16 Dec 2013drilling result▲ Good
Thirteen shallow holes over 1,144 metres at San Ignacio, then being developed for first production in the first half of 2014. Best hole ESI13-106 returned 263 g/t silver and 7.27 g/t gold over 15.81 metres true width, thicker than the 5.39 metres seen 25 metres away in 2011, supporting the company's view that high-grade pods sit inside the Intermediate Vein.