Stockle - the stock oracle

Buru Energy

ASX:BRU
A$0.013Close 7 Oct 2026 · delayed

Past year: ▼ 28%(1.20c – 2.40c AUD)

Market cap
A$17.7m
Shares on issue
1.36bn
In-ground value
A$1.53bn
Risked multiple
under review
Story beats
310 since 2009
Last event
19 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

6 Sept 2013drilling progress report▲ Good

Ungani 3D seismic acquisition restarted (243 sq km, ~50-55 days), with an early fast-tracked subset over the Ungani Oilfield itself timed to help site the upcoming Ungani 3 well.

Value this in the calculator →Discuss in chat

10 July 2013drilling progress report▲ Good

The 243 sq km Ungani 3D seismic survey (suspended in 2012) recommenced after renewed Traditional Owner engagement, aiming to firm up the field's ~10 million recoverable barrels estimate and site further development wells.

Value this in the calculator →Discuss in chat

23 May 2013farm in farm out completion▲ GoodMajor

Buru's own completion announcement confirmed the Fitzroy Blocks sale to Mitsubishi and Rey Resources closed once regulatory approvals cleared, with Buru receiving the full ~$21.059M cash consideration.

Value this in the calculator →Discuss in chat

23 May 2013farm in farm out completion▲ GoodMajor

Rey Resources completed its additional 15% acquisition in the Fitzroy Blocks (EP457/458), paying Buru $6.017 million once DMP and FIRB approvals cleared - leaving Buru 37.5% (operator), Mitsubishi 37.5%, and Rey 25% (10% free-carried).

Value this in the calculator →Discuss in chat

19 Mar 2013drilling progress report▲ GoodMajor

Yulleroo 4 confirmed a very significant gas column supporting Yulleroo as part of the regional Laurel Basin Centred Gas System (RISC: over 6 TCF net to Buru in the Yulleroo area), while Cyrene 1 confirmed regional Goldwyer Shale prospectivity as prognosed and Ungani production was briefly suspended for logging.

Value this in the calculator →Discuss in chat

18 Mar 2013farm in farm out completion▲ GoodMajor

Rey Resources agreed to buy an additional 15% interest in the Fitzroy Blocks (EP457/EP458) from Buru for $6.017 million, taking its total stake to 25% (its original 10% had been free-carried by Gujarat NRE Oil, which Buru had bought outright in 2012). As part of the same transaction, Mitsubishi Corporation bought a 37.5% interest in the Fitzroy Blocks from Buru, with Buru remaining operator - Rey must now fund 16.7% of forward capital costs on its enlarged stake, rather than being carried.

Value this in the calculator →Discuss in chat

18 Mar 2013farm in farm out completion▲ GoodMajor

Mitsubishi and Rey Resources paid Buru a combined $21.058M cash to take stakes in the Fitzroy Blocks (EP457/EP458), diluting Buru's interest from 90% to 37.5% (Mitsubishi 37.5%, Rey 25%).

Value this in the calculator →Discuss in chat

18 Mar 2013farm in farm out completion● Neutral

ASF Group (a ~22.7%-shareholder in Rey Resources) confirmed Rey Resources signed an agreement to acquire an additional 15% interest in the Fitzroy Blocks (permits EP457/EP458) from Buru.

Value this in the calculator →Discuss in chat

15 Mar 2013farm in farm out agreement● Neutral

New Standard Energy and Green Rock Energy unwound their existing Laurel Project farm-in/area-of-mutual-interest arrangement: Green Rock gave up all its rights - including the 15% interest it was due to earn in permit EP417 - in exchange for New Standard taking over Green Rock's 40% stake in the neighbouring Seven Lakes acreage. New Standard ends up with 65% operated equity in EP417 (Buru holding the other 35%, unchanged) and full ownership of Seven Lakes.

Value this in the calculator →Discuss in chat

14 Mar 2013drilling progress report▲ GoodMajor

Yulleroo 4's logging finished and 5½-inch casing was being run for suspension; gas shows spanned a substantial 1,686m interval (2,160m to the 3,846m total depth), confirming a very large gas column.

Value this in the calculator →Discuss in chat

7 Mar 2013drilling progress report▲ Good

Yulleroo 4 was deepened to a revised 3,846m total depth (past the 3,800m plan) as gas shows continued; some sands showed fair-to-good interpreted reservoir potential.

Value this in the calculator →Discuss in chat

28 Feb 2013drilling progress report▲ GoodMajor

Yulleroo 4 reached 3,649m, intersecting the Upper/Lower Laurel Formations and Yulleroo Gas Sands on prognosis (~200m structurally lower than Yulleroo 3) with gas signatures matching the other Yulleroo wells; higher mud weights gave more stable hole conditions than earlier wells.

Value this in the calculator →Discuss in chat

25 Feb 2013drilling result▼ Bad

Cyrene-1's flow test of the Willara Formation recovered no hydrocarbons; the EP438 JV (Buru 37.5%, Mitsubishi 37.5%, Key 20%, Indigo 5%) plugged and abandoned the well, though a full Goldwyer Formation data set was captured for future unconventional assessment.

Value this in the calculator →Discuss in chat

12 Feb 2013drilling progress report● Neutral

Cyrene-1 continued coring the Goldwyer Formation (1,018m RT); after logging, the hole will be cased and drilled ahead to the conventional Willara Formation objective, with the next update expected once that target is evaluated.

Value this in the calculator →Discuss in chat

11 Feb 2013drilling progress report▲ GoodMajor

Cyrene-1 cored the Goldwyer Formation to 1,014m RT with further oil and gas shows; Key's MD called the results 'extremely significant' for both conventional and unconventional potential, confirming an oil-generating source rock.

Value this in the calculator →Discuss in chat

8 Feb 2013drilling progress report▲ Good

Cyrene-1's second Goldwyer core barrel reached 986m RT with gas readings climbing (10.1-14.5 units, C5 up to 70ppm) - encouraging unconventional shows.

Value this in the calculator →Discuss in chat

8 Feb 2013resource reserve update▲ GoodMajor

RISC's first whole-of-permit independent assessment of the Laurel Formation Basin Centred Gas System (drawing on 22 wells, including five drilled by the Buru/Mitsubishi JV) confirmed the potential already suggested by in-house and earlier independent analyses.

Value this in the calculator →Discuss in chat

5 Feb 2013drilling progress report▲ GoodMajor

Coring began on Cyrene-1's Goldwyer shale; oil shows so far were consistent with those at Hedonia-1 (160m away), supporting the JV's view that the Goldwyer Shale here sits in the oil generation window.

Value this in the calculator →Discuss in chat

4 Feb 2013drilling progress report▲ GoodMajor

Cyrene-1 reached its 958m Goldwyer coring point with oil shows across a 43m interval (915-958m) in the lower Grant/Goldwyer Formations - an active-source-rock indication with unconventional potential, at the same depth the Goldwyer top was found in nearby Hedonia-1.

Value this in the calculator →Discuss in chat

30 Jan 2013drilling progress report● Neutral

Key Petroleum's daily Cyrene-1 report: top drive serviced and mud pump repairs continuing, with a coring crew mobilising to core the Goldwyer Formation at ~940m.

Value this in the calculator →Discuss in chat