3,044bcf gas
contingent · P90 3044 / P50 3044 / P10 3044
41bcf gas
reserve · P90 41 / P50 41 / P10 427
Valued at: Tlou Energy Ltd 100%Permit: LESEDI CBM PROJECT
3 notes for review
- LATEST ESTIMATE JUMPED: Gas 45.6 -> 3044 bcf vs the previous estimate (2018-02-21) - check units before relying on it
- gas: single estimate 3044 bcf used for P90/P50/P10
- gas: low case not stated; set equal to P50
15bcf gas
reserve · P90 0.01 / P50 15.5 / P10 175
Valued at: 100% of volumes already stated net
3 notes for review
- no permit recorded for Mamba CBM Project
- NO STAKE: value shows as zero until ownership is known
- LATEST ESTIMATE JUMPED: Gas 0.4 -> 15.5 bcf vs the previous estimate (2017-02-15) - check units before relying on it
50%
Probability of
3,101
bcf
50.9%
Value retained
$631,400,000.00
AUD
Leverage per instrument
ASX:TOU
35066%
$0.00 → $1.05