

Discuss in chat

29 Apr 2009drilling progress report● Neutral

Beach weekly report: Origin's 13.19% Cooper wells continue. Cowralli-12 is at 3,239m pulling out to log and Tindilpie-10 is drilling at 2,320m. Routine update.

Discuss in chat

28 Apr 2009drilling progress report● Neutral

AWE reported Hovea-13 (Origin 50%) drilling ahead at 1,324m after 1,217m in the week, toward a planned 2,200m. No result yet.

Discuss in chat

28 Apr 2009drilling progress report● Neutral

Origin lodged AWE's Hovea-13 update (1,324m, drilling ahead). Duplicate of the operator's release.

Discuss in chat

22 Apr 2009drilling progress report● Neutral

Beach weekly report: Origin's 13.19% Cooper Basin wells continue. Nephrite-2 is cased and suspended as a gas producer at 3,258m, Cowralli-12 is at 2,106m and Tindilpie-10 is drilling surface hole. Routine update.

Discuss in chat

21 Apr 2009drilling spud▲ Good

AWE started drilling the Hovea-13 oil development well in L1, Perth Basin (Origin 50%, AWE 50% operator), planned to about 2,200m. It is the first of a four-well campaign, ending the wait for a rig noted earlier.

Discuss in chat

21 Apr 2009drilling spud● Neutral

Origin lodged AWE's release that Hovea-13 has started drilling in the Hovea oilfield (Origin 50%). Duplicates the AWE announcement.

Discuss in chat

15 Apr 2009drilling progress report● Neutral

Beach weekly report: Origin's 13.19% Cooper Basin wells continue, with a well at 3,258m preparing to log, Cowralli-12 drilling surface hole at 295m. South July-1ST1 in Egypt (no Origin interest) is plugged and abandoned. Routine update.

Discuss in chat

8 Apr 2009drilling progress report● Neutral

Beach weekly report: Nephrite-2 and Tindilpie-7 are Origin 13.19% Cooper wells; the report shows Mudrangie-type well at 3,223m cased and suspended as a future gas producer and Nephrite-2 at 1,929m. Egypt's South July-1ST1 (no Origin interest) was plugged dry.

Discuss in chat

1 Apr 2009drilling progress report▲ Good

Beach weekly report: Origin's Tindilpie-7 (13.19%) is cased and suspended as a future gas producer at 3,248m. Nephrite South-5 is at 3,060m and Nephrite-2 is drilling surface hole at 720m, all 13.19%. Routine update.

Discuss in chat

25 Mar 2009drilling progress report● Neutral

Beach weekly report: Origin's Nephrite South-5 (13.19%) is drilling at 1,103m, and Tindilpie-7 (13.19%) reached 3,248m TD and is preparing to log. Routine Cooper Basin update.

Discuss in chat

18 Mar 2009drilling progress report▲ Good

Beach weekly report: Origin's Fly Lake-26 (13.19%) is cased and suspended as a future gas producer at 2,952m. Nephrite South-5 (13.19%) is drilling at 1,778m. The South July-1 Egypt well does not involve Origin.

Discuss in chat

11 Mar 2009drilling progress report● Neutral

Beach weekly report: Origin's Fly Lake-26 (13.19%) reached 2,952m TD and is preparing for logging. Nephrite South-5 (13.19%) is drilling surface hole at 258m. Routine Cooper Basin update.

Discuss in chat

4 Mar 2009drilling progress report▲ Good

Beach weekly report: Origin's Mudrangie South-1 (13.19%) reached 3,223m TD, to be cased as a future gas producer. Fly Lake-26 (13.19%) is drilling at 1,071m. Routine update.

Discuss in chat

25 Feb 2009drilling result▼ Bad

Beach weekly report: Origin's Muteroo-6 (13.19%) was plugged and abandoned at 1,971m, an unsuccessful well. Mudrangie South-1 (13.19%) is drilling at 3,058m. A minor dry hole for Origin's Cooper Basin interests.

Discuss in chat

18 Feb 2009drilling progress report● Neutral

Beach weekly report: Origin's Muteroo-6 (13.19%) is at 1,971m, Mudrangie South-1 (13.19%) is drilling at 1,737m, and Fly Lake-27 (13.19%) is to be cased as a future Permian gas producer at 2,944m. Routine update.

Discuss in chat

11 Feb 2009drilling progress report● Neutral

Beach weekly report: Origin's Muteroo-6 (13.19% listed) is drilling at 1,592m, and Fly Lake-27 (13.19%) at 2,291m. Beach's Jackson East-2 was successful. Routine update.

Discuss in chat

5 Feb 2009drilling progress report● Neutral

Geodynamics says the closed-loop test is 75% done (31 of 42 days), finishing mid to late February, then external review. The Savina 1 stuck pipe is being recovered, with about 400m released. Origin holds 30% of the JV.

Discuss in chat

4 Feb 2009drilling progress report● Neutral

Beach weekly report: Origin's Bindah-3 (20.21%/13.19% listed) is to be cased and suspended as a future Patchawarra producer at 3,040m. Beach's Perlubie-1 found oil, with no Origin interest. Routine update.

Discuss in chat

28 Jan 2009drilling result▼ Bad

Beach weekly report: Origin's Tirrawarra-77 (13.19%) was plugged and abandoned after no commercial hydrocarbons at 3,044m. Bindah-3 (13.19%) is drilling at 2,603m. A minor dry hole for Origin's Cooper Basin interests.

Discuss in chat

21 Jan 2009drilling progress report● Neutral

Beach weekly report: Origin's Bindah-3 (13.19%) is cementing surface casing at 920m and Tirrawarra-77 (13.19%) is coring at 2,993m. Beach's Gunyah-1 was dry. Routine update.

Discuss in chat

14 Jan 2009drilling progress report● Neutral

Geodynamics (Origin holds 30% of the Innamincka JV) hit a flowing fracture in the granite at Savina 1 (3,700m), but the drill pipe is stuck. The closed-loop test is delayed by leaking heat exchanger plugs, and is to run six weeks once restarted.

Discuss in chat

14 Jan 2009drilling progress report● Neutral

Beach weekly report: Origin's Spencer West-3 (13.19%) was successful and Tirrawarra-77 (13.19%) was cased and suspended as a future Patchawarra/Tirrawarra gas and oil producer. Beach's Fermat-1 found no significant hydrocarbons. Routine update.

Discuss in chat

8 Jan 2009farm in farm out agreement▲ GoodMajor

Partner Pancontinental says Origin will fully fund a 3D seismic survey (minimum US$10m) and all costs for two years from 22 Jan 2009, lifting its earned interest in Kenya L8 to 75%. L8 area shrinks, L9 is relinquished; this follows the pending 21 Jan decision.

Discuss in chat