Each one in plain English, with the numbers worked through for a shareholder.
15 Feb 2008drilling result▲ Good
Kalkaroo drilling returns e.g. 100m at 1.13% Cu and 0.84 g/t Au (KKRC160), with four rigs on site; early tests recover over 40% of native copper by screening. Mutooroo metallurgy is positive. The tax office ruling on the Curnamona distribution is still awaited.
Mutooroo feasibility drilling reaches 50 holes (7,921m) in 2007, with new footwall zones, e.g. 24m at 1.3% Cu (MTRC115) and 17m at 1.34% Cu (MTRC107). Early metallurgy shows over 99% recovery to concentrate. Deposit remains open to the north and at depth.
Curnamona Energy drills 33 more Oban holes, extending uranium mineralisation several hundred metres south; the area is nearing 2 sq km. No JORC resource is possible until leach recoveries are proven; draft mining plan lodged with PIRSA.
Havilah farms into EL 3605 (Prospect Hill tin), able to earn up to 85% by completing a feasibility study. It holds an inferred 172,000t at 1.15% tin. A 1,100m drilling programme starts next week. A new project outside the core assets.
Geothermal Resources' shallow Frome holes record up to 45°C at 440m (Frome 3), with 40°C+ at 500m across at least 400 sq km. Company infers over 200°C is likely near 4,000m (an inference). Further shallow holes come before deeper tests.
First Portia diamond hole (PTDD206) returns 56m at 4 g/t gold, ending in mineralisation at 136m. The company says this rules out contamination doubts about earlier air-drill results and supports the trial open pit; mining lease still pending.
Curnamona Energy finds a third zone of significant uranium mineralisation at Oban, in a new northern area open to the north, from at least three holes. Step-out drilling continues; the leach trial awaits permits.
Havilah signs a binding Heads of Agreement with Glencore to fund a $14m Kalkaroo feasibility study. Glencore would arrange project financing for a mining JV, taking a 14% interest and metals offtake. This answers the open search for a Kalkaroo funding partner.
Geothermal Resources (63.6% Havilah) completes Frome 2 to 500m, ending in over 150m of siltstone and shale expected to act as insulating cap rock. Frome 1 was suspended at 189m after drilling problems. The 8-hole programme continues.
Curnamona Energy's Oban drilling hits 5.3m at 0.085% eU3O8 (CEY098), 80m south of the best Oban hole (8.2m at 0.08%). The mineralised zone remains open in two directions; leach trial permitting continues.
Red Metal reports it has met its earn-in spending and earned 70% of the Pernatty Lagoon project, leaving Havilah with 30%. This completes the earn-in agreed earlier. Latest hole PN0708 hit hematite breccia with traces of copper minerals at 821-840m.
Mutooroo feasibility drilling, funded by Heilongjiang, returns 17m at 2.11% Cu, 0.30% Co (MTRC070) and shallower intercepts of 1.76-2.27% Cu. Nearer-surface grades are described as encouraging for open pit mining. Proof-up of measured resource for 20,000t Cu and 2,000t Co a year targeted over the next six months.
Mutooroo feasibility drilling, funded by Heilongjiang, returns 27m at 1.75% Cu, 0.22% Co (MTRC055) and a thickened sulphide body up to 30m wide. Havilah aims to prove up ore for about 20,000t Cu and 2,000t Co a year within six months.
Media release repeating the Mutooroo results (27m at 1.75% Cu) and the aim of a mining decision within six months. Heilongjiang may earn 50% by funding the feasibility study and development. No new data.
Geothermal Resources (63.6% Havilah) will start shallow temperature-gradient drilling at its Frome project in early March, using two Havilah-contracted rigs, to at least 500m depth. Three holes first, five more later. A $2.4m federal grant matches funding.
Further washed Portia bedrock samples extend gold intervals, e.g. 26m at 15.4 g/t (PTAC191) and 13m at 33.5 g/t (PTAC193). Gold is concentrated in very high-grade zones that are hard to define by drilling, so a trial open pit remains the plan.
Kalkaroo resource rises 28% to 108Mt (measured and indicated) from 85Mt, adding a 23Mt indicated West Kalkaroo component at 0.58 g/t Au, 0.33% Cu. Mineable open-pit ore is 85Mt at 0.51 g/t Au, 0.45% Cu. A feasibility study starts in February, managed by new hire Peter Leah.
Media release repeating the Kalkaroo resource increase to 108Mt and the start of a feasibility study with $1.0m assigned this year. The chairman calls passing 100Mt a milestone. No new figures beyond the ASX release.
Havilah plans 2007 exploration for hard rock uranium around the historic Radium Hill mine, which produced about 1150 tonnes of uranium in 1954-61. Surface sampling, trenching and drilling are planned before mid-year. No results yet.
Last West Kalkaroo assays include 102m at 0.83% Cu, 1.6 g/t Au (KKRC136), one of Havilah's best Kalkaroo results. Ore-grade strike now exceeds 600m and is open to the west. Sample quality remains a concern; a resource update and feasibility study follow.
Havilah says washed Portia samples show high-grade bedrock gold (6m at 55 g/t and 6m at 57 g/t) and it is planning a trial open pit. A mining lease claim is lodged and native title talks have started. A JORC resource will take longer.
Two more West Kalkaroo holes return 27m at 1.18% Cu, 2.03 g/t Au and 33m at 0.43% Cu, 1.6 g/t Au, extending mineralisation to over 500m of strike. Wet samples remain a concern. An updated resource is still awaited.
Three more West Kalkaroo holes return wide copper-gold, e.g. 81m at 0.48% Cu, 1.6 g/t Au, over 400m of strike. Sample quality and coarse native copper still make assays unreliable. An updated Kalkaroo resource, now 70Mt, awaits the full drilling round.
Havilah signs a non-binding MOU with Heilongjiang Resources for a Mutooroo copper-cobalt joint venture. HJR funds a $3m feasibility study and then development funding, earning up to 50%. Initial funds are advanced; FIRB approval and a formal agreement are pending. This follows the earlier lapsed Chinese MOU.
Oban drilling adds 14 holes; best is 6.3m at 0.036% eU3O8 (0.23 metre-%). The 32 mineralised holes average 0.11 metre-% over 60,000 square metres. The results are preliminary and need equilibrium checks before grades are treated as true U3O8.
Curnamona Energy says Oban drilling restarts the next day after a crew break and rig repairs. No new results; the release describes the prospect as 100% owned, with Havilah holding 50.6% of Curnamona.
West Kalkaroo holes return strong copper-gold, e.g. 36m at 0.85% Cu, 0.74 g/t Au, and ore-grade mineralisation now spans 2.5km at Kalkaroo. Sample quality problems mean re-drilling is needed before use in resource figures. Portia trial pit floor drilling is complete.
Curnamona Energy, 50.6% owned by Havilah, reports a uranium discovery at Oban in palaeochannel sands, e.g. 2.6m at 0.112% eU3O8. Six of eight holes exceed 0.1 metre-% grade-thickness. A new uranium thread, 60km north of the Honeymoon deposit.
Three more Central Kalkaroo holes hit wide low-grade gold in the breccia vein zone, best 15m at 1.7 g/t Au (KKRC120). This extends the zone by 200m of strike. Two West Kalkaroo holes await assays; a 16-hole Portia trial pit program is being completed.
Washed and bottle-roll assays show higher gold grades in Portia bedrock than conventional assays (e.g. PTAC 177: 43.5 g/t washed). Havilah estimates about 8Mt of bedrock of uncertain grade, says a JORC resource will be hard, and plans a trial pit and mining permits.