15 June 2009well test result▲ Good
Phase 5 metallurgical testing on a 530 kg bulk sample taken from underground, run at SGS Lakefield with real mine water through the flow sheet filed in the May 2008 project description, returned positive locked-cycle results. It is a processing test, not a well test, and it supports the permit applications then in environmental assessment before the Mackenzie Valley review board.